LER-1980-008, /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2441980008R03 - NRC Website |
|
text
NRC,PbRM 366
,(7-77+>
U. S. NUCLEAR REGULATORYCOMMISSION
~O 7
8 CON'T
~01 7
8 i
80-008/03L-0 LtCENSEE EVENT REPOR~
CONTROL BLOCK:
Q1 (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)
I 6
NY R
E G
1 Q20 0
0 0
0 0
0 0
0 Q3.4 1
1 1 1QP~QE 9
LICENSEE CODE 14 15 LICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58 soUROE LLJOB 0
5 0
0 0
2 4
0 0
9 1
0 8
0 B
1 '
0 7
8 Q
60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During performance of PT-12.2 for "B" Emergency Generator (EG) bus 16 breaker from B" EG did not close.
(T. S ~ 6. 9 ~ 2. b(2)) ~
"A" EG was started and tied into bus 1 8, 4
and was capable of supplying to redundant bus 14 in the event of a loss of off-site F
6 power.
~OB
~O7
~OB 80 7
8 9
[oO~]
7 8
SYSTEM
CAUSE
CAUSE COMP VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SVBCODE
~EE Qll E
Q12
~B Q13 R
E L
8 Y
X Q14
~D Q>>
E Qls 9
10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LF RIRO EVENT YEAR REPORT NO.
CODE TYPE NO.
Q17 REPERP
~80
+
~00 8
Q~
~03
+L
+0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDX PRIME COMP.
COMPONENT TAKEN ACTION ON PLANT METHOD HOURS +22 SUBMITTED FORM SUB.
SUPPLIER I MANUFACTURER Qls ~E Qls
~EQ20
~E QE 0
0 0
Q23 gJ QE pJ QEE 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o
Binding condition of control relay anti-pump release lever guide pin.
Closing cir.
continuity was verified.
Breaker was observed during test operations, then control relay was replaced.
Breaker then tested successfully 5 times.
Removed relay was examined and guide pin split end was closed slightly, freeing binding condition.
ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ
~z Q>>
z Q34 NA 7
8 9
10 11 PERSONNEL EXPOSURES 7
8 9
11 12 13 PERSONNEL INJURIES 45 7
8 9
FACILITY
~SO METHOD OF STATUS
% POWER OTHER STATUS ~
DISCOVERY s ~ Qss ~Q20 NR
~BQEI 8
9 10 12 13 44 45 46 DISCOVERY DESCRIPTION Q32 Operator observation LOCATIONOF RELEASE Q NA 80 80 80 80 7
8 9
11 12 80 LOSS OF OR DAMAGETO FACILITYQ43 TYPE
DESCRIPTION
z Q4, NA 8
9 10 PUBLICITY IS D
DESCRIPTION 46 KZ ~>Q44 NA 7
8 9
10
~ 4IGIPF PREPARER Clair Edgar NRC USE ONLY 80 2
68 69 80 o PHDNE 3 1 5 524-4446, ext ~ 248
gt
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000244/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000244/LER-1980-001-03, /03L-0:on 800118,while Performing PT-12.1, Emergency Generator 1A Would Not Accept Nameplate Steady Load Rating.Caused by Adjusting Governor Setting to Incorrect Value Indicated on Dynotape Sticker Setting Mod | /03L-0:on 800118,while Performing PT-12.1, Emergency Generator 1A Would Not Accept Nameplate Steady Load Rating.Caused by Adjusting Governor Setting to Incorrect Value Indicated on Dynotape Sticker Setting Mod | | | 05000244/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000244/LER-1980-002-03, /03L-0:on 800331,during Review of Special Instructions,Discovered That Time from Previous Boron Concentration Sample Exceeded 75 Days.Caused by Inadequate Guidance for Bimonthly Sampling Schedule.Schedule Changed | /03L-0:on 800331,during Review of Special Instructions,Discovered That Time from Previous Boron Concentration Sample Exceeded 75 Days.Caused by Inadequate Guidance for Bimonthly Sampling Schedule.Schedule Changed | | | 05000244/LER-1980-003-01, /01T-0:on 800414,during Steam Generator Inservice Insp,One Tube in a Steam Generator & 34 Tubes in B Generator Showed Pluggable Indications.Probably Caused by Concentration of Caustics in Crevices | /01T-0:on 800414,during Steam Generator Inservice Insp,One Tube in a Steam Generator & 34 Tubes in B Generator Showed Pluggable Indications.Probably Caused by Concentration of Caustics in Crevices | | | 05000244/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | | | 05000244/LER-1980-004, Forwards LER 80-004/01T-0 | Forwards LER 80-004/01T-0 | | | 05000244/LER-1980-004-01, /01T-0:on 800506,during post-installation Test of Reactor Vessel Head Vent,Dc Power Switches for Both Trains of Low Temp Overpressurization Protection Found in Off Position W/No RCS Vent Open.Cause Unknown | /01T-0:on 800506,during post-installation Test of Reactor Vessel Head Vent,Dc Power Switches for Both Trains of Low Temp Overpressurization Protection Found in Off Position W/No RCS Vent Open.Cause Unknown | | | 05000244/LER-1980-005-01, /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position | /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position | | | 05000244/LER-1980-005, Forwards LER 80-005/01T-0 | Forwards LER 80-005/01T-0 | | | 05000244/LER-1980-006, Forwards LER 80-006/01T-0 | Forwards LER 80-006/01T-0 | | | 05000244/LER-1980-006-01, /01T-0:on 800711,during Routine Analysis of Boric Acid Tank Samples,Concentration Exceeded Tech Spec Limit on Three Occasions.Caused by Entry of Ascarite Into Tank. Reagent Check Now Performed W/Sampling | /01T-0:on 800711,during Routine Analysis of Boric Acid Tank Samples,Concentration Exceeded Tech Spec Limit on Three Occasions.Caused by Entry of Ascarite Into Tank. Reagent Check Now Performed W/Sampling | | | 05000244/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000244/LER-1980-007-03, /03L-0:on 800829,controller TC-402R for Channel II Did Not Respond to Change in Input.Caused by Faulty Main Amplifier Bridge Assembly & Low Limit Transmitter.Controller Replaced & Calibr | /03L-0:on 800829,controller TC-402R for Channel II Did Not Respond to Change in Input.Caused by Faulty Main Amplifier Bridge Assembly & Low Limit Transmitter.Controller Replaced & Calibr | | | 05000244/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000244/LER-1980-008-03, /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed | /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed | | | 05000244/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000244/LER-1980-009-03, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running | /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running | | | 05000244/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000244/LER-1980-010-03, /03L-0:on 801125,pinhole Leak Found in Weld on RHR Thermowell.Caused by Poor Quality Weld.Weld Repaired | /03L-0:on 801125,pinhole Leak Found in Weld on RHR Thermowell.Caused by Poor Quality Weld.Weld Repaired | | | 05000244/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000244/LER-1980-011-03, /03L-0:on 801211,bus 17 Breaker from 1B Emergency Generator Failed to Close.Cause Not Stated.Testing Interval Shortened to Verify Operability 810106 | /03L-0:on 801211,bus 17 Breaker from 1B Emergency Generator Failed to Close.Cause Not Stated.Testing Interval Shortened to Verify Operability 810106 | |
|