ML17305B736

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1991 for Palo Verde Unit 3
ML17305B736
Person / Time
Site: Palo Verde  
Issue date: 05/31/1991
From: Chavet K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305B735 List:
References
NUDOCS 9109170277
Download: ML17305B736 (2)


Text

SHUTDOWNS AND POWER REDUCTIONS May 1991 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet No.

Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.

Code Cause and Corrective Component Action to Code~

Prevent Recurrence 91/03 03/16/91 S

646.6 N/A N/A N/A t

Continuation of 2nd refueling outage.

This includes 69.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> of outage extension due to planned work.

91/03 03/16/91 F

97.4 N/A N/A N/A Outage extension due to unplanned work.

a~,~F-Forced ZO S-Scheduled aO OQ nw OC

. rq~

OO O~

OO~

acne, AM R

2Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 15 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

~Exhibit H-Same Source

'k I