Submits Revised Implementation Schedule for ATWS Rule,Per NRC 870224 Deadline.Specific Info Required by 10CFR50.62 Will Be Submitted After NRC Complete Review of CESSAR Submittal
ML17303A344
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/13/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-00074-JGH-B, 161-74-JGH-B, TAC-59124, TAC-62798, TAC-67168, NUDOCS 8703190011
Download: ML17303A344 (4)


Text

REQULAT INFORMATION DISTRIBUTI0

/STEN* (R IDS)

ACCESSION NBR: 8703i900f f DOC. DATE: 87/03/i3 NOTARIZED:

NO DOCKET FACIL".SAl-50-528 Palo Verde Nuclear S+a+ion>

Unit i> Arizona Pub li 05000528 STN'-,50-529 Palo Verde Nuclear Station>

Unit 2> Arizona Pub li 05000529 STN-$0-530 Palo Verde Nuc lear S+at i on>

Unit 3> Arizona Pub 1 i 05000530 AUTH. MANE AUTHOR AFFILIATION HAYNES> J. Q.

Arizona. Nuclear Power ProJect

( formerly Arizona Public Serv RECIP. NANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits revised implementation schedule for ATWB rule> per NRC 870224 deadline. Specific info required bg i0CFR50. 62 wi11 be submitted after NRC complete review of CESBAR submittal.

DISTRIBUTION CODE:

A055D COPIEB RECEIVED: LTR t

ENCL N SIZE:

TITLE: OR/Licensing Submittal:

Salem ATWS Events QL-83-28 NOTES: Standardized plant. N. Davis. NRR: fCg.

Standardized plant. N. Davis. NRR: iCg.

Standardized plant. N. Davis. NRR: fCg.

05000528 05000529 05000530 REClPIENT ID CODE/NANE PNR-8 ADTS PNR-8 PEICSB PNR-8 PD7 LA LICITRA>E PNR-8 RBB INTERNAL ACRS IE/DI NRR LASHER> D NRR PNR-8 ADTS NRR/DSRO/RSIB OQC/HDSf EXTERNAL: LPDR NSIC NOTES:

COPIES LTTR ENCL i

2 f

6ff i

RECIPIENT ID CODE/NANE PWR-8 EB PWR-8 FOB PWR-8 PD7 PD PWR-8 PEICBB ADN/LFNB IE/DGAVT NRR PWR-A ADTS NRR TOALSTON> A NRR/TANB Q QIL Oi.,

COPIES LTTR ENCL i

3i TOTAL NUMBER OF COP IEB REQUIRED:

LTTR '3 ENCL

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 March 13, 1987 161-00074-JGH/BJA

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Docket Nos.

STN 50-528 (License No. NPF-41)

STN 50-529 (License No. NPF-51)

STN 50-530 PVNGS Schedule for Implementation of the ATWS Rule File: 87-A-056-026

References:

(1) 10 CFR 50.62 issued on June 26, 1984.

Subject:

Requirements for Reduction of Risk from Anticipated Transients Without Scram (ATWS) for Light-Water-Cooled Nuclear Power Plants.

(2)

Generic Letter 85-06 dated April 16, 1985.

Subject:

Quality As-surance Guidance for ATWS Equipment that is not Safety Related.

(3)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W.

Knighton, NRC, dated October 12, 1985 (ANPP-33712).

Subject:

Schedule for Com-pliance with 10 CFR 50.62.

(4)

Letter from E.

A. Licitra,

NRC, to E.

ED Van Brunt, Jr.,

ANPP, dated February 24, 1987.

Subject; Palo Verde 1,

2 8

3 Schedule for Implementation of the ATWS Rule.

(5)

Letter from A.

E.

Sherer, CE, to F.

J.

Miraglia, NRC, dated February 27, 1987 (LD-87-012).

Subject:

CESSAR Compliance with the ATWS Rule (10 CFR 50.62).

Dear Sirs:

The NRC issued 10 CFR 50.62 (Reference (1))

on June 26, l984.

This regulation promulgated certain design requirements for the reduction of risk from ATWS events and also required licensees to submit a

schedule for implementation of the ATWS requirements within 180 days after NRC issuance of Quality Assurance (QA) guidance for non-safety related ATWS components.

The NRC issued the QA guidance on April 16, 1985 (Reference (2))

and ANPP provided the required implementation schedule on October 12, 1985 (Reference (3)).

The schedule for PVNGS final implementation of the ATWS rule, as presented in Reference (3),

was as follows:

PVNGS Unit 1 =

Prior to startup following the second refueling outage from issuance of the license authorizing operation above 5'ower.

PVNGS Unit 2 =

Prior to startup following the second refueling outage from issuance of the license authorizing operation above 5X power.

PVNGS Unit 3 =

Prior to startup from the first refueling outage after issuance of the license authorizing operation above'X power.

E 870319001'1 870313 PDR ADOCK 05000528 P

PDR

U.S. Nuclear Regulatory Commission Document Control Desk 161-000 74 Page 2

Subsequent to ANPP proposing the above implementation

schedule, the NRC staff has informed ANPP by letter dated February 24, 1987 (Reference (4)) that the NRC has decided to extend the deadline for implementation of the ASS rule to no later than the third refueling outage after July 24, 1986.

In accordance with the revised NRC deadline, ANPP would like to revise the implementation schedule for the PVNGS units.

The revised implementation schedule for the PVNGS units is as follows:

PVNGS Units 1, 2 and 3 =

Prior to startup following the third refueling outage after July 24, 1984, for each PVNGS unit.

At this

time, design information related to PVNGS compliance with 10 CFR 50.62 is currently being reviewed by the NRC staff on the CESSAR Docket (Reference (5)).
Thus, the PVNGS implementation of the A1WS rule is awaiting completion of the NRC review of the CESSAR submittal.

ANPP will submit the specific information required by 10 CFR 50.62 paragraph (c)(6), after the NRC staff completes its review of the CESSAR submittal.

If you have any additional questions on this matter, please contact Mr. M. F. quinn of my staff.

Very truly yours,

). g playa~

J.

G. Haynes Vice President Nuclear Production JGH/BJA/rw CC:

0.

M.

E. E.

G.

W.

E.

A.

J.

B.

R.

P.

A. C.

De Michele Van Brunt, Jr.

Knighton Licitra Martin Zimmerman Gehr

U.S. Nuclear Regulatory Commission Document, Control Desk 161-000 /4 Page 3

bcc: J.

D. Driscoll R. H. Butler W. F. Quinn R.

A. Bernier A. C. Rogers L. G. Papworth J.

W. Rowland J. T. Barrow C. A. Lewis J.

R.

Bynum

0. J. Zeringue G.

W. Sowers J.

B. Hebison P. L. Brandjes J.

Donahue R. E. Younger R. J.

Adney R. E. Gouge C. Ferguson (CE)

S. Ritterbusch (CE)

LCTS Coordinator