1 t
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR'5 1 01 60049'OC
~ DATE'5/1 0/12 NOTARI'ZED4 NO DOCKET FACIL'.STN 50 528 Palo Yerde Nuclear Stations Uni,t ii Arizona Publi 05000S28 STN 50 529 Palo Verde Nuclear Stationg Unit 2i Arizona Publi 05000S29 STN 50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi OS000530 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE",E, Ar izona Nuclear Power Project (former ly Arizona Public Serv REC IP ~ NAME
" RECIP IDENT AFFILIATION KNIGHTONgGe Licensing, Branch 3
SUBJECTS Provides schedules for final implementation of ATNs rule requirementsiper Generic Ltr 85~06 'pecific info required by Paragraph, (C)(6) of rule will be'ubmitted when*
preliminary design completed 8, approved.,
DISTRIBUTION CODE:
A055O COPIES RECEIVED:I.TR g "ENCL SIZE; j
TITLE; OR/Licensing Submi t tel t Salem ATHS Events GL-83 28 NOTES:Standardized plant ~
OL ~ 12'/31/80 Standardized plant>
Standardized plant.
05000528 05000529 05000530 RECIPIENT IO CODE/NAME!
NRR LB3~ BC 01 INTERNAL: ACRS ELO/HOS3 IE/DQAVT NRR/DE/MEB NRR/DHFS/LQB NRR/Ol/DRAB NRR/DL/TAPMG NRR/OSII/ICSB NRR/OS I'/RSB RGiVS COPIES LTTR ENCL 6
1 1
1 1
1 2
1 1
RECIPIENT ID CODE/NAME'DM/LFMB IE/DI NRR/DE/EQB NRR/OHFS/HFEB NRR/DL OIR NRR/DL/SSPB NRR/OS I/ASB N
/PSB G FI 04 COPIES'TTR,ENCL' 1
1 1
1 1
1 1-EXTERNAl: 24 X NRCI'DR 0 24.
LPDR NSIC 03 0S TOTAL NUMBER" OF COPIES REQUIREDe LTTR 32'NCL
I I
a Ci' i
'I M
cs C-k 1,
h
Arizona Nuclear Povver Project P.o. BOX 52034
~
PHOENIX, ARI2ONA85072-2034 ANPP-33712 EEVB/KLM October 12, 1985 Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Docket Nos.
STN 50-528 (License No. NPR-41)/529/530 Schedule for Compliance with 10CFR50.62 File:
85-056-026'.1.01.10
References:
1) 10CFR50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants.
2)
NRC Generic Letter 85-06, dated April 16, 1985;
Subject:
Quality Assurance Guidance for ATWS Equipment that is not Safety-Related.
3)
Letter to E.
G. Tourigny, NRC, from R. C. L. Olson, GEOG, dated April 19, 1985;
Subject:
GEOG ATWS Program Schedule.
Dear Mr. Knighton:
Pursuant to References
- 1) and 2),
ANPP is providing its proposed schedule for meeting the requirements of paragraphs (C)(1) and (C)(2) of Reference 1).
As indicated in Reference 3),
ANPP is a participant in the Combustion Engineering Owners Group (GEOG) Program for compliance with the ATWS Rule.
The schedules for final implementation of the ATWS Rule requirements for PVNGS Units 1, 2 and 3 are as follows:
PVNGS Unit 1:
Prior to startup following the second refueling outage from issuance of OL authorizing operation above 5/o of full power.
PVNGS Unit 2:
Prior to startup following the second refueling outage from issuance of OL authorizing operation above 5X of full power.
PVNGS Unit 3:
Prior to startup from the first refueling outage after issuance of OL authorizing operation above 5X of full power.
This is due to the closeness of OL issuance and is consistent with PVNGS Unit 2 implementation.
85loi60049 8 OD0528 pDR ADOCK 050DpDR I (
'P
Mr. George W. Knighton Schedule for Compliance with 10CFR50.62 ANPP-33712 Page 2
The specific information required by paragraph (C)(6) of the rule will be submitted as soon as the preliminary design has been completed and approved by ANPP.
At this time it does not appear that ANPP will request an exemption from the req-uirements for the A'NS Rule.
This will be confirmed in our preliminary design submittal pursuant to paragraph (C)(6) of the rule.
If you should have any questions concerning this matter, contact Mr. N. F. quinn, of my staff.
Very truly yours, E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/KLM/ds cc:
E. A. Licitra R. P.
Zimmerman H. Denton M. Ley A. C. Gehr
4