ML17303A324
| ML17303A324 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/24/1987 |
| From: | Licitra E Office of Nuclear Reactor Regulation |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17303A325 | List: |
| References | |
| GL-83-28, NUDOCS 8702270395 | |
| Download: ML17303A324 (4) | |
Text
.Docket Nos.:
50-528, 50-529'nd 50-530 FEB 8 4 )987 Mr. E. E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
SUBJECT:
PALO VERDE RESPONSE TO GENERIC LETTER 83 ITEM 4.5.2 Your response to Generic Letter 83-28 was provided by letter dated November 3, 1983.
Item 4.5.2 of the generic letter requested information concerning on-line functional testing of the reactor trip system.
We have completed our review of your response to Item 4.5.2 and find the response to be acceptable.
The staff's safety evaluation of this matter is provided as Enclosure 1.
If you have any questions regarding this letter, please let me know.
Sincerely,
Enclosure:
Safety Evaluation of Item 4.5.2 cc:
See next page DI IBUTION E. A. Licitra, Project Manager PWR Project Directorate No.
7 Division of PWR Licensing-8 locetF>
e NRC PDR LPDR PD7 Reading JLee EALicitra MDavis EJordan vo~P EALici ra/yt 2/if/87 BGrimes
JCalvo AToalston D7
'ghton 2/
/87 g~()~~~0395 870ggy pPq ggocK 05000528
0
~
)
~
IN II 1
~
~
I )
Ii h
II
)r I,
il
~
) I I,
i' N
)
Ih It, E
J
'I II
~
h )'h i
~
r j)t/
I Nl
~
i Ii f h
h )
))Nif EI I hh h
Mr. E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Pal o Verde CC:
Arthur C. Gehr, Esq.
Sne)l 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, Cali for nia 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0. Box'39 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596
(
l r,
l