ML17299B108

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-46,changing Tech Specs Re Electrical Power Sys,Administrative Controls,Tables 3.3-13 & 4.3-8 & RCS Per Meeting During Wk of 860217 & Making Editorial Changes to Table 3.3-11
ML17299B108
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/13/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17299B109 List:
References
ANPP-35521-EEVB, TAC-60706, NUDOCS 8603250165
Download: ML17299B108 (6)


Text

REGULATOR NFORMATION DISTRIBUTION TEM <RIDS)

ACCESSION NBR: 8603250165 DOC. DATE: 86/03/13 NOTARIZED: NO DOCKET 0 FACIL: STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION VAN BRUNT> E. E. Arizona Nuclear Power .Prospect (formerlg AT izona Public Serv RECIP. NAME RECIPIENT AFFILIATION KNIGHTON> Q. W. PWR ProJect Directorate 7

SUBJECT:

Application for amend to License NPF-46> changing Tech Specs re electrical power sos> administrative controlsi Tables

3. 3-13 8r 4. 3-8 Zc RCS per meeting during wk of 860217 5 making editorial changes, to Table 3. 3-11.

't DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES: Standardized plant. 0500052s RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PWR-B ADTS 1 0 PWR-B EB 1 PWR-B PEICSB 2 2 PWR-B FOB 1 PWR-B PD7 PD 01 5 5 LICITRAiE 1 1 PWR-B PEICSB 1 1 P.WR-B RSB 1 INTERNAL: ACRS 09 6 6 ADM/LFMB 1 0 ELD/HDS3 0 NRR/DHFT/TSCB 1 1 NRR/ORAS 0 04 1 1 RQN5 1 EXTERNAL: 24X 1 1 EQhQ BRUSKEi S 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC a5 1 1 TOTAL NUMBER OF COPIES REQUIRED LTTR 30 ENCL 26

~ >>

,,I

,[ '$

~ fl g > I A

I l >>>> 4'i '<<'IU[J'>. I

'-f'f.'3 Xl M => 4>>

>>',>>>>>>fl >> IC( 'P>>l

- -f[8 r'. >> lf f~ >> I'

~ l>> g>>J [+I l>>f .

4 l ~ I

"~9 f d>>' >>~ I 't>>, 4;  ! >>>>i.,<;,I;>>.',

' ~ g>>

,I Jl! g ' ~ I I I

," f'I:. ~ 3 ',l')

~I W

4 C>>

<<1'! r-! o ~

~ ' >>wfg,,'ll ! Iff l jj I>>

[g 4"

>>M '>>V<<M>>>>I AI I '>> 'I)AJ JJ ~>AC'>>'>I l'w 4 Af 'I cw

) 'l rf>>( ll )I I, h 7[, lf l,,14

<<."I:3. P,:) K '4 f.! 2 l',';,~!.I 9t "'"-

I c >> I 't.'-" ll k, 33~i 9 '<<T t 3 "['III," I jQ.','iI 8 Q ff>t f If ((g [>> [ '.[ *) .!

w ll [4 r l>I

'll, I '

[4 >>' ~ <<w H'"

'C.l8')>>"

')'gX l) H>> <.lH'44GJ fy 0 'l I'i 8>>l"'"!

ff

'off']&

Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 March 13, 1986 ANPP-35521 EEVB/JRP/98.05 d

Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Project Director PWR Project Directorate k7 Division of Pressurized Water Reactor Licensing B UPS. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

Change to Technical Specifications for Full Power License File: 86-056-026

Reference:

ANPP Letter dated February 13, 1986, from E. E. Van Brunt, Jr., ANPP, to G; W. Knighton, NRC.

Dear Mr. Knighton:

The referenced letter transmitted changes to the low power license Technical Speci-fications for PVNGS Unit 2~ Subsequent to this transmittal, meetings were held the week of February 17, 1986, with members of your staff and representatives of ANPP. As a result of these meetings, additional information and/or clarification was requested by the staff in order to evaluate several of the proposed changes.

Attached please find the clarification as requested along with changes riot pre-viously submitted in the referenced letter but discussed with the staff during the meetings (Attachment 1), and additional editorial chan'ges to Table 3.3-11 (Attachment 2).

If you have any questions, please call.

Very truly up ,

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/JRP/rw Attachments cc: Director, Region V USNRC NRC Project Manager E. A. Licitra NRC Resident Inspector R. P. Zimmerman 8603250f65 8603i3 PDR ADOCK 05000529 P, PDR

)

NO SIGNIFICANT HAZARDS DOCUMENTATION Unit 2 Technical S ecification 3/4.8.1 The proposed amendment request does not involve a Significant Hazards Consideration because:

(A) The operation of PVNGS Unit 2 in accordance with this change would not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
2) Create the possibility of a new or different kind of accident from any accident previously analyzed; or
3) Involve a significant reduction in a margin of safety; and (B) It is not desirable to shutdown a diesel generator which is running and providing power to a vital bus in order to perform a test.

This change assures that this will not happen by making the condition explicit.

This change was discussed with Messrs. Jose Calvo and Hukam Garg in your offices on February 21, 1986 and found to be acceptable.

t 4'l