ML17299A490
| ML17299A490 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/12/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-33194-EEVB, TAC-60706, NUDOCS 8508160012 | |
| Download: ML17299A490 (4) | |
Text
REGULAT
'FORMATION DISTRIBUTIO
'EM (RIDS)
.ACCESSI'ON NBR: 8508160012 DOC ~ DATE: 85/08/12 NOTARIZED:,NO FACIL:STN-50-528 Palo Verde Nuclear Station~
Unit li Ar izona Publi STN-50-529 Palo Verde Nuclear Stationi Unit 2~ Arizona Publi STN 50-530 Palo Verde Nuclear Stationi Unit 3~ Arizona Publi AUTH'AME AUTHOR AFFILIATION VAN BRUNTiE,E, Arizona Public Service Co ~
RECIP ~ NAME, RECIPIENT AFFILIATION KNIGHTONg G ~ N ~
Licensing Branch 3
SUBJECT:
Informs that development of plant protection sys setpoint methodology used in Unit 1
Tech Specs transmitted by 8ff0802 ltr also applicable to Units 2
8 3.
DISTRIBUTIoN CODE:
B021D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR/Licensing Submittal; Combined General Distribution NOTES;Standardized plant ~
OL: 12/31/8ff Standardized
- plant, Standardized plant.
DOCKET 05000528 05000529 05000530 05000528 050005?9 05000530 RECIPIENT ID CODE/NAME NRR LB3 BC 05 LICITRApE 01 INTERNAL: ACRS 29 ELD/HDS3 NRR/DE/NTEB NRR/DHFS/LQB NRR/DL/ORAB NRR/DSI/ADRS NRR/DSI/CPB 11 NRR/DSI/ICSB 18 N
SB 21 REG Off RM/DDAMI /l'1IB COPIES LTTR ENC 1
1
'1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR LB3 LA ADM/LFMB NRR/DE/CEB 09 NRR/DHFS/HFEB16 NRR/DL DIR NRR/DL/SSPB NRR/DSI/AEB 28 NRR/DS I/CSB 10 NRR/DSI/METB 13 NRR/DS I/RSB 25 RGN5 COPIES LTTR ENCL EXTERNAL: 2ffX NRC PDR PNL'RUELiR 02 LPDR NSIC 03 06 1
1 1
TOTAL NUMBER OF COPIES REUUIRED:
LTTR 36 ENCL
'0 7
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX. ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 August 12, 1985 ANPP-33194-EEVB/JRP
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Plant. Protection System Setpoint Me'thodology Docket Nos.
STN 50-528(NPF-41),
529/530 File:
85-056-026 " G.1.01.10
Reference:
ANPP letter dated 8/2/84 from E. E.
Van Brunt, Jr., to G.
W. Knighton
Dear Mr. Knighton:
The referenced letter transmitted the development of the Setpoint Methodology used in the PVNGS Technical Specifications.
This letter is to inform you that this material is also applicable for Units 2 and 3 and may be used in your review for approval of the Technical Specifications for Unit 2 presently under consideration and Unit 3 when submitted.
If you have any questions, please call Mr. S.
R. Frost of my staff
't (602) 943-7200, ext. 4183.
Very truly your EEVB/JRP/mb E. E.
Van Brunt, Jr.
Executive Vice President Project Director cc:
Director Region V, USNRC NRC Project Manager E. A. Licitra NRC Resident Inspector R. P.
Zimmerman 8508g6{)012 '0'50 0528 850812 PDg ADO'~'DR, P
$6
'll
~
w Qi
'L
'L R
II