ML17299B085

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/86-02 & 50-529/86-02 on 851227-860202 & Notice of Violation
ML17299B085
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/21/1986
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17299B086 List:
References
NUDOCS 8603130010
Download: ML17299B085 (4)


See also: IR 05000528/1986002

Text

860313OOio 860221

PDR

ADOCK OSOOO528

9

PDR

Docket Nos. 50-528,

50-529

Arizona Nuclear Power Project

P. 0.

Box 52034

Phoenix, Arizona

85072-2034

Attention:

Mr. E.

E.

Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units

1 and 2.

This refers to the inspection conducted

by Messrs.

R. Zimmerman,

C. Bosted

and

G.

Fiorelli, of this office on December

27,

1985, through

February

2,

1986 of activities authorized

by NRC License

No. NPF-41

and NPF-46 and to the discussion of our findings held with yourself and

other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

vt

I

A

I

I

'

t

ev

I

I

~

~

lf

ll r

lWLW

I

II

I,WW

L

I

I

V

W

, V

Arizona Public Service

Co.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the en-

closure will be placed in the

NRC Public Document

Room.

The response

directed by this letter and the accompanying

Notice are not

subject to the clearance

procedure of the Office of Management

and Budget

as required by the Paperwork Reduction Act of 1980,

PL 96-511.

Should you have any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

Sincerely,

A. E.

Ch

fee, Chief

Reactor Projects

Branch

Enclosures:

A. Appendix A Notice of Violation

B. Inspection Report Nos.

50-528/86-02

50-529/86-02

cc w/enclosures:

J.

R. Bynum,

PVNGS Plant Manager

S.

R. Frost, Supervisor,

Nuclear Operations Licensing, Sta.

40804

T.

D. Shriver, Manager, Quality Systems

& Engineering

W.

E. Ide, Manager,

Corporate

QA/QC

C.

N. Russo,

Manager,

QA Audits/Monitoring

Ms. J. Morrison

Ms. L. Bernabei,

GAP

Arthur C. Gehr,

Esq.

D. Railsback,

Arizona Corporation Commission

bcc w/enclosures:

RSB/Document Control Desk

(RIDS)

J. Martin,

RV

B. Faulkenberry,

RV

G. Cook,

RV

Resident

Inspector

Project Inspector

bcc w/o enclosure

B:

LFMB

ZI

I

V

2

(/86

BOSTED

2/Z t/86

FIORELL

2/Z(/66

cu

MILLER

BOSCH.

2/+/86

2/2

I /86

1

I(

Ni

'\\