ML17299A905

From kanterella
Jump to navigation Jump to search

Informs That Demonstration of Heat Removal Capability of Essential Cooling Water Sys Will Be Performed During First Cycle of Operation Prior to First Refueling Outage Instead of During Power Ascension Testing
ML17299A905
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/30/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-34350-EEVB, TAC-60904, NUDOCS 8601060023
Download: ML17299A905 (6)


Text

r'~

RECULATOSY INFORN*TION DIBTRIBUTIOI4YSTEN (RIDE)

ACCESSION NBR: 86010b0023 DOC. DATE: 85/12/30 NOTARIZED: NO DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station.

Unit 1 ~.Arizona Publi 05000528'UTH.

MANE AUTHOR AFFILIATION VAN BRUNT> E. E.

Arizona Nuclear Power Prospect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation.

Director (post 851125 KNIQHTQN, Q. M.

PWR Prospect Directorate 7

SUBJECT:

Informs that demonstration of heat removal capability of essential cooling water sos will be performed during first cycle of operation prior to first refueling outage instead of during power ascension testing.

DISTRIBUTION CODE:

AOCID COPIEB RECEIVED: LTR Q ENCL O SIZE:

TITLE:

OR Submittal:

General Distribution NOTES: Standardi zed plant.

OL: 12/31/84 05000528 REC IP IENT ID CODE/NANE PNR-B PD7 PD 01 INTERNAL: ACRS 09 ELD/HDS3 NRR PNR-A EB NRR/DHFT/TSCB NR

/RRAB RE FIL 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAME LEYTE N ADN/LFNB NRR BNR EB NRR PNR-B EB NRR/DSRO DIR NRR/ORAS RGN5 COP IEB LTTR ENCL EXTERNAL: 24X LPDR NSIC 03 05 EQ8cQ BRUSKEz S NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ENCL 5

sk(

5

~ >>.A V

4 5si s

.s k, I,

~

sfs<<QI f,<<

55 4

g III H

  • 5<<>

(

<

4 f '

5,4 "$ ~llf('5 "K

'J

<<(5

'5~. >u<5 H>>

"( J<>

5 l <<'CHA f(5,>>, f

>>sf H>><<ffP f 5 J K I ls

<<J>>1>>

<<54) li~ll f5 57 f, f a:5 6,

5 i.'llf -5'< 0l

-f'I 444K, "45""4'll lI fTJ

>>'%54'5l

) ( Hi>>)

g>>f

<<4 fI Qf ',7 I Hill, 5 55 4>>

<<>>w4

<<4>>

', <<>f>>

<<5

~ 55<<f 4

lfH",f l)fJ

~ Of"HS 'f '..,

4" V>>> ',ff 5

5

'5."4 0 "J '<<ilf 5

'f<<5'i C>>5 5)

<<6 5'lf >>

V" ">'(V'>'>

5" P(5 5,

5I<<Q.'fsfF >(/fan ls~C<<k 5

. 'Hsk'fh>> f6 isffi i~",.'4

'5' 35$ '."~

(I ll I

5(ss 0 -<<k rf f>;> K.:.ll >>;-<<5<<ft

<< '"5.

5,."

5K'f'i

'K ~<<(g Jsl'Jll

'H 5<<

<<f)<<f 5 )>>Hi<<=I

)

VI,) "

'5: f y'>

5

'.f,,ll

'fLK(

J.

)J 5

'I

<<5<<f '5

$ P<<0 55(<<

<<sf<<

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 December 30, 1985 ANPP-34350-EEVB/BJA-98.07 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate ¹7 Division of Pressurized Water Reactor Licensing B U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No.

STN 50-528 (License No. NPF-41)

Demonstration Testing for the Essential Cooling Water System at PVNGS Unit 1 File: 85-056-026

References:

(1) Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated November 20, 1985 (ANPP-34062).

Subject:

PVNGS Unit 1 Power Ascension Testing (2) Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated May 24, 1985 (ANPP-32729).

Subject:

Spray Pond Monitoring Program

Dear Mr. Knighton:

QlK Ou)Q,

,p) OO-

'gO mO I(TIi>

mO QM-OG OR 4l4(:

O O'QQ,

',Q L;L The deferral of this demonstration until after the power ascension testing phase does not significantly decrease the level of safety at PVNGS Unit 1.

The ECWS has been successfully tested in the preoperational testing program and during the test-ing to meet the surveillance requirements of Technical Specification 3.7.3.

Additionally, the ECWS has operated successfully during shutdown periods of the PVNGS Unit 1 Startup testing program.

Thus, the testing and operation of the ECWS to date is sufficient to ensure that the system is capable of performing its safety CRUTCHPIELD (Ltr DES) fEB (If. JOBIISTGR)

~ RSB (TBORAS)

>>EICSB (PARR)

PGB (N>>

REGAN)

IPO/

/Io Reference (2) submitted a

procedure for the conduct of a

spray pond monitoring program at PVNGS.

Contained within this procedure is a demonstration of the heat removal capability of the essential cooling water system (ECWS) in conjunction with the operation of the essential spray pond system.

Step 5.6 of this procedure states that the demonstration of the heat removal capability of the ECWS is schedul-ed to be performed during power ascension testing.

Contrary to this expected

schedule, the required plant initial conditions for the performance of this demon-stration will not be obtained during the PVNGS Unit 1 power ascension testing phase.

The proper plant initial conditions will be obtained during the first cycle of operation for PVNGS Unit 1 and the demonstration will be conducted during the first cycle of operation prior to shutdown for the first refueling outage.

~ y J

t I(

~,

~

Mr. George M. Knighton-Demonstration Testing for the Essential'ooling Mater System at PVNGS Unit 1

ANPP-34350 Page 2

If you have any additional questions on this matter, please contact Mr. W. F. Quinn of my staff.

Very truly your 9 -~.JQ~

ning E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/BJA/rw cc:

E. A. Licitra R. P.

Zimmerman A. C. Gehr