ML17299A311
| ML17299A311 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/13/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17299A312 | List: |
| References | |
| NUDOCS 8506050129 | |
| Download: ML17299A311 (3) | |
See also: IR 05000303/2004027
Text
8506050129
850513
ADOCK 05000528
6
Docket Nos.
50-528
50-529
50-530
HAY g3 Jggg
Arizona Nuclear Power Project
Post Office Box 52034
Phoenix,
Arizona 85072-2034
Attention:
Mr. E. E.
Van Brunt, Jr.
Executive Vice President
Gentlemen:
Subject:
NRC Inspection of Palo Verde Unit Nos.
1, 2,
and
3
This refers to the routine construction inspection
conducted
by Messrs.
G. H. Hernandez
and J.
R. Ball of this office during the period of March
3 - April 27,
1985, of activities authorized by NRC License
Number NPF-34
and Construction Permit Numbers
and 143,
and to the discussions
of their findings held with members of your staff during and at the
conclusion of this inspection.
Areas
examined during this inspection are described in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted in full compliance with NRC requirements,
as
set forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10
CFR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10
CFR 2.790(a),
a copy of this letter and the
enclosure will be placed in the
NRC Public Document
Room.
d
NAY 18
)98'he
response
directed by this letter and the accompanying Notice are not
subject to the clearance
procedure of the Office of Management
and Budget
as required by the Paperwork Reduction Act of 1980,
PL 96-511.
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Projects
>Iaaf signer[ py
D. F. Kirsch
D. F. Kirsch, Acting Director,
Division of Reactor Safety
and
Enclosures:
A. Appendix A - Notice of Violation
B. Inspection Report Numbers:
50-528/85-16
50-529/85"10
50"530/85-07
cc:
w/enclosure
J.
R.
Bynum,
S. R. Frost,
T. D. Shriver,
W. E. Ide,
C. N. Russo,
J. Morrison
L. Bernabei,
GAP
A. C. Gehr,
Esq. Snell 8 Wilmer
bcc:
RSB/Document Control Desk
(RIDS)
Mr. Martin
Resident Inspector
LFMB
pink/green/docket file copies
RV
ANDEZ/dot
5/5 /85
ALL
ILLER
5/ Q/85
5/ g/85
KIRSCH
5/g/85
(p ail~.
"'~
C(iS!$ ~