Notice of Violation from Insp on 850303-0427
ML17299A313
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/13/1985
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17299A312 List:
References
50-528-85-16, 50-529-85-10, NUDOCS 8506050140
Download: ML17299A313 (2)


See also: IR 05000303/2004027

Text

8506050i40 8505ia

PDR

ADOCK 05000M8

I

APPENDIX A

NOTICE OF VIOLATION

Arizona Nuclear Power Project

Post Office Box 52034

Phoenix, Arizona, 85072-2034

Docket Nos. 50-528 and 50-529

NRC License

No. NPF-34 and

Construction Permit No.

142

As

a result of the inspection

conducted

on March 3 - April 27,

1985,

and

in accordance

with NRC Enforcement Policy,

10 CFR Part 2, Appendix C, the

following violation was identified:

10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures,

and

Drawings" states,

in part, that "Activities affecting quality shall be

prescribed

by documented instructions,

procedures,

or drawings of a type

appropriate

to the circumstances

and shall be accomplished in accordance

with these instructions,

procedures,

or drawings."

Bechtel Mork Plan Procedure/equality

Control Instruction 251.0

"Raceway

Installation" Appendix I, Revision 18, Section B-5, Item 3 requires

verification that, "...the proper type and size of pull boxes,

man holes,

hand holes,

terminal boxes,

and/or receptacles

have been installed per

applicable drawings."

Section B-5, Item 16 further requires verification

that, "...cable in electrical

man holes is properly supported

and

racked."

Contrary to the above,

man holes

lEZV06AKEM02, 1EZV06AKEM03,

1EZV06AKEM04, lEZV06BKEMOl, lEZV06BKEM02, and

lEZV06BKEM04 (including

their contents)

were not verified in accordance

with the above procedures

and were not on the licensee's

schedule for future inspection by their

(}uality Control organization.

Similarly, pull boxes installed with conduits

2EZCAEBRCOl and

2EZJ3ACRX07

were not verified as required.

This is a Severity Ievel IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service

Company, is hereby required to submit to this office within thirty days

of the date of this Notice,

a written statement of explanation in reply,

including: (1) the corrective steps

which have been taken

and the results

achieved:

(2) corrective steps

which will be taken to avoid further items

of noncompliance;

and (3) the date

when full compliance will be achieved.

Consideration

may be given to extending you

shown.

MAY 13 1996

response

time for good cause

Dated

F. Mille

r., Chief

Reactor Projects

Section No.