I
APPENDIX A
Arizona Nuclear Power Project
Post Office Box 52034
Phoenix, Arizona, 85072-2034
Docket Nos. 50-528 and 50-529
NRC License
No. NPF-34 and
Construction Permit No.
142
As
a result of the inspection
conducted
on March 3 - April 27,
1985,
and
in accordance
with NRC Enforcement Policy,
10 CFR Part 2, Appendix C, the
following violation was identified:
10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures,
and
Drawings" states,
in part, that "Activities affecting quality shall be
prescribed
by documented instructions,
procedures,
or drawings of a type
appropriate
to the circumstances
and shall be accomplished in accordance
with these instructions,
procedures,
or drawings."
Bechtel Mork Plan Procedure/equality
Control Instruction 251.0
"Raceway
Installation" Appendix I, Revision 18, Section B-5, Item 3 requires
verification that, "...the proper type and size of pull boxes,
man holes,
hand holes,
terminal boxes,
and/or receptacles
have been installed per
applicable drawings."
Section B-5, Item 16 further requires verification
that, "...cable in electrical
man holes is properly supported
and
racked."
Contrary to the above,
man holes
lEZV06AKEM02, 1EZV06AKEM03,
1EZV06AKEM04, lEZV06BKEMOl, lEZV06BKEM02, and
lEZV06BKEM04 (including
their contents)
were not verified in accordance
with the above procedures
and were not on the licensee's
schedule for future inspection by their
(}uality Control organization.
Similarly, pull boxes installed with conduits
2EZCAEBRCOl and
2EZJ3ACRX07
were not verified as required.
This is a Severity Ievel IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service
Company, is hereby required to submit to this office within thirty days
of the date of this Notice,
a written statement of explanation in reply,
including: (1) the corrective steps
which have been taken
and the results
achieved:
(2) corrective steps
which will be taken to avoid further items
of noncompliance;
and (3) the date
when full compliance will be achieved.
Consideration
may be given to extending you
shown.
MAY 13 1996
response
time for good cause
Dated
F. Mille
r., Chief
Reactor Projects
Section No.