ML17298B509
| ML17298B509 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/25/1984 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17298B510 | List: |
| References | |
| NUDOCS 8411160410 | |
| Download: ML17298B509 (4) | |
See also: IR 05000528/1984033
Text
I
).V ~
1
~
~
,OP hr lS84
Docket Nos. 50-528
50-529
~ Hq ggg COP~
Arizona Public Service
Company
P.
O.
Box 21666
Phoenix,
Arizona 85036
Attention:
Mr. E. E, Van Brunt Jr.,
Vice President - Nuclear Operations
Gentlemen:
Subject:
NRC Inspection of Palo Verde Units
1 and
2
This refers to the inspection
conducted
by Messrs.
R.
Zimmerman,
G. Fiorelli,
and
C. Bosted of this office on August
13 - September
8,
1984 of activities
authorized
by NRC Construction Permit Nos.
CPPR
141 and
142 and to the
discussions
of our findings held by" Mr. Zimmerman with you and members of
your staff periodically during the inspection.
Areas
examined during this inspection are described in the enclosed
inspection report.
Within these
areas',
the inspection consisted
of selective
examinations of procedures
and representative
r'ecords,
interviews with
personnel,
and observations
by the inspector.
Based
on the results, of this inspection, it appears
that one of your
activities
was not conducted in full compliance with NRC requirements,
as set
forth in the Notice'of Violation, enclosed
herewith as Appendix A.
This
violation, dealing with insufficient controls to assure
a proper equipment
lineup prior to component, operation, is similar to two previous instances
documented in NRC Inspection Report 50-528/84-28,
and highlighted as
a
concern in my letter to you dated
September
14,
1984 which transmitted
the
inspection report.
We requested
in the referenced letter that you provide us
with the actions
you plan to take to improve your controls in assuring proper
equipment lineups
and statusing.
We understand
that you intend to include in
your response
to that request
the specific corrective action for the enclosed
violation.
Therefore,
unless desired,
'no response
to the enclosed violation
is required.
tI
410 agi02
8
84iiibOCK 050005DR
il
PDg
,
P
Q
v
4'4
Arizona Public Service
Company
g C7 a5'~ng~
Should you have any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
5 jgo<
T.
W. Bishop, Director
Division of Resident,
Reactor
Projects
and Engineering
Programs
Enclosure:
Inspection Report
Nos. 50-528/84-33
50-529/84-26
cc w/enclosure:
J.
Bynum, Director, Nuclear Operations
S.
R. Frost,
Supervisor
Nuclear Operations
Licensing, Station 4080
T. D. Shriver,
Manager,
equality Systems
6 Engineering
W. E. Ide, Manager,
Corporate
(}A/(}C
C. N. Russo,
Manager,
(}A Audits
Ms. Jill Morrison
Lynne Bernabei,
GAP
bcc:
Document Control Room (RIDS)
Distributed by RV:
Project Inspector
(w/enclosure)
Resident Inspector
(2 copies w/enclosure)
Arthur C. Gehr,
Esq (w/enclosure)
L. Miller (w/enclosure)
File Copy (w/enclosure)
Pink/Green
(w/o enclosure)
P, gohnvan,
P Vcu/<nc/g
RV/jk
MILLER
10/() /84
BISHOP I
10/A+84
AM,
IoliP 1'f4
0
L