ML17297B074
| ML17297B074 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/19/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17297B075 | List: |
| References | |
| NUDOCS 8112080351 | |
| Download: ML17297B074 (4) | |
See also: IR 05000528/1981012
Text
NOV L9 198$
Docket Nos. 50-528/529/530
Arizona Public Service
Company
P. 0.
Box 21666
Phoenix, Arizona
85036
~gq yQiE C~~
Attention:
Mr. E. E.
Van Brunt, Jr., Vice President
Nuclear Projects
Management
Gentlemen:
Subject:
This refers to the fnspectfon conducted
by Messrs.
J.
H. Eckhardt,
W. J.
Wagner,
and T.
W. Bishop of this office on August 17-21,
1981 of activities
authorized
by NRC Construction Permit Nos.
CPPR-141,
142,
and
143 and to
the discussion of our ffndfngs held with you and members of your staff
at the conclusion of the inspection.
Areas
examined during this inspection
are described
fn the enclosed
inspection
report.
Within these areas,
the inspection consisted of selective examinations
of procedures
and r epresentatfve
records,
interviews wfth personnel,
and
observations
by the inspector.
Based
on the results of this inspection, it appears that certain of your
activitfes were not conducted in full compliance with NRC requirements,
as set forth fn the Notice of Violation, enclosed
herewtih
as Appendix A.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room unless
you notify this office,
by telephone, within ten days of the date of thfs letter and submit written
application to withhold information contained therefn within thfrty days
of the date of thfs letter.
Such application must be consistent wfth the
requirements of 2.790(b)(1).
t
h
OFFICE/
SURNAME/
DATEP
RV/d
ECKHARD
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ OJ
~ ~ ~ ~ ~
11/N'81
WAGNER
11/P'81
,'i<Z080SSS Siiiiq )
ADQCK 05000528)
BISH
11/ie/81
AULKEN
R
Y
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~
~ ~ ~ ~ ~ ~ ~ \\
~
~ ~ ~ ~ ~ ~ ~ ~
ll/($'81
iso i
NRC FORM 318110/80) NRCM 0240
~ ~ ~ ~ ~
~
~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0
~ ~ ~ ~ ~ ~
~ 0
OFFICIA
CORD COPY
6 USGPO'98~29 824
I
I
0
P
e
"
~
,J
II
e=
a
~
C
Contrary to the above, it was noted
on August 19,
1981, that
a
Unit 2 containment structural steel platform at elevation
149
ft. included three bolted joints with oversized slots not covered
with a plate washer or continuous
bar.
Inspection documentation
indicated that the platform had been inspected
by gC in April,
1981
and was considered satisfactory.
This is
a Severity Level
V Violation .(Supplement II) and is applicable
to Docket
No. 50-528.
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Seervice
Company
is hereby required to submit to this office within thirty days of the date
of this Notice,
a written statement
or explanation in reply, including:
(1) the corrective steps
which have been taken
and the results
achieved;
(2) corrective steps
which will be taken to avoid further items of noncompliance;
and (3) the date
when full compliance will be achieved,
Consideration
may be given to extending your response
time for good cause
shown.
The responses
directed
by this Notice are not subject to the clearance
procedures of the Office of Management
and
Budget
as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
NOV 1S
]SS>
Dated
.
Ec
h rdt, Reactor
n pector
Reactor Construction Projects Section
1
tI
I
~ I
r
ft
h'ttJ
~ I
I
I
4 'P
I
i*
~
A
a
C
~
I
- 4 I
,,y
C
~,
r
~
,I AP
t~'.
~ grAIk
-., ~
I
I<
ft
A
A
I'N'
I
H
~ k
1
ll
t
I
ftkht*
4
~
>I,
I
NPH
.
4't
h
~
h
'h I
I -'I
- ~
I
'I