ML17296A984
| ML17296A984 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/09/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17296A981 | List: |
| References | |
| NUDOCS 8009190183 | |
| Download: ML17296A984 (6) | |
Text
Docket No. 50-520 Arizona Public Service Company P.O.
Box 21666 Phoenix, Arizona 85036 Attention:
Nr. E.
E.
Van Brunt, Jr.,
Vice President, Construction Projects and ANPP Director Gentlemen:
This refera to the telephone conversations between Messrs.
- Dodds, Vorderbrueggen and Haist of this office with you on Hay 8, 1979, and with Hr. Hand of your staff and Bechtel project personnel on flay 9, 1979, regarding severe misfit, and distortion problems associated with the installation of the Unit 1 containment dome liner segments and the curren field procedures to make force fit-ups.
As you know, these problems were discussed on tray +, 1979 during our construction inspec-tion at the Palo Verde plant site.
In this regard, it, is our understanding that you are taking the following actions:
0 ltork has been susPended on dom segments of Unit 1 until it has been determined that appropriate remedial measures can be implemented to prevent, high residual stresses from being induced in the finished welds on th.. liner plate, and these remedial measures haVe been-reviewed with Region V.
2.
For Unit 2, it is understood that no erection or welding of 30 degree segments will be completed on the containment dome until the prob-lem has been resolved and reviewed with Region V.
3.
Structural specialists from the Bechtel Los Angeles office are examining the situation at th work location and will identity the activities necessary to resolve the existing conditions, and the procedural measures needed to prevent reoccurrence of a similar condition on Units 2 and 3.
SURNAMt&
MATC&
RV~~
LEVorde'rbrue 5/ gL79 gen: rm
,RTDodd Sgg'/ 79 GgSpencer R Engelken 5/.'f./? 9 5/g /79 800 s x 90yi3'-"
0
E.
E.
Van Brunt, Jr.
- BM-4.
Arrangements ar being made for a meeting in the NRC Region Y
office in Walnut Creek on Friday, May ll, 1979 between Arizona Public Service and Bechtel Personnel, and cognizant members of my staff, to discuss this matter and the corrective measures which you are developing.
If our understanding as described above is incorrect, plaase contact this office promptly.
Sincerely, R.
H. Engelken Director Copy sent to Thomas Brockett - Hay 15, 1979 C. Polusny II II II H.
P.
El 1 i s II II II RV made Distribution to RV PDR
i 0
~ ~
~ w HC 2955 APPZIG)IZ C RHGIOif Y
ACTT(>',f Il.ar 7scllity-E<i::~l;iled Eaforcemeat Action Appraisal Date -
5/3p(8p None needed at present Z.
Iasoect on Pr<~grwa Chaages (iaclade inr~e.:ried or decreased Ereauea~c)
Increased inspection in the areas of containment dome liner installation, pipe hangers and supports, and equipment storage and maintenance.
Decreased inspection in the areas of foundations, and concrete activities.
flanseemeat
.'feet3.n:.
I'l.:~na."d None planned except for annual SALP meeting.
An attempt will be made to hold the annual meeting in conjunction with the annual equality Assurance inspection exit meeting.
Regxoaol Director