Discusses Semiannual Regional Evaluation of Facilities for May 1979 Through May 1980.Licensee Performance Is Generally Satisfactory & Strong Licensee Effort Should Be Made to Ensure Current & Future Work Is Adequately Controlled
ML17296A983
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/20/1980
From: Dodds R, Eckhardt J, Vorderbrueggen
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17296A981 List:
References
NUDOCS 8009190178
Download: ML17296A983 (16)


Text

~P,S BE00('Ip0 lII/

+**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CAI.IFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 E~ C.L05 uRE B

MEMORANDUM FOR:

G.

S. Spencer, Chief, Reactor Construction and Engineering Support Branch FROM:

SUBJECT'egional Evaluation Review Board - Palo Verde SEMI-ANNUAL REGIONAL EVALUATION OF PALO VERDE UNITS 1, 2 AND 3 Previous enforcement actions and results (including escalated enforcement actions).

b.

Licensee's responsiveness and ability to execute corrective actions identified by the NRC and licensee management systems.

c.

Licensee actions in the area of IE Bulletins, licensee event (Part 21 and 50.55(e)) reports.

It is the opinion of the Board, based on the results of the review, that the licensee's performance is generally satisfactory and that strong effort by the licensee should continue to ensure that current and future work is adequately controlled.

In addition, it is the opinion of the Board that NRC:RV inspection efforts should be increased in the areas of containment dome liner installation, piping hangers and supports, and component storage and maintenance.

Rationale for these actions is provided in the enclosed Palo Verde Evaluation Form.

The Regional Evaluation Review Board for Palo Verde met on May 30,

1980, to perform the evaluation of project activities for the period of May 1979 I

through May 1980.

The board reviewed the following areas:

a ~

1

~ CM No&

S

G. S. Spencer Licensee actions related to IE Bulletins and licensee event reports were generally satisfactory.

No specific change in licensee programs or NRC inspections in these areas is recommended at this time.

Regional Review Board Members:

R. T.

Do ds, Chief, Engineering Support Section J

Ec ar t, eactor Inspector

Enclosure:

Palo Verde Evaluation Form for Appraisal Period 5/79-5/80

MC 2955 5/ll/79 Meeting held in Region Y office concerning Unit 1

dome liner plate.

F.

Justification of Evaluations of Functional Areas Cate orized as Re uirin an Increase sn Ins ection Fre uenc /Sco e

See eva uatson sheet Containment Dome Liner Installation - Units 2

8 3

On Unit 1, severe misfit of dome segments led to Region Y concern, and development of additional procedures and construction tolerances to prevent building in high residual stresses in the liner plate.

Pi in Han ers and Su orts To date there have been occasions where weld sizes have not been in compliance with requirements.

In addition, 50.55(e) reports have identified problems with support design and welding.

This is not just a Palo Yerde problem, but appears to be industry wide and needs additional inspection effort.

Com onent Stora e After llarehouse Release Problems have been encountered with leaving pipe openings uncovered, installed equipment improperly covered, pipe spools and weld electrodic carelessly handled/controlled.

o

Inspection Frcauencv and/nr Scone Incr"ase Ifo. Chsnge Dccrczse l.

gull I 1;~

.KS u 'lien, lESQS "SU&st rm Trainin 2 ~

sue>sc.ructur6 6 l'llnnds tions X

A.

(:llncret e 4.

Liner (Contllinmcnt 6 Othl'.is)

OSZQD'ee'.lllL"rJ htrnetn 1

~

L 3.pxn 'e Q'lngcrs (.'(esctur f'oolsnt Others) 7.

Ssf @tv-Rc l.~ted Componc:nt s (Vessel, J.nte'rn:its

& P7AC) i<(Dome Liner) g /Hangers an Supports X

8.

E'lc v(.ricsl Equal.~><<cnt, Elcctricsl (Ttvy G Mire)

Tns trumentst l till 1't.

Eire Protecl.ion

\\

12.

Prestlrvicc Lnspectxon L3.

Rc-.pa rting 14.

Storage/housekeeping f e

~

~

'e))

e ~

S

/ J 88M>~

~~5 grg/rC'r..&N/g//C~l-

/iMiM Zzr car xc wwwu

~Z77ZZ WArS.. 8 zldid<Y~r+g~ArJd~=

a))>/~i ZM Vga/7~r..

Z~/=>S, Pg 0/

~/~P~,~/0/wZPf

~O>~g spy/gn 7'7=d 7<7, 8= i//MZ&i

~~~n z zg/+0.z/@8

o

=-jzsj~a

~6l './.0(

i

- ~~~bi~= E~~~r 2~gJ~~.~

zL A7&4 r~)"<i=,-&~4~/'z~J r~.'I/

.l~Mc~P'e~D'M~ ~X&=

Ic/

6/J d(.cf~v+s,JJ~pcc/g 5J".i ~~~lp/ri~ I

r~l g~~ -6/~c'l~dl

~87~ c'Z, =/ay~

-/~ ~O

,"fO i'g, f r

1 p

.u~/~: 4 ~rA

-'za i.-.prd62lJS /MLC.~~&l: ~ri~l

~1llriILJMid' J P&zJXBVdLlt~/CJp 8 lg~~ >"<-~c4>r i'm~gg>p~

.cad ra Q ~~~1M~~~

r h

4'0i 0

p

~

r. >>s CB~C.

/

P +trj~P ue I) c>>g>>

NC S'C&s'~r gsJ zv

~ J/)

.Vr c~~rlgp I'QQ'p~

I<ra~i~re~g

=.a

'r, r./ 'p r /

/r) ~ I "0

i r" 8 pr~

2r

~c.

~g/

)

~

5 r

=;J) c's'

/,

~ r /I'"

. N/r 'rs/

"r.

~C I

C r>

g /~<'crc

/'r r +C/'

r".(a C'I'r rt eC' ff

>>c /I/err

~ r<<'=<'/rc"I's

~'r I/

)"f"I'"rrl

~

r/

r4"ir Bw t

~~/ ~/rcr cr.

r'/

i>>r'.9 C

c>> g r>>

) 4/c

/

Il

> /k

+C' r'~J c

!c/r

/

r

<'~,'4/')

II I ~

/7 s

r

APPL'lDIZ 8 T.T 1'";t'4tE l'"l'"OPZ'4'CE ZVU.UATTON(CO.'T.'1TRUCT70H)

>'~nl l ~ ty-Palo Verde Nuclear Generating Station Arizona Public Service Company Unit. Identification:

Units 1, 2 and 3

a-OI0<

V Docket '.lo.

CP lTo

. /J<a tr nf l""nance Unit-Ho.

4 50-528 50-529 50-530 CPPR-141

- May 25, 1976 CPPR-142 - May 25, 1976 CPPR-143 May 25, 1976

'It Hew<:tor Inform<il.ion:

HSSS Unit 1

Unit 2 Unit 3 CE(System 80)

CE(System 80)

CE(System 80) 3800 MWt 1307 HWe 3800 MWt 1307 NWe 3800 HWt 1307 HWe hppr~iuvl Period; May 1979 - Hay 1980 (Inclusive)

APPralaal Co@Plat>on AaLr.

Hay 3P 198P Rcv I r.'rl AoJ t il l1rwilirr:;:

R. T. Dodds, Chief, Engineering Support Section J.

H. Eckhardt, Reactor Inspector L. E. Vorderbrueggen, Resident Inspector

~ll0 ~

~

nU 2>)55 A.

Nu!ether ~nu Nature cf Kvzcvmol No>>c<>:rg>fiance cater.ory.'zola talons infractions Deficiencies Unit 1

0 5

2 U>>iL 2 V

0 3

1 Unit 3 0

0 0

Areas of Noncvmol ia>>c>:;

(List Areas as

'R>.>~>>ired)

Unit. l (Po

> >'iL::)

Unit 2 (Points' Unit a

~Points )

See attached chart.

Total Points 50 30 P..

Number and.'lature ot Deficiency Reports See attached chart.

C.

Bulletins All applicable bulletins have been responded to in a satisfactorially and timely manner.

P, Escalated F>>f>>r< emenl Actions Civil Pd>>>a J [.pcs None Order"-

Hone

~ ~

e ~ ~

~e ooe e

I~d.'d fate Act > v>> l.('Lt.eqs Memo of understanding issued 5/9/79 concerning Unit 1

dome liner plate (attached).