Letter Sequence Meeting |
|---|
|
Results
Other: GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary, GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602, GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment, ML17278A575, ML17278A805, ML17278A846, ML17278A863, ML20206K639
|
MONTHYEARML20206K6391972-05-31031 May 1972 Ack Receipt of Re Technical Basis for Accepting Weld Surface Area W/Bluish Tint.No Further Questions Project stage: Other ML17278A2521985-06-26026 June 1985 Notification of 850627 Meeting W/Util & Exxon in Bethesda,Md to Identify & Clarify Preliminary Requirements for First Refueling of Plant Project stage: Meeting ML17278A3201985-07-26026 July 1985 Summary of 850627 Meeting W/Util & Exxon Nuclear in Bethesda,Md Re Util Plans & Preparations for Cycle 2 Core Reload Currently Scheduled for Spring 1986.List of Attendees & Viewgraphs Encl Project stage: Meeting GO2-86-081, Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid1986-01-17017 January 1986 Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid Project stage: Request ML17278A5751986-01-17017 January 1986 Proposed Tech Spec Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection Project stage: Other GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 8606021986-01-30030 January 1986 Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602 Project stage: Other ML17278A8051986-03-31031 March 1986 Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle 1 & Final Feedwater Temp Reduction Project stage: Other GO2-86-311, Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request1986-04-0707 April 1986 Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request Project stage: Request GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date1986-04-24024 April 1986 Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date Project stage: Supplement GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept1986-04-25025 April 1986 Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept Project stage: Request GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment1986-04-30030 April 1986 Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment Project stage: Other ML17279A6481986-05-0101 May 1986 Draft Lead Test Assembly Program,Wpps 2 Project stage: Draft Other ML17278A8411986-05-22022 May 1986 Provides Supplemental Info to 860226 Application to Amend License NPF-21 Re Cycle 2 Reload.Use of Two Separate Sets for two-loop Operating Limits for Fuel Types & Separate Set for Single Loop proposed.Marked-up Tech Specs Encl Project stage: Supplement ML17278A8481986-05-23023 May 1986 Safety Evaluation Supporting Amend 28 to License NPF-21 Project stage: Approval ML17278A8461986-05-23023 May 1986 Amend 28 to License NPF-21,revising Tech Specs to Support Operation of Facility at Full Rated Power During Cycle 2 & Establishing Operating Limits for All Fuel Types Project stage: Other ML17278A8631986-05-23023 May 1986 Amend 27 to License NPF-21,revising Tech Spec Table 3.8.4.3-1, Motor-Operated Valves Thermal Overload Protection, to Add Valves Previously Omitted,Add Valves Due to Sys Upgrades & Remove nonsafety-related Valves Project stage: Other ML17278A8651986-05-23023 May 1986 Safety Evaluation Supporting Amend 27 to License NPF-21 Project stage: Approval ML17278A8801986-05-29029 May 1986 Offers No Comments on 860117,0226 & 0328 Requests for Amends to License NPR-21.Request for 1-yr Extension to Install Wetwell Level Monitoring Sys Acceptable But Installation Should Be Completed by Second Fuel change-out Project stage: Request GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary1986-06-27027 June 1986 Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary Project stage: Other 1986-04-25
[Table View] |
Text
~
Docket No. 50-397 850703002b 850b~b
~~
PDR nDOCX 05000397 P
PDR'>
11EJ'10RANDUI4 FOR:
1'Jal ter R. Butler Chief Licensing Branch No.
2 Division of Licensing FROI1:
SUBJECT:
DATE Jmt TItlE:
LOCATION:
PURPOSE:
John 0. Bradfute, Project tlanager Licensing Branch No. 2, Division of Licensing INFORMATION 1'IEETING lJITH THE SUPPLY SYSTEJ1 (WNP-2)
FORTHC011ING REFUELI1'JG
- Thursday, June 27, 1985 I:00 p.m.
Air Rights Building Room 5033
- Bethesda, llaryland To identify and clarify preliminary requirements for the first refueling of WNP-2.
PARTICIPANTS*:
NRC 1J.
Hodges L. Phillips R. Lobel D. Freno W. Brooks H. Richings G. Schwenk H. Campagnone J. Bradfute 1JNP-2 J. Aeschliman D. Larkin W. Wolkenhauer.
EXXON J.
Morgan R. Collingham cc:
See next page John 0. Bradfute, Project h1anager Licensing Branch No.
2 Division of Licensing
- Jleetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open hleeting Statement of NRC Staff Policy",
43 F
ister 28058, 6/28/78.
L L
BC JBradfute:lb 1 t er 06/g(r /85 6+6 /85
~ 4 i) f )
s kf s
Mr. G.
C. Sorensen, l<<anager Washington Public Power Supply System WPPSS IIuclear Pro"'ect No.
2 (WNP-2)
CC:
Nicholas Reynold, Esquire
- Bishop, Cook, Liberman, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.
W.
Washington, D.
C.
20036 I~ir. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 30UC George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairnian Energy Facilit<< Site Evaluation Council Mail Stop PY-0 Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, IiD 9568 Ilichland, Washington 99352 hr. k. G.
Conn Burns and Roe, Incorporated cj'o Washington Public Power Supply System P. 0.
Box 968, tiD 994E Richland, Washington 99352 R.
B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, HD 280
- Richland, Washinaton 99352 llr. C.
I';. Powers WNP-2 Plant Manager llashington Public Power Supply System P. 0.
Box I(D 927h Richland, 'Ilashington 99342 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 tlaria Lane, Suite 210 Walnut Creek, California 94596
~ 0 1
Meetin Notices NRC Partici ants o ges L. Phillips R. Lobel D. Freno W. Brooks H. Richings G. Schwenk N. Campagnone J. Bradfute bcc:
Applicant 5 Service List Internal Docket File NRC PDR Local PDR PRC System NSIC LBP2 Reading HDenton/DEisenhut HThompson/FNiraglia TNovak BYoungblood WButler GKnighton EAdensam J2wolinski CGrimes GHolahan CThomas GLainas SVarga DVassallo JNiller JStolz JKnight, Acting Dir.,
DE WJohnston RBosnak, Acting, AD/CSE, DE RBernero LRubenstein WHouston DMuller TSpeis FSchroeder FRowsome TWRussell, Acting Dir., DHFS ACRS-16 OELD, Attorney Paton JPartlow BGrimes EJordan
- FIngram, PA Receptionist (Only if meeting is held in Bethesda)
N g
E. Hylton Region 5
y 0
.4 f,