ML17278A855

From kanterella
Jump to navigation Jump to search

Amend 25 to License NPF-21,revising License Condition 2.C.(16) to Require Implementation of Requirements of Rev 2 to Reg Guide 1.97 W/Exception of Flux Monitoring,Prior to Startup Following First Refueling Outage
ML17278A855
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/23/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17278A856 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-61114, NUDOCS 8605300336
Download: ML17278A855 (4)


Text

~ ~

s

'gp.S ~ECy~

Ill<~I UNITED STATES NUCLEAR REGULATORY COMMISSION, WASHINGTON, D..C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING. LICENSE Amendment No.

25 License No. NPF-21 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),

dated March 28,

'1986, and cia'rified by* letters dated May'7.and 8, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act,. and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public,'nd (ii) that such activities will be conducted in compliance with the Commission's'egulations set forth in 10 CFR Chapter I; D.

The issuance of tIIis amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of.

the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Facility Operating License No. NPF-21, Attachment 2, Paragraph

3. of License Condition 2.C.(16) is hereby amended to read as follows:

Attachment 2

Para ra h 3.

(a)

The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2 with the exception of items (b) and (c) below prior to startup following the first refueling outage.

(b)

The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the second refueling outage.

P~R,<DOC6 8605P3 860530033 P

0500039' PDp

l il I

I

'I t

(c)

The licensee shall implement (install and have operational) a wide range suppression pool level monitoring system which satisfies the Category 1 equipment specifications in accordance with Regulatory Guide 1.97, Revision 2, prio'r to startup following the second refueling outage.

3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

'I Elinor G. Adensam, Director BWR Project Directorate No.

3 Division of BWR Licensing Date of Issuance:

May 23, 1986 4