Letter Sequence Withdrawal |
|---|
|
|
MONTHYEARGO2-85-858, Application for Amend to License NPF-21,revising Tech Spec Sections 3.6.1.8 & 4.6.1.8.3 to Change Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted.Fee Paid1985-12-20020 December 1985 Application for Amend to License NPF-21,revising Tech Spec Sections 3.6.1.8 & 4.6.1.8.3 to Change Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted.Fee Paid Project stage: Request ML17278A5301985-12-20020 December 1985 Tech Specs Changing Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted Project stage: Other GO2-85-895, Amends 851220 Application for Amend to License NPF-21 & Requests one-time Only Change to Tech Specs,Revising Standby Gas Sys Purge Limit from 90 to 150 H1985-12-31031 December 1985 Amends 851220 Application for Amend to License NPF-21 & Requests one-time Only Change to Tech Specs,Revising Standby Gas Sys Purge Limit from 90 to 150 H Project stage: Request GO2-86-282, Application for Amend to License NPF-21,extending Time Period for Reg Guide 1.97,Rev 2 Implementation to Prior to Startup Following Second Refueling Outage.Fee Paid1986-03-28028 March 1986 Application for Amend to License NPF-21,extending Time Period for Reg Guide 1.97,Rev 2 Implementation to Prior to Startup Following Second Refueling Outage.Fee Paid Project stage: Request GO2-86-332, Requests Withdrawal of 851220 & 31 Requests for Amend to License NPF-21,revising Tech Specs to Change Standby Gas Sys Limit from 90 to 150 H.Amend No Longer Needed Since Refueling Outage Began Earlier than Expected1986-04-10010 April 1986 Requests Withdrawal of 851220 & 31 Requests for Amend to License NPF-21,revising Tech Specs to Change Standby Gas Sys Limit from 90 to 150 H.Amend No Longer Needed Since Refueling Outage Began Earlier than Expected Project stage: Withdrawal GO2-86-339, Clarifies 860328 Application for Amend to License NPF-21, Revising License Condition 16 to Delay Implementation of Reg Guide 1.97 Requirements Until Second Refueling Outage1986-04-11011 April 1986 Clarifies 860328 Application for Amend to License NPF-21, Revising License Condition 16 to Delay Implementation of Reg Guide 1.97 Requirements Until Second Refueling Outage Project stage: Request GO2-86-408, Submits Addl Clarification to 860328 Request for Amend to License NPF-21,requiring Implementation of Fully Qualified wide-range Suppression Pool Level Monitoring Sys Meeting Reg Guide 1.97,Rev 2 Requirements1986-05-0707 May 1986 Submits Addl Clarification to 860328 Request for Amend to License NPF-21,requiring Implementation of Fully Qualified wide-range Suppression Pool Level Monitoring Sys Meeting Reg Guide 1.97,Rev 2 Requirements Project stage: Supplement GO2-86-411, Withdraws 860328 Request to Defer Qualification of Six Psr Valves Until Second Refueling Outage,Per 860328 Application for Amend to License NPF-211986-05-0808 May 1986 Withdraws 860328 Request to Defer Qualification of Six Psr Valves Until Second Refueling Outage,Per 860328 Application for Amend to License NPF-21 Project stage: Request ML17278A8551986-05-23023 May 1986 Amend 25 to License NPF-21,revising License Condition 2.C.(16) to Require Implementation of Requirements of Rev 2 to Reg Guide 1.97 W/Exception of Flux Monitoring,Prior to Startup Following First Refueling Outage Project stage: Other ML17278A8571986-05-23023 May 1986 Safety Evaluation Supporting Amend 25 to License NPF-21 Project stage: Approval ML17278A8801986-05-29029 May 1986 Offers No Comments on 860117,0226 & 0328 Requests for Amends to License NPR-21.Request for 1-yr Extension to Install Wetwell Level Monitoring Sys Acceptable But Installation Should Be Completed by Second Fuel change-out Project stage: Request ML17278A9351986-07-16016 July 1986 Notice of Withdrawal of 851220,31 & 860328 Applications for Amends to License NPF-21 Project stage: Withdrawal 1986-04-11
[Table View] |
Text
7590-01
,l)NITED STATES NUCLFAR REAULATORY COMMISSION WASHINGTON PUBLIC POWFR SUPPLY SYSTEM DOCVET NO. 50-397 PPPSS NUCLEAR PROJECT NO.
2 NOTICE OF WITHDRAWAL OF APPLICATIONS FOR AMENDMENTS TO FACILITY OPFRATINA LICENSF. NPF-21 The United States Nuclear regulatory Commission
<the Commission or the NRC) has aranted the request of the Washington Public Power Supnly System
~the Supplv System or the licensee) for withdrawal of one and part of another'application
'or amendment to the Facility Operating License No.
NPF-21 for the WPPSS Nuclear Prospect No.
2 located in Benton County, near Richland, Washington.
The Commission issued Notices of Consideration of Issuance of Amendments which were published in the Federal Register.
The dates of application, suhiect matter of the proposed chanaes and Federal Reaister citations are as follows:
l.
Application dated Pecember 20 and 31, 1985, "Drywell and Suppression Chamber Purqe System (Section 3.6. 1.8)", published January 31, 1986 (51 FR 4048);
and 2.
Application dated March 28, 1986, "Request for Amendment to Operating
- License, License Condition 16, Attachment ?, Item 3(a)" published April 23, 1986 (51 FR 15418>.
By letter dated April 10, 1986, the Supply Svstem withdrew its application
+or the amendment reauested on December 20 and 31, 1985; and, on May 8, 1986, the Supply System withdrew its application for the PASS PSR valves portion of the March 28, 1986 amendment request.
For further details see the applications for amendment dated December 20 and 31, 1985, and March ?8, 1986; the licensee's letters dated Apr'il 10, 1986, and May 8, 1986, withdrawing the applications and the Commission's 8607240362 860716 PDR ADOCK 05000397 P
'DR
~
w '
s,
a ), w )w))ac
~ ~
. ~,.
)
~ ))
. ~
letter dated July
'16, 19K, granting the withdrawal requests.
All of these documents are available for public inspection at the Commission's Public Document Rooms at I7$ 7 H Street NM, Mashinoton, DC 20555 and at the Richland Public Library, Swift and Northgate Streets, Richland, hfashington 99352.
Dated at Bethesda, Yiary1and, this 16 day of July 1986.
FOR THE VUCLEAR REAULATORY CON<ISSION Elinor A. Adensam, Director WR Proiect Directorate No.
3 Division of BMR Licensinq
k
'4