EOP:

AP-TURB.2 TITLE:

AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 1 of 10 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPE NT NDENT 8

cled 0

EFFECTIVE DATE QA NON-QA CATEGORY 1. 0 REVIEWED BY:

GINNASTATION START:

DATE TIME COMPLETED:

DATE TIME:

900308037'00g27, DR ADDCK 0500020 PNu

EOP:

AP-TURB.2 TITLE:

AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 2 of 10 A.

PURPOSE This procedure provides the steps necessary to control the plant during an automatic turbine runback.

B.

ENTRY CONDITIONS/SYMPTOMS 1.

SYMPTOMS The symptoms of AUTOMATIC TURBINE RUNBACK are; a.

Annunciator E-28, POWER RANGE ROD DROP STOP -54/5 sec alarm, or b.

Annunciator C-14, ROD BOTTOM ROD STOP alarm, or c.

MRPI Indicated Rod on Bottom d.

Annunciator F-30, OPaT TURBINE RUNBACK, or e.

Annunciator F-31, OTaT TURBINE RUNBACK.

I

EOP:

AP-TURB. 2 TITLE:

AUTOMATIC TURBINE RUNBACK REV 8

PAGE 3 of 10.

STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OCCURS, E>>O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.

NOTE:

o Step 1 and 2 are IMMEDIATE ACTION steps.

o Any runback signal will block auto out motion of rod control system.

O 1

Check Rod Control:

o Rod control bank selector switch

- IN AUTO Place rod control bank selector switch in manual and drive rods. in as required.

o Control rods - STEPPING IN AS REQUIRED O

2 Check Turbine Load DECREASING Place EH in manual and decrease turbine load as necessary.

EOP:

AP-TURB. 2 TITLE:

AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 4 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

Vith a PR lover detector failed low, the plant could experience both a dropped rod turbine runback with continuing aT runbacks.

3 Establish Cause Of Turbine Runback:

a.

Check for dropped rod runback:

o Annunciator AR-E28, power range rod drop rod stop-5X/5 sec alarm - LIT

-OR-o Any PR channel

- INDICATING SIGNIFICANTLY LESS THAN THE OTHER 3 CHANNELS a.

Check for delta T runback:

o Annunciator AR-F30, OPAT TURBINE RUNBACK alarm - LIT.

-OR-o Annunciator AR-F31, OTaT TURBINE RUNBACK alarm - LIT.

-OR-

-OR-o Annunciator AR-C14, ROD BOTTOM ROD STOP alarm (AR-C14) - LIT

-OR-o Any delta T within 1.71 F of OP or OP setpoint.

Go to Step 8.

o MRPI Indicates - ROD ON BOTTOM 4 Verify Turbine Load Reduction AT LEAST 204 Place EH in manual and reduce load by 20X.

I

/

I 1

0

EOP:

AP-TURB.2 AUTOMATIC TURBINE RUNBACK REV 8

PAGE 5 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 5 Verify Steam Dump Armed And Operating If Required:

o Annunciator G-15, steam dump alarm - LIT o

Steam dump valves operating as necessary

- TO CONTROL TAVG WITHIN +6'F OF TREF Operate steam dump'anually:

a. Place steam dump mode selector to MANUAL.
b. Place S/G cond stm dump HCV-484 controller to MANUAL.

c.

Open steam dump valves as required to stabilize Tavg within +6'F of Tref.

6 Establish That Stable Plant Conditions Are Being Achieved:

a. Tavg - TRENDING TO TREF b.

PRZR pressure

- TRENDING TO 2235 PSIG c.

PRZR level - TRENDING TO PROGRAM

a. Insert control rods or, if necessary, decrease turbine load to match Tavg to Tref.
b. Verify proper operation of PRZR heaters and spray or take manual control of PC-431K.
c. Verify proper operation of charging pump speed controllers or take manual control of speed controllers to control PRZR level.

EOP:

AP-TURB. 2 TIILE:

AUTOMATIC TURBINE RUNBACK REV 8

PAGE 6 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 7

Check NIS PR Indication Normal And No Control Or Shutdown Rods Dropped:

a.

PR detectors total output - NOT FAILED LOW b.

PR lover detector

- NOT FAILED LOW

a. Refer to ER-NIS.3, PR MALFUNCTION.
b. IF PR lower detector has failed lov, THEN:
1) Allov runback to reduce reactor pover to 75X.
2) Place EH in manual to terminate the runback.
3) Refer to ER-NIS.3, PR MALFUNCTION.

c.

PR upper detector

- NOT FAILED LOW

c. Refer to ER-NIS.3, PR MALFUNCTION.
d. Annunciator AR-C14, ROD BOTTOM ROD STOP alarm - EXTINGUISHED e.

Go to Step 12 d.

Go to AP-RCC.2, RCC/RPI MALFUNCTION.

NOTE:

Tavg will indicate high or lov for some instrument failures affecting steam dump control, rod control, and PRZR level control.

8 Verify Adequate Turbine Load Reduction:

o EH setter and turbine load-DECREASING Place EH control in manual and reduce turbine load until high delta T condition clears.

-OR-o Turbine runback signal - CLEARED

EOP:

AP-TURB.2 AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 7 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 9 Verify Steam Dump Armed And Operating:

o Annunciator G-15, steam dump alarm - LIT o

Steam dump valves operating as necessary

- TO CONTROL TAVG VITHIN +6'f OF TREF Perform the following:

a. Place steam dump mode selector to MANUAL.
b. Place'S/G cond stm dump HCV-484 controller to MANUAL c.

Open steam dump valves as required to stabilize Tavg within +6'F of Tref.

10 Check NIS PR Indication Normal:

o PR upper detector

- NOT FAILED HIGH IF NIS PR upper detector has failed

high, THEN:
a. Allow runback to reduce reactor power to 75X.
b. Place EH in manual to terminate runback.
c. Defeat failed PR channel (Refer to ER-NIS.3, PR MALFUNCTION).

d.

Go to Step 12.

EOP:

AP-TURB.2 TITLE:

AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 8 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

aT vill indicate high for some instrument failures affecting the rod insertion limit (RIL) calculation and give RIL alarms when none are warranted.

11 Check And Compare All Delta T Channels:

o All 4 delta T channels actual aT and hT setpoint

- INDICATING APPROXIMATELY THE SAME VALUE o All 4 delta T channels-RESPONDING TO THE TURBINE RUNBACKS Perform the folloving:

a.

Check for instrument failure:

r o

1 delta T channel indicating significantly different than other 3 and not responding to turbine runback.

o Any PRZR pressure or Tavg channel malfunction.

b. IF 1 channel is failed, THEN:

'-')

Allov runback to reduce reactor pover to 75X.

2) Place EH in manual to terminate runback.
3) Defeat failed channel (Refer to ER-INST.l, REACTOR PROTECTION BISTABLE DEFEAT AFTER INSTRUMENTATION LOOP FAILURE).

EOP:

AP,TURB. 2 TITLE:

AUTOMATIC TURBINE RUNBACK REV:

8 PAGE 9 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF STEAM DUMP CONTINUES FOR A SIGNIFICANT LENGTH OF TIME, CONDENSATE TEMPERATURE AND CONDENSER BACK PRESSURE SHOULD BE MONITORED.

NOTE:

Tavg will indicate high or low for some instrument failures affecting steam dump control, rod control, and PRZR level control.

12 Establish Stable Plant Conditions:

Perform the following:

a. Tavg - TRENDING TO TREF b.

PRZR pressure

- TRENDING TO 2235 PSIG c.

PRZR level - TRENDING TO PROGRAM d.

Steam dump valves - CLOSED e.

Rod insertion limit alarms-EXTINGUISHED

a. Insert control rods or, if necessary decrease turbine load to match Tavg to Tref.
b. Verify proper operation of PRZR heaters and spray or take manual control of PRZR press controller 431K.
c. Verify proper operation of charging pump speed controllers OR take manual control of speed controllers to control PRZR level.
d. Verify proper operation of SD control system OR take manual control to close SD valves.
e. Verify proper operation of rod control system.

Refer to AP-CVCS.2, IMMEDIATE BORATION.

EOP:

AP-TURB.2 TITLE:

AUTOMATIC TURBINE RUNBACK REV 8

PAGE 10 of 10 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 13 Check For Guidance After Runback Has Terminated REFER TO 0 5g LOAD VARIATIONS 14 Check With Higher Supervision TO OBTAIN APPROVAL PRIOR TO INCREASING TURBINE LOAD

-END-