Text

EOP:

AP-RHR.2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 1 of 11 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE 0

P T SUPERINT DE T

'L 8 cd 0

EFFECTIVE DATE QA X

NON-QA CATEGORY 1.0 I

REVIEWED BY:

GINNASTATION START:

DATE TIME CC VIi-'LETEC):

DATE TIME'003080340 900227 PDR ADOCK 05000244 FNu Q

.0

EOP:

AP-RHR. 2 LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 2 of 11 A.

PURPOSE This procedure provides guidance necessary for maintain-ing core cooling and protecting the reactor core-in the event that RHR cooling is lost during RCS reduced inventory operation, (i.e.,

at indicated "B" Loop Levels of less than 64 inches).

B.

ENTRY CONDITIONS/SYMPTOMS 1.

SYMPTOMS The symptoms of (Loss of RHR At RCS Reduced Inventory Conditions) are:

a.

Annunciator A-20, RESIDUAL HEAT REMOVAL LOOP LO FLOW 2900 GPM (Set at 400 GPM per 0-2.2 in RHR Cooling mode) alarm is lit, or b.

Unexpected increase in RCS temperature while on RHR cooling at low loop levels, or c.

Erratic or no flow on FI-626, or d.

Annunciator J-9, Safeguard Breaker Trip alarm lit.

I

EOP:

AP-RHR. 2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 3 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 1

Establish CNMT Closure 0-2.3.1A, CONTAINMENT CLOSURE CAPABILITY DURING RCS REDUCED INVENTORY OPERATION, Step 5.8, while continuing with this procedure 2

Check RHR Pumps AT LEAST ONE RUNNING Go to Step 7.

CAUTION DO NOT START A SECOND RHR PUMP UNTIL THE CAUSE OF THE ERRATIC FLOV OR LOSS OF FLOV ON THE FIRST PUMP HAS BEEN DETERMINED AND CORRECTED.

3 Check RHR Flow GREATER THAN 200 GPM AND STABLE Perform the following:

a.

Stop all running RHR pump(s).

b.

Go to Step 7.

4 Verify CCW Operation:

o CCV pumps - AT LEAST ONE RUNNING o

CCV To RHR Hxs, MOV-738A and MOV-738B -

OPEN AS NECESSARY o

CCV temperature and flow alarms

- EXTINGUISHED Perform the following:

a. Restore CCV to RHR:

o Start the standby CCW pump if it is not running.

o Open MOV-738A and MOV-738B, as necessary.

b. IF CCV can NOT be restored, THEN refer to AP-CCV.3, LOSS OF CCW-PLANT SHUTDOWN, Step l.

0 E

f$

yW+W q'j'

EOP:

AP-RHR.2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 4 of ll STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 5 Verify RHR Alignment - NORMAL Align valves as required.

(Refer to Attachment'.

A) 6 Check RCS Temperature:

a.

RCS temperature

- STABLE OR DECREASING b.

Go to Step 12

a. Return to Step 2.

7 Check If RCS Loop Level Must Be Raised:

a.

RCS loop level - LESS THAN 30" ON B LOOP LEVEL INDICATOR

a. IP RCS loop level is greater than 30",

THEN start an available RHR pump and go to Step 9 immediately.

-~

EOP:

AP-RHR.2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION BEFORE RAISING LOOP LEVEL, THE S/G OFFICE SHOULD BE NOTIFIED.

\\

8 Increase RCS Loop Level By The Following Methods, Listed in Preferential Order of Use:

a. Gravity feed method:
1) Close RHR pump discharge valve to loop B cold leg, MOV-720
2) Dispatch AO to locally open RHR pump suction from RWST, MOV-856
3) Check RCS loop level-INCREASING AS EXPECTED 4)

WHEN B loop level indicator greater than 30 in.,

THEN close MOV-856

" 3) IF RCS loop level NOT increasing, THEN close MOV-856, open MOV-720, AND go to Step 8b.

5) Open RHR pump discharge valve to B loop cold leg, MOV-720
6) Start one RHR pump 7)

Go to Step 9 immediately

5) IF MOV-720 does NOT open, THEN open core deluge valves MOV-852A and MOV-852B.

This Step continued on the 'next page.

EOP:

AP-RHR.2 LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED (Step 8 continued from previous page)

b. Charging to intact loop cold leg method:
1) Check B loop cold leg-INTACT
2) Open charging line valve to loop B cold leg, AOV-294
3) Verify HCV-142 demand at OX
4) Start operable charging pump and increase flow to maximum
5) Check RCS loop level-INCREASING AS EXPECTED 6)

WHEN B loop level indicator greater than 30 in.,

THEN stop operating charging pump

7) Close charging line valve to loop B cold leg, AOV-294
8) Start one RHR pump This Step continued on the next page.
1) IF A loop cold leg intact, THEN go to Step 8c.

IF A loop cold leg NOT

intact, THEN go to Step 8d.
4) IF charging pump will NOT
start, THEN:

a) Close AOV-294.

b)

Go to Step 8d.

5) IF RCS loop level NOT increasing as expected, THEN:

a) Stop operating charging pump b) Close AOV-294.

, c) IF A loop cold leg intact, go to Step 8c.

d) IF A loop cold leg NOT

intact, go to Step 8d.

I I,

EOP:

AP-RHR. 2 TITLE:

LOSS OF RHR 'WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED (Step 8 continued from previous page) 9)

Go to Step 9 immediately

c. Charging to A loop cold leg method:
1) Open alternate charging line to loop A cold leg, AOv-392B
2) Start operable charging pump and increase flow to maximum
3) Check RCS loop level-INCREASING AS EXPECTED 4)

WHEN B loop level indicator greater than 30 in.,

THEN stop operating charging pump

5) Close alternate charging line to loop A cold leg, AOV-392B
6) Start one RHR pump 7)

Go to Step 9 immediately

2) IP charging pump will NOT
start, THEN:

a) Close AOV-392B.

b)

Go to Step Sd.

3) IP RCS loop level NOT increasing as expected, THEN:

a) Stop operating charging pump.

b) Close AOV-392B.

c) Go,to Step Sd.

This Step continued on the next page.

/p

EOP:

AP-RHR. 2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 8 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED (Step 8 continued from previous page)

d. Safety injection to loop hot legs method:
1) Open loop hot leg SI inlet, valves MOV-878A and/or MOV-878C
2) Open SI pumps suction valves MOV-825A and/or MOV-825B
3) Start operable safety injection pump
4) Check RCS loop level-INCREASING AS EXPECTED 5)

VHEN B loop level indicator greater than 30 in.,

THEN stop operating safety injection pump

6) Close SI pumps suction valves

~ MOV-825A

~ MOV-825B

7) Close loop hot leg SI inlet valves

~ MOV-878A

~ MOV-878C.

8) Start one RHR pump 9)

Go to Step 9 immediately

4) IP RCS loop level NOT increasing as expected,

~TH a) Stop operating SI pump.

b) Close loop hot leg inlet valves.

~ MOV-878A

~ MOV-878C c) Close SI pump suction valves.

~ MOV-825A MOV-825B d) Return to Step l.

I I

EOP:

AP-RHR.2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV 2

PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 9 Verify RHR Flow:

a.

RHR flow - GREATER THAN 200 GPM AND STABLE b.

Go to Step 12

a. IF an RHR pump is running with less than 200 gpm flow or erratic flow is indicated, THEN:
1) Stop running RHR pump.
2) Direct auxiliary operator to vent RHR suction line in CNMT by "A" loop, valve 2764.
3) Start one RHR pump.

4)

Go to Step 10 immediately..

10 Verify RHR Flow:

a.

RHR flow - GREATER THAN 200 GPM AND STABLE b.

Go to Step 12

a. IF adequate RHR flow can NOT be established, THEN perform the following:
1) Stop running RHR pump(s).
2) Evacuate CNMT.
3) Check to assure that CNMT closure is completed or nearing completion.
4) Place RCDT pumps in service (Refer to ER-RHR.1, RCDT OPERATION FOR CORE COOLING).

5)

Go to Step 11.

EOP:

AP-RHR.2 TLTLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV 2

PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 11 Verify Maintenance Notified And Continue Attempts To Restore Inoperable RHR Pumps Or RHR Flow:

o Maintenance

- NOTIFIED o

Attempts continued to restore inoperable RHR pumps OR flov o

Go to Step 12 12 Establish Monitoring of RCS Temperature:

o RCS temperature

- MONITORING ESTABLISHED 13 Check With Higher Supervision:

o Higher supervision

- NOTIFIED 14 Check Alternatives For Long Term Cooling:

o Long term cooling alternatives-EVALUATED 15 Check For Site Contingency Classification:

o Site contingency classification REFER TO SC-100, GINNA STATION EVENT EVALUATION AND CLASSIFICATION

4

EOP:

AP-RHR.2

'ITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE ll of ll STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 16 Check For NRC Reporting Requirements:

o NRC reporting requirements-REFER TO 0-9.3, NRC IMMEDIATE NOTIFICATION 17 Verify RHR Cooling:

a.

RHR cooling normal o

RHR cooling - RESTORED o

RCS temperature

- STABLE OR DECREASING

b. Return - REQUIRED PLANT OPERATION
a. Return to Step l.

-END-

EOP:

AP-RHR.2 TITLE:

LOSS OF RHR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS REV:

2 PAGE 1 of 1 ATTACHMENT A NORMAL RHR COOLING VALVE ALIGNMENT RHR from Loop A Hot Leg RHR to Loop B Cold Leg RHR Letdown to CVCS MOV-700 Open MOV-701 Open MOV-720 Open MOV-721 Open HCV-133 Open RHR Pump Discharge Cross-Connect..........

V-709C V-709D Open Open RHR Hx Bypass V-712A V-712B Open Open FCV-626 as desired RHR From 1A RHR Hx.......................

HCV-625 RHR From 1B RHR Hx.......................

HCV-624 RHR Supply Valve From RWST...............

MOV,-856 RHR Pump Suction Valves as desired as desired Closed A RHR Pump o

o

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

B RHR Pump MOV-704A Open MOV-704B Open

t

EMERGENCY PROCEDURES INDEX ISSUED: 01/08/92 TITLE REV DATg E-0 REACTOR TRIP OR SAFETY INJECTION 16 91/05/03 E-1 LOSS OF REACTOR OR SECONDARY COOLANT 10 91/05/03 E-2 FAULTED STEAM GENERATOR ISOLATION 4

90/04/09 E-3 STEAM GENERATOR TUBE RUPTURE 12 91/07/26

0