Informs NRC That FPL Has Completed Implementation of Formal Industry Position on Severe Accident Mgt Approved by NEI Nuclear Strategic Issues Advisory Committee on 941104
ML17229A951
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/18/1998
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-315, NUDOCS 9812220105
Download: ML17229A951 (3)


Text

CATEGORY j.

REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9812220105 DOC.DATE: 98/12/18 NOTARIZED: NO DOCKET FACIL:50=335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 389 St. Lucie Plant, Unit 2, Florida Power E Light Co. 05000389 AUTH. NAME .AUTHOR AFFILIATION STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs NRC that FPL has completed implementation of formal industry position on severe accident mgt approved by NEI Nuclear Strategic Issues Advisory Committee on 941104.

DISTRIBUTION CODE:

TITLE: OR ADO ID COPIES RECEIVED: LTR Submittal: General Distribution t ENCL 0 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA PD2-3 PD GLEAVES,W INTERNAL: ACRS FILE CENTER 01 1 1 NRR/DE/ECGB/A R DE EMCB 1 1 NRR/DRCH/HICB NRR/DSSA/SPLB 1 NRR/DSSA/SRZB NRR/SPSB JUNG,I 1 NUDOCS-ABSTRACT OGC/HDS3 1 EXTERNAL: NOAC NRC PDR D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL

la Florida Power & Light Company. 6351 S. Ocean Drive, Jensen Beach, FL 34957 December 18, 1998 L98-315 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Severe Accident Management Guidelines Im lementation 94-04 The purpose of this letter is to inform you that Florida Power & Light Company (FPL) has completed implementation of the formal industry position on severe accident management approved by the Nuclear Energy Institute's (NEI) Nuclear Strategic Issues Advisory Committee on November 4, 1994. That FPL commitment, previously communicated in FPL letter L-95-103 dated March 29, 1995, stated that:

IrII wdl Assess current capabditres to respond to severe accident conditions using Section 5 of NEI 91-04, Revision 1, "Severe Accident Issue Closure Guidelines. "

Implement appropriate improvements identified in the assessment, wiChin the consbnints of exMng personnel and hardtvare, no later than December 31, 1998.

As committed in our letter L95-103, FPL utilized the implementing guidance (contained in NEI Report 91-04, Revision 1), to'omplete the assessment of severe accident management capabilities and made enhancements to the Combustion Engineering Owner's Group guidance, Generic Accident Management Guidelines, CE-NPSD-0916, Revision 0, for the St. Lucie Units. FPL implementation of the plant specific severe accident management guidelines was observed by the NRC resident inspector during an emergency drill in October 1998. The results of the NRC observations are documented in NRC Inspection Report 98-10.

Should there be any questions on this submital, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 98i2220i05 98i2i8 /