Responds to NRC 920214 Ltr Re Violations Noted in Insp Rept 50-335/91-18 & 50-389/91-18.Corrective Actions:Complete Testing for Unit 1 within 60 Days of Start Up from Cycle 13 Refueling Outage Scheduled for Fall 1994
ML17227A294
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/14/1992
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-020, L-92-20, NUDOCS 9202190116
Download: ML17227A294 (5)


Text

ACCELERATED DISTRIBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTR I BUTION S YSTEM (RI DS )

ACCESSION NBR:9202190116 DOC.DATE: 92/02/14 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 920214 ltr re violations noted in insp rept 50-335/91-18 & 50-389/91-18.Corrective actions:complete testing for Unit 1 within 60 days of start up from Cycle 13 refueling outage scheduled for Fall 1994.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR 'NCL D SIZE: E TITLE General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES TD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD NORRIS,J INTERNAL: ACRS AEOD AEOD/DEIIB AEOD/DSP/TPAB .

DEDRO NRR HARBUCK,C.

NRR MORISSEAU,D NRR/DLPQ/LHFBPT NRR/DLPQ/LPEB10 NRR/DOEA/OEAB NRR/DREP/PEPB9H NRR/DST/DIR 8E2 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT OE D OGC/HDS3 RES RGN2 FILE 01 EXTERNAL: EG&G BRYCE,J.H. NRC PDR NSIC D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

AL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL

P.O. Box14000, Juno Beach, FL 33408-0420 FEB 1 0 1992 L-92-020 10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Res onse to Ins ection Re ort 91-18 Inspection Report 91-18 documented the results of the Nuclear Regulatory Commission (NRC) inspection of Florida Power and Light (FPL) in the area of Generic Letter 89-10 "Safety Related Motor Operated Valve (MOV) Testing and Surveillance." The NRC requested a written response on two concerns. The first concern was "...that the schedule recommended by the generic letter will not be met due to delays resulting from the licensee's recent decision to alter its diagnostic test method because of deficiencies testing."

disclosed in the previous method through recent industry The second concern was "...that differential pressure and flow testing was omitted for several valves in a group and was being considered for an additional group, even though these valves could have been tested..."

FPL would like to revise the schedule for GL 89-10 testing. FPL would complete testing for Unit 1 within 60 days following the start-up from the Cycle 13 refueling outage scheduled for the fall of 1994 and for Unit 2 within 60 days following the start-up from the Cycle 9 refueling outage scheduled for spring of 1995. We believe this extension is justified based upon the following considerations.

Unit 1 Insufficient time existed between FPL's receipt of GL 89-10 (July 18, 1989) and the start of the next refueling outage (January 22, 1990) to properly develop and plan for the testing requested by the generic letter.

9202190116 920214 PDR Q

ADOCK 05000335 PDR pgpt i I) an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 es o se to s cti e ort 1-Page two Unit 2 MOV testing performed during the next refueling outage (fall, 1990) was performed using MOVATS TMD equipment and technology. During the summer of 1991, INEL testing revealed the inaccuracies with this type of test equipment.

As a consequence, the first refueling outage testing was inadequate for the purposes of meeting the requested testing of GL 89-10.

Regarding the second concern, FPL has included all Bulletin 85-03 valves into the GL 89-10 program and will test all valves in the program where practicable.

Should there be any'questions, please contact us.

Very truly yours, Z. H. Goldberg President Nuclear Division DAS:JHW:re cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Attention: G. Zenkins Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL f620-92