Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML15327A213, ML16133A459, ML16133A499, ML16312A270, ML17207A165, ML17250A244, ML17256A286, ML18212A032, ML18212A181, ML18212A185, ML18212A188, ML18212A190, ML18212A194, ML18212A195, ML18213A104, ML18213A114, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components, NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other 05000247/LER-2016-004, Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts2016-05-31031 May 2016 Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts Project stage: Request ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request ML16312A2702016-11-0909 November 2016 Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Other NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-012016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other ML16350A4852016-12-15015 December 2016 Letter Enclosing Sipos Notice of Withdrawal Project stage: Request NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Other NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt RAIs Project stage: Approval NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-032017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-022017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-052017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Supplement ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17191A4562017-09-20020 September 2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Other ML17180A5032017-09-21021 September 2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement ML17298A5442017-11-13013 November 2017 Summary of Meeting with the National Marine Fisheries Service Related to Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Project stage: Meeting NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A5842018-09-17017 September 2018 Issuance of Renewed Facility Operating License Nos. DPR 26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Request ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval 2017-04-19
[Table View] |
Text
- =-=* Entergx Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, NY 10511-0249 Tel (914) 254 6700
- NL-17-092 July 27, 2017 Anthony J Vitale Site Vice President U.S. Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738
SUBJECT:
REFERENCES:
Dear Sir or Madam:
Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Regarding License Renewal Application RAI SET 2017-05 for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408)
Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
- 1) Entergy letter dated June 8, 2017, "Reply to Requests of Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI SET 2017 ~05 (CAC Nos. MD5407 and MD5408) (NL-17-069)
- 2) NRC letter dated April 28, 2017, "Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI SET 2017-05 (CAC Nos. MD5407 and MD5408)," (ML17110A133)
- 3) Entergy letter dated December 15, 2016, "Amendment 18 to License Renewal Application (LRA) Indian Point Nuclear Generating Unit Nos.
2 and 3," (NL-16-138) (ML16358A526)
By Reference 1, Entergy Nuclear Operations, Inc. (Entergy) provided responses to additional information requested by the U.S. Nuclear Regulatory Commission (NRC), identified in Reference 2 pertaining to the review of the License Renewal Application (LRA) for Indian Po.int Energy Center (IPEC) Unit Nos. 2 and 3.
During its review of the response to RAI 3.3.2-17-IP3-1, the NRC staff noted an apparent inconsistency between the response and the revised LRA Table 3.3.2-17-IP3. The response stated that the carbon fiber-reinforced epoxy was applied on the exterior circumference of a pressure-retaining clamp, while the revised LRA Table 3.3.2-17-IP3 indicated that the piping was made of carbon fiber-reinforced epoxy. In this situation, the pressure-retaining clamp acts as the piping and the carbon fiber-reinforced epoxy acts as an exterior coating. For clarification, Entergy is providing an amended response to RAI 3.3.2-17-IP3-1 in Attachment 1.
NL-17-092 Docket Nos. 50-247 and 50-286 Page 2 of 2 As a result of this amended response, a revised LRA Table 3.3.2-17-IP3 is provided in.
The response provided in this submittal supersedes in its entirety the response previously provided by Reference 1.
There are no new commitments being made in this submittal.
If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.
I declare under penalty of perjury that the foregoing is true and correct. Executed on 7 /-;;..7 I 2017.
(
Sincerely, AJV/rl Attachments:
- 1.
Reply to NRG Request for Additional Information Regarding the License Renewal Application
- 2.
Revised LRA Table 3.3.2-17-IP3 cc:
Mr. Daniel H. Dorman, Regional Administrator, NRG Region I Mr. Sherwin E. Turk, NRG Office of General Counsel, Special Counsel Mr. William Burton, NRG Senior Project Manager, Division of License Renewal Mr. Richard V. Guzman, NRR Senior Project Manager Ms. Bridget Frymire, New York State Department of Public Service Ms. Alicia Barton, President and CEO NYSERDA NRG Resident Inspector's Office
ATTACHMENT 1 to NL-17-092 REPLY TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE RENEWAL APPLICATION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
RAI 3.3.2-17-IP3-1
Background
NL-17-092 Page 1 of 2 Section 54.21 (a)(3) of Title 10 of the Code of Federal Regulations (10 CFR) requires the applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. As described in SRP-LR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the GALL Report and when evaluation of the matter in the GALL Report applies to the plant.
As amended by letter dated December 15, 2016, LRA Table 3.3.2-17-IP3 states that fiberglass city water piping exposed to soil has no agirig effect and no recommended aging management program.
The subject letter also describe~r the change to Table 3.3.2-17-IP3 as: "[p]ermanently repaired pipe (line #1033) with a pressure retaining clamp and using CSI Pipe Wrap-Ply material (carbon fiber) applied on the exterior circumference of the pipe and clamp."
- 1. It is unclear to the staff, based on conflicting information provided above, if the line item represented in LRA Table 3.3.2-17-IP3 is fiberglass piping or is carbon fiber applied on the exterior circumference of the pipe.
- 2. The "parameters monitored or inspected" program element of GALL Report AMP Xl.M41, "Buried and Underground Piping and Tanks," as modified by LR-ISG-2015-01, "Changes to Buried and Underground Piping and Tank Recommendations,"
recommends visual inspections of the external surface condition of polymeric materials to detect (a) loss of material due to wear; and (b) cracking, blistering, and change in color due to water absorption.
Request
- 1. Clarify if the line item represented in LRA Table 3.3.2-17-IP3 is fiberglass piping or is carbon fiber applied on the exterior circumference of the pipe.
- 2. State the basis forwhy (a) loss of material due to wear; and (b) cracking, blistering, and change in color due to water absorption are not aging effects requiring management for polymeric materials exposed to soil.
Response
- 1.
The line item included in LRA Table 3.3.2-17-IP3 as fiberglass piping in Letter NL 138, dated December 15, 2016 (Reference 3), is carbon fiber-reinforced epoxy overlaid onto the exterior circumference of a carbon steel pressure-retaining clamp on carbon steel piping.
NL-17-092 Page 2 of 2
- 2.
In clarification of the line item included in LRA Table 3.3.2-17-IP3 as fiberglass piping by Reference 3, the pressure-retaining clamp provides,the pressure boundary and serves as a continuation of the piping. The effects of aging for the clamp are the same as those for other carbon steel piping in the Buried Piping and Tanks Inspection Program. Because the clamp is not a polymeric material, the effects of aging for polymeric materials exposed to soil do not apply. The line item added for fiberglass piping by Reference 3 is unnecessary in LRA Table 3.3.2-17-IP3. Removal of this line item from the table is shown in Attachment 2. Deletions are lined through.
ATTACHMENT 2 to N L-17-092 REVISED LRA TABLE 3.3.2-17-IP3 Changes are shown as strikethroughs for deletions and underlines for additions ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
Table 3.3.2-17-IP3: City Water Component Intended Material Type Function
~
PFessw=e Fiberglass bo1rnElaFy Table 3.3.2-17-IP3 City Water Summary of Aging Management Review Aging Effect Aging Management Environment Requiring Programs Management Soil (ext)
Nooe Nooe NU REG-1801 Vol. 2 Item NL-17-092 Page 1 of 1 Table 1 Notes Item F-