Zion, Units 1 and 2 - Tsd 14-010, Rev. 6 - Resrad Dose Modeling for Bfm and Soil Dcgl and Calc for Bfm Dose Factors and Dcgls.
ML17215A129
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/12/2017
From: Fauver D
ZionSolutions
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML17215A095 List:
References
ZS-2017-0084 TSD 14-010, Rev. 0
Download: ML17215A129 (1500)


Text

()= () ()

(,)= (,)/ (,)

(,)= (,)x ()

= ,()+

,= +

=

,= , ,, ,

TSD 14-010 I Revision 6 assumed to be the 5,000 dpm/100 cm2 value in l&E Circular 81-07. Actual detection limits in the unconditional release program are lower than this value. Note that if the use of the 5,000 dpm/100 cm2 maximum non-detect limit is deemed to be too conservative, this dose calculation will be revised based on actual survey detection limits as opposed to the conservative 5,000 dpm/100 cm2 upper value. The vast majority of clean concrete fill to be used will come from two buildings; Containment and Turbine. The source term for the dose assessment is calculated by determining the total surface area of the concrete to be used as backfill, assuming uniform surface contamination at 5,000 dpm/100 cm2 gamma, and dividing the resulting total activity by the volume of concrete fill. The source term is then produced with units of mCi/m3 for both Containment and Turbine. The resulting source terms were 8.57E-04 rnCi/m3 and 4.29E-04 mCi/rn3 for the Turbine Building and Containment, respectively. Consistent with the bounding and conservative approach used for this dose assessment, the maximum source term of 8.57E-04 mCi/rn3 was applied to all concrete fill. Because the source term was from both Containment and Turbine concrete the dose calculation was performed using both the Containment and Auxiliary ROC mixtures. The dose was essentially the same for both mixtures but the dose with the Containment mixture was slightly higher (with trivial exception ofWWTF). Consistent with the bounding approach used for the clean concrete assessment the Containment mixture was applied to all concrete. In addition, when applying the ROC mixture, the 5,000 dpm/100 cm2maximum detection limit was assumed to be 100% Cs-137. The remaining radionuclide concentrations were added to the Cs-13 7 concentration at their respective ratios to Cs-137. The dose values are calculated separately for each basement assuming that the entire basement void is filled with concrete only. This conservatively includes the top three feet of fill which will be soil for all basements and not concrete. The full spreadsheet calculation for clean concrete dose is provided in Attachment 15. The dose results for each basement are provided in Table 33. The dose values in Table 33 will be added to any basement where concrete fill is used regardless of the volume of concrete fill used. This is a conservative and bounding approach. T bl 33 Cl a e ean c oncrete FillH th ti ID Lypo e ca oseusme c ontamment ROCM' ix tu re Spent Fuel Crib House/ Auxiliary Containment Pool/ Transfer Turbine WWTF Radionuclide Canals Forebay mrem/yr mrem/yr mrem/yr mrem/yr mrem/yr mrem/yr Co-60 2.54E-02 3.19E-02 2.74E-03 3.27E-02 5.73E-02 4.55E-02 Cs-134 6.18E-05 2.71E-04 2.33E-05 2.43E-04 2.SOE--04 9.57E-04 Cs-137 9.60E-01 l.71E+o0 1.47E-Ol 1.52E+o0 1.49E+OO 6.26E+OO Eu-152 1.1 lE-03 l.28E-03 1.lOE-04 l.33E-03 2.40E-03 1.60E--03 Eu-154 1.64E-04 l.95E-04 1.67E-05 2.00E-04 3.49E--04 2.77E-04 H-3 2.19E-04 3.09E-04 2.65E--05 2.72E-04 2.48E-04 l.17E-03 Ni-63 3.58E-03 6.48E-03 5.57E-04 5.70E-03 5.23E-03 2.46E--02 Sr-90 4.30E-03 l.90E-02 1.63E-03 l.67E-02 l.53E-02 7.22E-02 Total 9.94E-01 l.77E+o0 1.52E-Ol l.58E+o0 1.57E+o0 6.40E+o0 Page 34 of 218

(,)=( ()+ ())

(,)=( ()+ ())

=1212 0.0929=9.73x10

,=( )()25

= 22.54x10 (2.54x10)=3.71x10

,=( )()25

=,,,

= (22.54x10)

=,,,

= ,22.54x10 (2.54x10)

CALCULATION OF GROUNDWATER AND FILL CONCENTRATION FACTORS FROM DUST-MS RESULTS

Reference:

ZionSolutions Technical Support Document 14-009, "Brookhaven National Laboratory Report (BNL), "Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model, Zion Station Restoration Project", December 2014 DUST-MS Assumed Basement Inventory: DUST-MS Inventory (pCi) Auxiliary 6503 Containment 2759 Turbine 14679 Spent Fuel Pool/Transfer Canals 780 Crib House/Forebay 6940 Waste Water Treatment Facility 1124 Calculations: Auxiliary Basement DUST-MS Results GW Conc Factor Fill Conc Factor pCi/L pCi/g pC/L per mCi pCi/g per mCi Co-60 2.60E-08 5.80E-09 4.00E-03 8.92E-04 Cs-134 6.89E-07 3.10E-08 1.06E-01 4.77E-03 Cs-137 2.47E-06 1.11E-07 3.80E-01 1.71E-02 Eu-152 1.07E-07 1.03E-08 1.65E-02 1.58E-03 Eu-154 8.38E-08 7.96E-09 1.29E-02 1.22E-03 H-3 9.10E-04 0.00E+00 1.40E+02 0.00E+00 Ni-63 1.90E-06 1.18E-07 2.92E-01 1.81E-02 Sr-90 1.96E-05 4.51E-08 3.01E+00 6.94E-03 Containment DUST RESULTS GW Conc Factor Fill Conc Factor pCi/L pCi/g pCi/L per mCi pCi/g per mCi Co-60 1.26E-06 2.81E-07 4.57E-01 1.02E-01 Cs-134 6.23E-06 2.80E-07 2.26E+00 1.01E-01 Cs-137 6.23E-06 2.80E-07 2.26E+00 1.01E-01 Eu-152 2.95E-06 2.81E-07 1.07E+00 1.02E-01 Eu-154 2.95E-06 2.81E-07 1.07E+00 1.02E-01 H-3 1.69E-03 0.00E+00 6.13E+02 0.00E+00 Ni-63 4.53E-06 2.81E-07 1.64E+00 1.02E-01 Sr-90 1.14E-04 2.62E-07 4.13E+01 9.50E-02 Spent Fuel Pool/Transfer Tunnels DUST RESULTS GW Conc Factor Fill Conc Factor pCi/L pCi/g pC/L per mCi pCi/g per mCi Co-60 4.25E-07 9.48E-08 5.45E-01 1.22E-01 Cs-134 1.13E-05 5.09E-07 1.45E+01 6.53E-01 Cs-137 4.07E-05 1.83E-06 5.22E+01 2.35E+00 Eu-152 1.75E-06 1.68E-07 2.24E+00 2.15E-01 Eu-154 1.37E-06 1.30E-07 1.76E+00 1.67E-01 H-3 1.49E-02 0.00E+00 1.91E+04 0.00E+00 Ni-63 3.13E-05 1.94E-06 4.01E+01 2.49E+00 Sr-90 3.21E-04 7.38E-07 4.12E+02 9.46E-01 Turbine DUST RESULTS GW Conc Factor Fill Conc Factor pCi/L pCi/g pC/L per mCi pCi/g per mCi Co-60 1.68E-06 3.74E-07 1.14E-01 2.55E-02 Cs-134 8.29E-06 3.73E-07 5.65E-01 2.54E-02 Cs-137 8.29E-06 3.73E-07 5.65E-01 2.54E-02 Eu-152 3.93E-06 3.74E-07 2.68E-01 2.55E-02 Eu-154 3.93E-06 3.74E-07 2.68E-01 2.55E-02 H-3 2.25E-03 0.00E+00 1.53E+02 0.00E+00 Ni-63 6.02E-06 3.73E-07 4.10E-01 2.54E-02 Sr-90 1.52E-04 3.49E-07 1.04E+01 2.38E-02 Crib House/Forebay DUST RESULTS GW Conc Factor Fill Conc Factor pCi/L pCi/g pC/L per mCi pCi/g per mCi Co-60 6.78E-07 1.51E-07 9.77E-02 2.18E-02 Cs-134 3.35E-06 1.51E-07 4.83E-01 2.18E-02 Cs-137 3.35E-06 1.51E-07 4.83E-01 2.18E-02 Eu-152 1.59E-06 1.51E-07 2.29E-01 2.18E-02 Eu-154 1.59E-06 1.51E-07 2.29E-01 2.18E-02 H-3 9.08E-04 0.00E+00 1.31E+02 0.00E+00 Ni-63 2.44E-06 1.51E-07 3.52E-01 2.18E-02 Sr-90 6.14E-05 1.41E-07 8.85E+00 2.03E-02 Waste Water Treatment Facility DUST RESULTS GW Conc Factor Fill Conc Factor pCi/L pCi/g pC/L per mCi pCi/g per mCi Co-60 2.34E-05 5.22E-06 2.08E+01 4.64E+00 Cs-134 1.16E-04 5.20E-06 1.03E+02 4.63E+00 Cs-137 1.16E-04 5.20E-06 1.03E+02 4.63E+00 Eu-152 5.43E-05 5.21E-06 4.83E+01 4.64E+00 Eu-154 5.48E-05 5.21E-06 4.88E+01 4.64E+00 H-3 3.13E-02 0.00E+00 2.78E+04 0.00E+00 Ni-63 8.40E-05 5.21E-06 7.47E+01 4.64E+00 Sr-90 2.12E-03 4.87E-06 1.89E+03 4.33E+00

BFM Groundwater Dose Factors (Not adjusted for insignificant contributor dose)Auxiliary ContainmentSpent Fuel Pool/Transfer CanalsTurbineCrib House/Forebay1WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.00E-041.14E-020.00E+002.87E-032.85E-035.21E-01Cs-134 9.27E-031.98E-010.00E+004.94E-024.91E-029.03E+00Cs-137 2.64E-021.57E-010.00E+003.92E-023.90E-027.17E+00Eu-152 5.96E-053.87E-030.00E+009.69E-049.64E-041.75E-01Eu-154 6.77E-055.62E-030.00E+001.41E-031.40E-032.56E-01H-36.21E-032.72E-020.00E+006.80E-036.75E-031.23E+00Ni-63 2.86E-041.61E-030.00E+004.01E-044.00E-047.31E-02Sr-903.29E-014.51E+000.00E+001.13E+001.12E+002.06E+02 BFM Drilling Spoils Dose Factors (

Reference:

TSD 14-021, Table 5) (Not adjusted for insignificant contributor dose)Auxiliary ContainmentSpent Fuel Pool/Transfer CanalsTurbineCrib House/Forebay1 WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.07E-022.97E-021.58E-019.58E-032.07E-022.26E-01Cs-134 6.29E-031.72E-029.41E-025.54E-031.19E-021.31E-01Cs-137 3.22E-037.27E-034.83E-022.35E-035.05E-035.57E-02Eu-152 5.02E-031.38E-027.46E-024.45E-039.58E-031.05E-01Eu-154 5.57E-031.46E-028.25E-024.73E-031.02E-021.12E-01H-30.00E+000.00E+001.45E-090.00E+000.00E+000.00E+00Ni-63 3.23E-085.61E-083.78E-071.86E-084.81E-084.16E-07Sr-906.26E-051.39E-047.60E-044.61E-051.16E-041.04E-03Note 1: The Crib House/Forebay Groundwater and Drilling Spoils Dose Factors was adjusted higher to account for a revision that lowered the void volume. The demolition plan for the Crib House was revised to leave the interior walls as opposed to removing all interior walls per the original demolition plan. This resulted in a decrease in the Crib House saturated zone fill mass in the Basement Fill Modelwith a corresponding increase in the pCi/g and pCi/L values calculated in TSD 14-009. The BFM and DS dose factors are both directly proportional to the pCi/g and pCi/L concentrations which are inversely proportional to the ratio of the Revised Volume to the Original Volume for the Crib House/Forebay combined. The revised Crib House/Forebay volume and the ratio of the Revised/Original volume is provided in TSD 14-014, Revision 1 (Table 38)Ratio of Revised/Original Crib House/Forebay Volume =8.60E-01

Dose Assessment Clean Concrete Fill at Detection LimitInputs to Calculation Turbine Clean Clean Concrete Fill Surface Area and Volume (

Reference:

6/29/16 email from Don Roth)Surface Area of Turbine Building Clean Concrete to be Used as FillU1 SURFACE AREA (SQ. FT.)U2 SURFACE AREA (SQ. FT.)EL 592 SLABS61,16461,164EL 609 & 617 SLABS52,84852,848EL 630 SLABS14,65414,654EL 642 SLABS83,42083,420EL 592 BEAMS3,8003,800TURBINE FOUNDATIO59,98159,981PERIMETER WALLS1,7281,728MASONRY WALLS56,57056,570TOTALS334,165334,165Volume of Clean Turbine Concrete to be Used as FillVolume21,525cubic yardVolume1.65E+04m3

Containmant Dimensions (cylinder)Diameter Exterior147.00ftDiameter Interior140.00ftCylinder Height 171.50ftThickness3.50ftContainment Dimensions (Roof)Dome Radius Exterio20.17ftDome Radius Interio17.50ftThickness2.67ftConversion Factor929.03cm2/ft2Conversion Factor28316.80cm3/ft3Containment Cylinder Surface Area and VolumeArea of Outer Surfac7.92E+04ft27.36E+07cm2Area of Inner Surface7.54E+04ft27.01E+07cm2Volume of Concrete 2.71E+05ft37.66E+09cm3Containment Roof Surface Area and VolumeArea of Outer Surfac2.56E+03ft22.37E+06cm2Area of Inner Surface1.92E+03ft21.79E+06cm2Volume of Concrete 5.96E+03ft31.69E+08cm3Containment Total Volume (one unit)7.83E+03m3Total Clean Concrete Fill Volume - Containment plus Turbine3.21E+04m3Containment Clean Concrete Fill Surface Area and Volume (Drawing B-210, Reactor Building Containment Structural Arrangement Zion Station Unit No. 1&2 Commonwealth Edison Co. Chicago ll)

Conversion Factors and AssumptionsConversion Factor0.0929m2/ft2Conversion Factor1.0000E+06cm3 per m3Conversion Factor1.000E+04cm2 per m2concrete density2.35g/cm3Non-detect Maximu 5000dpm/100 cm2Conversion factor2.2dpm/pCiConversion Factor1.00E-09mCi/pCiconversion Factor7.65E-01m3/yd3Conversion Factor7.65E+05cm3/yd3CalculationTotal Inventory Gamma in Turbine Clean Conrete Debris at MDC1.41E+01mCiTotal Inventory Gamma in Containment Clean Conrete Debris at MDC6.72E+00mCiInventory per m3 of fillTurbine8.57E-04mCi/m3Containment4.29E-04mCi/m3BasementFill Volume (m3)1gamma inventory (mCi)Unit 1 Containment 1.21E+041.04E+01Unit 2 Containment B1.21E+041.04E+01Auxiliary Building3.76E+043.22E+01Turbine Building4.26E+043.65E+01Crib House and Fore3.92E+043.36E+01WWTF1.01E+038.66E-01Spent Fuel Pool and 1.04E+038.92E-01 Note 1: Fill volumes from TSD 14-021 Revision 1, Table 23 Insignificant Contributor (IC) Dose Adjustement Factor:Assigned IC Dose PercentageIC Dose Adjustment FactorAuxiliary5.00%1.05Containment10.00%1.11Basements other than Auxiliary and Containment5.00%1.05Basement Dose Factors (adjusted for insignificant dose contribution)Auxiliary ContainmentSpent Fuel Pool/ Transfer Canals1 TurbineCrib House/ Forebay WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.14E-024.44E-024.44E-021.30E-022.46E-027.60E-01Cs-134 1.59E-022.17E-012.17E-015.52E-026.16E-029.17E+00Cs-137 2.98E-021.65E-011.65E-014.17E-024.43E-027.22E+00Eu-152 5.35E-031.92E-021.92E-025.65E-031.10E-022.86E-01Eu-154 5.93E-032.19E-022.19E-026.38E-031.21E-023.74E-01H-36.21E-032.72E-022.72E-026.80E-036.75E-031.23E+00Ni-63 2.86E-041.61E-031.61E-034.01E-044.00E-047.31E-02Sr-903.29E-014.51E+004.51E+001.13E+001.12E+002.06E+02Note 1: SFP/Transfer Canal Dose Factors set equal to Containment to account for groundwater pathwayMaximum Basement ActivitymCimCimCimCimCimCiCo-60 2.20E+035.63E+025.63E+021.93E+031.01E+033.29E+01Cs-134 1.57E+031.15E+021.15E+024.53E+024.06E+022.73E+00Cs-137 8.40E+021.52E+021.52E+026.00E+025.64E+023.46E+00Eu-152 4.68E+031.30E+031.30E+034.43E+032.26E+038.76E+01Eu-154 4.22E+031.14E+031.14E+033.92E+032.06E+036.69E+01H-34.03E+039.20E+029.20E+023.68E+033.71E+032.02E+01Ni-63 8.75E+041.56E+041.56E+046.23E+046.25E+043.42E+02Sr-907.59E+015.54E+005.54E+002.21E+012.22E+011.21E-01 ROC Mixture for Containment (

Reference:

TSD 14-019, Revision 1 Table 20)Perent ActivityRatio to Cs-137Co-60 4.675%6.92E-02Perent ActivityRatio to Cs-137Cs-134 0.008%1.21E-04Co-600.908%1.22E-02Cs-137 67.582%1.00E+00Cs-1340.010%1.38E-04Eu-152 0.436%6.45E-03Cs-13774.597%1.00E+00Eu-154 0.058%8.57E-04 Ni-6323.480%3.15E-01H-30.074%1.10E-03Sr-900.051%6.83E-04Ni-63 26.275%3.89E-0199.046%Sr-900.027%4.05E-04 ROC Total Percent Ac99.136%Insignificant Co0.954%Total100.00%Insignificant Contrib0.864%Total100.000% Clean Concrete Hypothetical Dose Containment ROC MixtureAuxiliary ContainmentSpent Fuel Pool/ Transfer Canals TurbineCrib House/ Forebay WWTFmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrCo-60 2.54E-023.19E-022.74E-033.27E-025.73E-024.55E-02Cs-134 6.18E-052.71E-042.33E-052.43E-042.50E-049.57E-04Cs-137 9.60E-011.71E+001.47E-011.52E+001.49E+006.26E+00Eu-152 1.11E-031.28E-031.10E-041.33E-032.40E-031.60E-03Eu-154 1.64E-041.95E-041.67E-052.00E-043.49E-042.77E-04H-32.19E-043.09E-042.65E-052.72E-042.48E-041.17E-03Ni-63 3.58E-036.48E-035.57E-045.70E-035.23E-032.46E-02Sr-904.30E-031.90E-021.63E-031.67E-021.53E-027.22E-02Total9.94E-011.77E+001.52E-011.58E+001.57E+006.40E+00ROC Total Percent ROC Mixture for Auxiliary Basement (

Reference:

TSD 14-019, Revision 1 Table 20)

Clean Concrete Hypothetical Dose Auxiliary ROC MixtureAuxiliary ContainmentSpent Fuel Pool/ Transfer Canals TurbineCrib House/ Forebay WWTFmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrCo-60 4.47E-035.61E-034.82E-045.76E-031.01E-028.00E-03Cs-134 7.08E-053.11E-042.67E-052.79E-042.86E-041.10E-03Cs-137 9.60E-011.71E+001.47E-011.52E+001.49E+006.26E+00Ni-63 2.90E-035.25E-034.51E-044.61E-034.23E-031.99E-02Sr-907.25E-033.20E-022.75E-032.82E-022.58E-021.22E-01Total9.74E-011.75E+001.51E-011.56E+001.53E+006.41E+00

Calculation of Basement Surface DCGLs (pCi/m2) Inputs to CalculationConversion Factor1.00E+09pCi/mCiDose Limit25mrem/yrConversion Factor0.0929m2/ft2Conversion Factor0.0283m3/ft3BFM Groundwater Dose Factors (Not adjusted for insignificant contributor dose)Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.00E-041.14E-020.00E+002.87E-032.85E-035.21E-01Cs-134 9.27E-031.98E-010.00E+004.94E-024.91E-029.03E+00Cs-137 2.64E-021.57E-010.00E+003.92E-023.90E-027.17E+00Eu-152 5.96E-053.87E-030.00E+009.69E-049.64E-041.75E-01Eu-154 6.77E-055.62E-030.00E+001.41E-031.40E-032.56E-01H-36.21E-032.72E-020.00E+006.80E-036.75E-031.23E+00Ni-63 2.86E-041.61E-030.00E+004.01E-044.00E-047.31E-02Sr-903.29E-014.51E+000.00E+001.13E+001.12E+002.06E+02

BFM Drilling Spoils Dose Factors (Not adjusted for insignificant contributor dose)Auxiliary1Containment1Spent Fuel Pool/Transfer Canal Turbine1Crib House/ Forebay1 WWTF1(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.07E-022.97E-021.58E-019.58E-032.07E-022.26E-01Cs-134 6.29E-031.72E-029.41E-025.54E-031.19E-021.31E-01Cs-137 3.22E-037.27E-034.83E-022.35E-035.05E-035.57E-02Eu-152 5.02E-031.38E-027.46E-024.45E-039.58E-031.05E-01Eu-154 5.57E-031.46E-028.25E-024.73E-031.02E-021.12E-01H-31.45E-091.45E-091.45E-091.45E-091.45E-091.45E-09Ni-63 3.23E-085.61E-083.78E-071.86E-084.81E-084.16E-07Sr-906.26E-051.39E-047.60E-044.61E-051.16E-041.04E-03Note 1: BFM DFs for H-3 were reported as zero in TSD 14-019, Table 11. A non-zero value is required for the DCGL calculation. The lowest non-zero DF reported for all nuclides was H-3 in the SFP which was conservatively appliedas the H-3 DF for all Basements.

Basement Surface Areas Survey UnitWall and Floor Surface Aream2Auxiliary Building 542 Floor and All Walls6503Containment Basement2759SFP/Transfer Canal3723Turbine Building Basement14864Crib House/Forebay1,213842WWTF1124

Reference:

TSD 14-014, Table 64Note 1: Crib House/Forebay Volume listed in TSD 14-009, Revision 1 adjusted lower by factor of 0.86 due to revision of decommissioning approach entailing leaving walls(

Reference:

TSD 14-014 Revision 1, Table 38)

Correction factor of 1/0.86 already applied to BFM Dose Factors in "ROC BFM Dose Factors" TabNote 2: Revised Crib House Forebay Surface Area due to leaving interior walls

Reference:

TSD 14-014 Revision 1, Table 64Note 3: Revised SFP/Transfer Tunnel Surface Area in TSD 14-014, Revision 1

Reference:

TSD 14-014 Revision 1, Table 64Surface AreaSurface Area ft2m2Circ Water Discharge Tunnel1 (2) 524004868Circ Discharge Piping3115701075Circ Water Intake Pipe2 (2)474914412 Buttress Pits/Tendon Tunnels4206261916Note 1: Reference TSD 14-014, Table 64. Area includes Unit 1 and Unit 2 Discharge TunnelsNote 2: TSD 14-016 Table 46. Area includes Unit 1 and Unit 2 Intake PipesNote 3: TSD 14-016, Table 50 Note 4: TSD 14-014, Revision 2, Tables 60 & 63, and TSD 13-005 Rev 1 Table 15 Summation Surface Area Used for Basement DCGL Calulation BasementTotal SA (m2)Containment3482Auxiliary7226Turbine27135Crib House/Forebay18254SFP/Transfer Canal723SFP/Transfer Canal Structure Areas Included in DCGL CalculationContainment + SFP/Transfer CanalAuxiliary + SFP/Transfer CanalTurbine + Circulating Water Discharge Tunnels (2) + Circulating Water Intake Pipe (2) + Circ Discharge Pipe +

Buttress Pits/Tendon TunnelsCrib House/Forebay + Circulating Water Intake Pipe (2)

BFM Groundwater DCGLs (Not Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.46E+106.28E+08NA3.21E+084.81E+084.27E+07Cs-134 3.73E+083.63E+07NA1.86E+072.79E+072.46E+06Cs-137 1.31E+084.58E+07NA2.35E+073.51E+073.10E+06Eu-152 5.81E+101.85E+09NA9.51E+081.42E+091.27E+08Eu-154 5.11E+101.28E+09NA6.55E+089.78E+088.68E+07H-35.58E+082.64E+08NA1.36E+082.03E+081.80E+07Ni-63 1.21E+104.47E+09NA2.30E+093.42E+093.04E+08Sr-901.05E+071.59E+06NA8.14E+051.22E+061.08E+05 BFM Drilling Spoils DCGLs (Not Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.23E+082.42E+082.19E+089.61E+076.61E+079.83E+07Cs-134 5.50E+084.18E+083.67E+081.66E+081.15E+081.69E+08Cs-137 1.07E+099.88E+087.16E+083.93E+082.71E+084.00E+08Eu-152 6.89E+085.21E+084.64E+082.07E+081.43E+082.12E+08Eu-154 6.22E+084.90E+084.19E+081.95E+081.34E+081.99E+08H-32.38E+154.94E+152.38E+166.34E+149.42E+141.53E+16Ni-63 1.07E+141.28E+149.15E+134.96E+132.85E+135.34E+13Sr-905.53E+105.15E+104.55E+102.00E+101.18E+102.14E+10 Basement DCGLB (Not Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal1 TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.20E+081.75E+081.75E+087.40E+075.81E+072.97E+07Cs-134 2.22E+083.34E+073.34E+071.68E+072.24E+072.43E+06 Cs-137 1.17E+084.38E+074.38E+072.22E+073.11E+073.08E+06Eu-152 6.81E+084.07E+084.07E+081.70E+081.30E+087.94E+07Eu-154 6.14E+083.54E+083.54E+081.50E+081.18E+086.04E+07H-35.58E+082.64E+082.64E+081.36E+082.03E+081.80E+07Ni-63 1.21E+104.47E+094.47E+092.30E+093.42E+093.04E+08Sr-901.05E+071.59E+061.59E+068.14E+051.22E+061.08E+05Note 1: DCGLB for SFP/Transfer Canal equal to the lower of the Auxiliary or Containment DCGL which was Containment for all ROC Insignificant Contributor Dose Adjustment Factor Assigned IC Dose PercentageIC Dose Adjustment Factor Auxiliary5.00%0.95Containment10.00%0.90Basements other than Auxiliary and Containment5.00%0.95Adjusted BFM Groundwater DCGLs (Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.28E+105.65E+08NA3.05E+084.57E+084.05E+07Cs-134 3.55E+083.27E+07NA1.77E+072.65E+072.34E+06Cs-137 1.25E+084.12E+07NA2.23E+073.34E+072.95E+06Eu-152 5.52E+101.67E+09NA9.03E+081.35E+091.21E+08Eu-154 4.85E+101.15E+09NA6.22E+089.29E+088.24E+07H-35.30E+082.38E+08NA1.29E+081.93E+081.71E+07Ni-63 1.15E+104.02E+09NA2.18E+093.25E+092.89E+08Sr-909.98E+061.43E+06NA7.74E+051.16E+061.03E+05 Adjusted BFM Drilling Spoils DCGLs (Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.07E+082.18E+082.08E+089.13E+076.28E+079.34E+07Cs-134 5.23E+083.77E+083.49E+081.58E+081.09E+081.61E+08Cs-137 1.02E+098.89E+086.80E+083.73E+082.58E+083.80E+08Eu-152 6.54E+084.69E+084.41E+081.97E+081.36E+082.01E+08Eu-154 5.91E+084.41E+083.98E+081.85E+081.28E+081.89E+08H-32.26E+154.45E+152.26E+166.02E+148.95E+141.45E+16Ni-63 1.02E+141.15E+148.69E+134.71E+132.70E+135.08E+13Sr-905.25E+104.63E+104.32E+101.90E+101.12E+102.03E+10 Adjusted Basement DCGLB (Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal1 TurbineCrib House/ Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.04E+081.57E+081.57E+087.03E+075.52E+072.83E+07Cs-134 2.11E+083.01E+073.01E+071.59E+072.13E+072.31E+06Cs-137 1.11E+083.94E+073.94E+072.11E+072.96E+072.93E+06Eu-152 6.47E+083.66E+083.66E+081.62E+081.23E+087.55E+07Eu-154 5.83E+083.19E+083.19E+081.43E+081.12E+085.74E+07H-35.30E+082.38E+082.38E+081.29E+081.93E+081.71E+07Ni-63 1.15E+104.02E+094.02E+092.18E+093.25E+092.89E+08Sr-909.98E+061.43E+061.43E+067.74E+051.16E+061.03E+05Note 1: DCGL for SFP/Transfer Canal equal to the lower of the Auxiliary or Containment DCGL which was Containment for all ROC.

Drilling Spoils Area Factor Calculation for Class 1 Survey UnitsInputs to CalculationAdjusted BFM Drilling Spoils DCGL (Adjusted for Insignificant Contributor Dose)Auxiliary Spent Fuel Pool/Transfer Canal Containment pCi/m2pCi/m2pCi/m2Co-60 3.07E+082.08E+082.18E+08Cs-134 5.23E+083.49E+083.77E+08Cs-137 1.02E+096.80E+088.89E+08Eu-152 6.54E+084.41E+084.69E+08 Eu-154 5.91E+083.98E+084.41E+08H-32.26E+152.26E+164.45E+15Ni-63 1.02E+148.69E+131.15E+14Sr-905.25E+104.32E+104.63E+10Adjusted Basment DCGL (Adjusted for Insignificant Contributor Dose)Auxiliary Spent Fuel Pool/Transfer Canal ContainmentpCi/m2pCi/m2pCi/m2Co-60 3.04E+081.57E+081.57E+08Cs-134 2.11E+083.01E+073.01E+07Cs-137 1.11E+083.94E+073.94E+07Eu-152 6.47E+083.66E+083.66E+08Eu-154 5.83E+083.19E+083.19E+08H-35.30E+082.38E+082.38E+08Ni-63 1.15E+104.02E+094.02E+09Sr-909.98E+061.43E+061.43E+06 Conversion Factor0.0929m2/ft2Floor Surface Area and Total Surface Area used for DCGL CalculationFloor Area (ft2)Floor Area1 (m2)Total Area Used for DCGL Calculation (m2)Auxiliary Basement2714925227226SFP/Transfer Canal2448227723Containment1648915323482Note 1: Reference TSD 14-021 , Revision 1, Table 2Concentration Corresponding to 25 mrem/yr for Drilling Spoils Only Assuming all Activity in Floor (Adjusted for Insignificant Contributor)Auxiliary Spent Fuel Pool/Transfer Canal ContainmentpCi/m2pCi/m2pCi/m2Co-60 8.78E+086.60E+084.95E+08Cs-134 1.50E+091.11E+098.56E+08Cs-137 2.93E+092.16E+092.02E+09 Eu-152 1.88E+091.40E+091.07E+09Eu-154 1.69E+091.27E+091.00E+09H-36.48E+157.18E+161.01E+16Ni-63 2.91E+142.76E+142.62E+14Sr-901.50E+111.37E+111.05E+11Drilling Spoils Area FactorsAuxiliary Spent Fuel Pool/Transfer Canal ContainmentCo-60 2.89E+004.20E+003.15E+00Cs-134 7.09E+003.69E+012.84E+01Cs-137 2.63E+015.49E+015.13E+01Eu-152 2.90E+003.82E+002.91E+00Eu-154 2.90E+003.97E+003.15E+00H-31.22E+073.02E+084.25E+07Ni-63 2.53E+046.87E+046.51E+04Sr-901.51E+049.60E+047.36E+04

BFM Dose Factors for Initial Suite Radionculides (not adjusted for insignificant contributor dose fraction)BFM Dose Factors for Initial Suite (

Reference:

TSD 14-019, Table 12). RadionuclideAux mrem/year per mCiContainment mrem/year per mCiSpent Fuel mrem/year per mCiTurbine mrem/year per mCiCrib House mrem/year per mCiWWTF mrem/year per mCiAg-108m1.78E-024.61E-021.85E-011.30E-021.77E-021.32E+00Am-2412.58E-011.15E+003.06E-032.86E-012.45E-015.22E+01Am-2432.64E-011.15E+002.51E-022.86E-012.46E-015.22E+01C-146.49E-022.84E-013.72E-067.09E-026.08E-021.29E+01Cm-2432.69E-021.57E-011.56E-023.94E-023.43E-027.09E+00Cm-2441.74E-021.24E-017.09E-043.11E-022.67E-025.66E+00Co-601.08E-024.11E-021.58E-011.25E-022.03E-027.48E-01 Cs-1341.56E-022.15E-019.41E-025.49E-025.25E-029.16E+00Cs-1372.96E-021.64E-014.83E-024.16E-023.79E-027.22E+00Eu-1525.08E-031.76E-027.46E-025.41E-039.07E-032.81E-01Eu-1545.63E-032.03E-028.25E-026.13E-039.97E-033.68E-01Eu-1552.91E-041.37E-034.55E-033.77E-044.64E-044.36E-02Fe-558.09E-071.51E-053.71E-083.78E-063.23E-066.85E-04H-36.21E-032.72E-021.45E-096.80E-035.80E-031.23E+00Nb-941.41E-022.86E-021.79E-018.61E-031.37E-025.55E-01Ni-591.35E-045.87E-041.77E-071.47E-041.26E-042.67E-02Ni-632.86E-041.61E-033.78E-074.01E-043.44E-047.31E-02Np-2374.92E+012.13E+023.53E-025.34E+014.57E+019.73E+03Pm-1473.01E-055.67E-041.56E-061.42E-041.22E-042.59E-02Pu-2382.11E-011.03E+001.11E-032.56E-012.19E-014.66E+01Pu-2392.61E-011.14E+001.23E-032.84E-012.43E-015.18E+01Pu-2402.61E-011.14E+001.22E-032.84E-012.43E-015.18E+01Pu-2414.58E-033.65E-025.85E-059.11E-037.80E-031.66E+00Sb-1251.32E-021.98E-014.11E-024.99E-024.40E-028.82E+00Sr-903.29E-014.51E+007.60E-041.13E+009.67E-012.06E+02Tc-9911.48E-016.44E-011.45E-091.61E-011.38E-012.93E+01Note 1: BFM DF for Tc-99 was reported as zero in TSD 14-019, Table 11. A non-zero value is required for the DCGL calculation. The lowest non-zero DF reported for all nuclides in SFP was conservatively applied to Tc-99.

The nuclide with the lowest SFP DF was H-3 with a value of 1.45E-09 mrem/yr per mCi and was assigned to Tc-99 Drill Spoils Dose Factors for Initial Suite (

Reference:

TSD 14-021)NuclideAux Building Drill Spoils mrem/yr per mCiCTMT Drill Spoils mrem per mCiSFB Drill Spoils mrem/yr per mCiTurbine Drill Spoils mrem/yr per mCiCrib House Drill Spoils mrem/yr per mCiWWTF Drill Spoils mrem/yr per mCiAg-108m1.23E-022.05E-021.85E-016.61E-031.23E-021.57E-01Am-2411.51E-043.14E-043.06E-039.76E-051.49E-042.91E-03Am-2431.58E-032.73E-032.51E-028.75E-041.55E-032.16E-02C-143.08E-074.27E-073.72E-061.42E-073.08E-073.11E-06Cm-2439.93E-041.70E-031.56E-025.47E-049.87E-041.34E-02Cm-2442.55E-056.63E-057.09E-041.97E-052.50E-057.21E-04Co-601.07E-022.97E-021.58E-019.58E-031.78E-022.26E-01Cs-1346.29E-031.72E-029.41E-025.54E-031.02E-021.31E-01Cs-1373.22E-037.27E-034.83E-022.35E-034.34E-035.57E-02Eu-1525.02E-031.38E-027.46E-024.45E-038.24E-031.05E-01Eu-1545.57E-031.46E-028.25E-024.73E-038.77E-031.12E-01Eu-1552.83E-044.95E-044.55E-031.58E-042.77E-043.84E-03Fe-552.97E-094.20E-093.71E-081.39E-092.97E-093.29E-08H-31.45E-091.45E-091.45E-091.45E-091.45E-091.45E-09Nb-941.20E-021.98E-021.79E-016.40E-031.19E-021.52E-01Ni-591.51E-082.04E-081.77E-076.77E-091.50E-081.52E-07Ni-633.23E-085.61E-083.78E-071.86E-084.14E-084.16E-07Np-2372.91E-034.04E-033.53E-021.34E-032.89E-033.01E-02Pm-1479.32E-081.68E-071.56E-065.35E-089.15E-081.35E-06Pu-2383.97E-051.04E-041.11E-033.08E-053.89E-051.13E-03Pu-2394.41E-051.15E-041.23E-033.40E-054.30E-051.25E-03Pu-2404.38E-051.14E-041.22E-033.38E-054.28E-051.24E-03Pu-2412.97E-066.03E-065.85E-051.88E-062.92E-065.56E-05Sb-1252.75E-034.52E-034.11E-021.46E-032.69E-033.45E-02Sr-906.26E-051.39E-047.60E-044.61E-059.96E-051.04E-03Tc-991.45E-091.45E-091.45E-091.45E-091.45E-091.45E-09Note 1: BFM DF for Tc-99 and H-3 were reported as zero in TSD 14-019, Table 11 (except for H-3 in SFP). A non-zero value is required for the DCGL calculation.

The nuclide with the lowest DF was H-3 with a value of 1.45E-09 mrem/yr per mCi which was assigned to Tc-99 and H-3 Survey UnitWall and Floor Surface Area1m2Auxiliary Building 542 Floor and All Walls7226Containment Basement3482SFP/Transfer Canal723Turbine Building Basement27135Crib House/Forebay18254WWTF1124

Reference:

Dose Limit 25mrem/yrConversion Factor1.00E+09pCi/mCi Combined DCGLs for Initial Suite not adjusted for Insignificant Contributor Dose FractionRadionuclideAuxiliary (pCi/m2)Containment pCi/m2Spent Fuel pCi/m2Turbine pCi/m2Crib House pCi/m2WWTF pCi/m2Ag-108m1.94E+081.56E+081.87E+087.09E+077.73E+071.69E+07Am-2411.34E+076.26E+061.13E+103.22E+065.58E+064.26E+05Am-2431.31E+076.26E+061.38E+093.22E+065.56E+064.26E+05C-145.33E+072.53E+079.29E+121.30E+072.25E+071.72E+06Cm-2431.28E+084.57E+072.22E+092.34E+073.99E+073.14E+06Cm-2441.99E+085.78E+074.88E+102.96E+075.13E+073.93E+06Co-603.20E+081.75E+082.19E+087.40E+076.76E+072.97E+07Cs-1342.22E+083.34E+073.67E+081.68E+072.61E+072.43E+06Cs-1371.17E+084.38E+077.16E+082.22E+073.62E+073.08E+06Eu-1526.81E+084.07E+084.64E+081.70E+081.51E+087.90E+07Eu-1546.14E+083.54E+084.19E+081.50E+081.37E+086.05E+07Eu-1551.19E+105.25E+097.60E+092.45E+092.95E+095.10E+08Fe-554.28E+124.77E+119.33E+142.44E+114.25E+113.25E+10H-35.58E+082.64E+082.38E+161.36E+082.36E+081.80E+07Nb-942.46E+082.51E+081.93E+081.07E+089.96E+074.00E+07Ni-592.57E+101.22E+101.95E+146.29E+091.09E+108.33E+08Ni-631.21E+104.47E+099.15E+132.30E+093.98E+093.04E+08Np-2377.04E+043.37E+049.80E+081.73E+043.00E+042.29E+03Pm-1471.15E+111.27E+102.21E+136.49E+091.13E+108.60E+08Pu-2381.64E+077.00E+063.11E+103.60E+066.25E+064.77E+05Pu-2391.32E+076.30E+062.82E+103.24E+065.63E+064.29E+05Pu-2401.33E+076.30E+062.83E+103.24E+065.63E+064.29E+05Pu-2417.56E+081.97E+085.92E+111.01E+081.76E+081.34E+07Sb-1252.63E+083.62E+078.41E+081.85E+073.11E+072.52E+06Sr-901.05E+071.59E+064.55E+108.14E+051.42E+061.08E+05Tc-992.34E+071.11E+072.38E+165.72E+069.95E+067.60E+05 Drilling Spoils DCGLs for Initial Suite not adjusted for Insignificant Contributor Dose FractionRadionuclideAuxiliary (pCi/m2)Containment pCi/m2Spent Fuel pCi/m2Turbine pCi/m2Crib House pCi/m2WWTF pCi/m2Ag-108m2.80E+083.50E+081.87E+081.37E+081.09E+081.42E+08Am-2412.29E+102.28E+101.13E+109.29E+098.98E+097.64E+09Am-2432.19E+092.63E+091.38E+091.04E+098.61E+081.03E+09C-141.12E+131.68E+139.29E+126.40E+124.34E+127.14E+12Cm-2433.49E+094.22E+092.22E+091.66E+091.36E+091.66E+09Cm-2441.36E+111.08E+114.88E+104.61E+105.35E+103.08E+10Co-603.23E+082.42E+082.19E+089.46E+077.51E+079.83E+07Cs-1345.50E+084.18E+083.67E+081.64E+081.31E+081.69E+08Cs-1371.07E+099.88E+087.16E+083.86E+083.08E+084.00E+08Eu-1526.89E+085.21E+084.64E+082.04E+081.62E+082.12E+08Eu-1546.22E+084.90E+084.19E+081.92E+081.53E+081.99E+08Eu-1551.22E+101.45E+107.60E+095.73E+094.83E+095.79E+09Fe-551.16E+151.71E+159.33E+146.54E+144.51E+146.77E+14H-32.38E+154.94E+152.38E+166.23E+149.21E+141.53E+16Nb-942.87E+083.62E+081.93E+081.42E+081.13E+081.47E+08Ni-592.28E+143.51E+141.95E+141.34E+148.90E+131.46E+14Ni-631.07E+141.28E+149.15E+134.88E+133.23E+135.34E+13Np-2371.19E+091.78E+099.80E+086.78E+084.64E+087.38E+08Pm-1473.71E+134.26E+132.21E+131.69E+131.46E+131.65E+13Pu-2388.72E+106.91E+103.11E+102.94E+103.44E+101.96E+10Pu-2397.85E+106.27E+102.82E+102.67E+103.11E+101.78E+10Pu-2407.89E+106.29E+102.83E+102.68E+103.13E+101.79E+10Pu-2411.16E+121.19E+125.92E+114.82E+114.59E+114.00E+11Sb-1251.26E+091.59E+098.41E+086.22E+084.97E+086.45E+08Sr-905.53E+105.15E+104.55E+101.96E+101.34E+102.14E+10Tc-992.38E+154.94E+152.38E+166.23E+149.21E+141.53E+16

Calculation of Penetration DCGLs (pCi/m2) Inputs to CalculationConversion Factor1.00E+09pCi/mCiDose Limit25mrem/yrConversion Factor0.0929m2/ft2Conversion Factor0.0283m3/ft3BFM Groundwater Dose Factors (Not adjusted for insignificant contributor dose)Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/Forebay WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.00E-041.14E-020.00E+002.87E-032.85E-035.21E-01Cs-134 9.27E-031.98E-010.00E+004.94E-024.91E-029.03E+00Cs-137 2.64E-021.57E-010.00E+003.92E-023.90E-027.17E+00Eu-152 5.96E-053.87E-030.00E+009.69E-049.64E-041.75E-01Eu-154 6.77E-055.62E-030.00E+001.41E-031.40E-032.56E-01H-36.21E-032.72E-020.00E+006.80E-036.75E-031.23E+00Ni-63 2.86E-041.61E-030.00E+004.01E-044.00E-047.31E-02Sr-903.29E-014.51E+000.00E+001.13E+001.12E+002.06E+02 BFM Drilling Spoils Dose Factors (

Reference:

TSD 14-021, Table 5) (Not adjusted for insignificant contributor dose)Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/Forebay WWTF(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)(mrem/y per mCi)Co-60 1.07E-022.97E-021.58E-019.58E-032.07E-022.26E-01Cs-134 6.29E-031.72E-029.41E-025.54E-031.19E-021.31E-01Cs-137 3.22E-037.27E-034.83E-022.35E-035.05E-035.57E-02Eu-152 5.02E-031.38E-027.46E-024.45E-039.58E-031.05E-01Eu-154 5.57E-031.46E-028.25E-024.73E-031.02E-021.12E-01H-30.00E+000.00E+001.45E-090.00E+000.00E+000.00E+00Ni-63 3.23E-085.61E-083.78E-071.86E-084.81E-084.16E-07Sr-906.26E-051.39E-047.60E-044.61E-051.16E-041.04E-03Penetration Surface Area (Reference TSD 14-016)BasementSurface Area m2Containment242.36Auxiliary948.75 Turbine1174.41 Crib House/Forebay1.14 SFP/Transfer Canal337.45WWTF0.89 Ratio of Instant Release Groundwater Concentration versus Diffusion Release for Auxiliary Basement DUST Model(

Reference:

BNL Report "Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model, Zion Restortaion Project", Revison 3, Attachment G)Diffusion Release Instant ReleaseConcentration RatiopCi/LpCi/LCo-60 2.89E-087.58E-0726.23Cs-134 7.63E-073.75E-064.91Cs-137 2.74E-063.75E-061.37Eu-152 1.19E-071.78E-0614.96 Eu-154 9.32E-081.78E-0619.1 H-31.01E-031.02E-031.01 Ni-63 2.11E-062.73E-061.29 Sr-902.18E-056.87E-053.15

Penetration DCGL (Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay1 WWTF2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 8.82E+072.26E+094.45E+081.62E+09NANACs-134 3.28E+084.32E+087.48E+083.68E+08NANACs-137 6.17E+085.66E+081.46E+094.87E+08NANAEu-152 3.29E+085.26E+099.44E+083.73E+09NANAEu-154 2.33E+084.58E+098.53E+083.30E+09NANAH-33.99E+093.42E+094.84E+162.98E+09NANANi-63 6.79E+105.78E+101.86E+145.04E+10NANASr-902.41E+072.06E+079.26E+101.79E+07NANANote 1: Crib House/Forebay penentration surface area of 1.14 m2 will be included with Crib House/Forebay surfaces survey unit - surface DCGL will applyNote 2: WWTF penenraton surface area surface area of 0.89 m2 will be included in WWTF surface survey unit - surface DCGL will applyLower Action Level for Remdiation and Grouting Action of Auxiliary Penetration Survey Unit AuxiliarypCi/m2 Co-60 1.16E+07Cs-134 4.30E+07Cs-137 8.11E+07 Eu-152 4.32E+07Eu-154 3.05E+07H-35.24E+08Ni-63 8.91E+09Sr-903.17E+06 Basement Wall/Floor Surface DCGLs ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/Forebay WWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 1.57E+081.57E+087.03E+075.52E+072.83E+07Cs-134 3.01E+073.01E+071.59E+072.13E+072.31E+06Cs-137 3.94E+073.94E+072.11E+072.96E+072.93E+06Eu-152 3.66E+083.66E+081.62E+081.23E+087.55E+07Eu-154 3.19E+083.19E+081.43E+081.12E+085.74E+07H-32.38E+082.38E+081.29E+081.93E+081.71E+07Ni-63 4.02E+094.02E+092.18E+093.25E+092.89E+08Sr-901.43E+061.43E+067.74E+051.16E+061.03E+05 Penetration Remediation and Grouting Action LevelsAux/CTMTAux/SFPAux/TurbineCTMT/SFPSFP/TurbineMinimum Aux, CTMT, SFP, TurbineCo-60 1.16E+071.16E+071.16E+071.57E+087.03E+071.16E+07Cs-134 3.01E+073.01E+071.59E+073.01E+071.59E+071.59E+07Cs-137 3.94E+073.94E+072.11E+073.94E+072.11E+072.11E+07Eu-152 4.32E+074.32E+074.32E+073.66E+081.62E+084.32E+07Eu-154 3.05E+073.05E+073.05E+073.19E+081.43E+083.05E+07H-32.38E+082.38E+081.29E+082.38E+081.29E+081.29E+08Ni-63 4.02E+094.02E+092.18E+094.02E+092.18E+092.18E+09Sr-901.43E+061.43E+067.74E+051.43E+067.74E+057.74E+05

Alternate Scenario Drilling Spoils Dose Assessment for Auxiliary Basement Floor Drains (Resident Farmer)Inputs to CalculationMid-Point of Lower sand unit between 480' and 525' elevation 502.5ft (

Reference:

ZionSolutions Technical Support Document 14-003, Conestoga Rovers & Associates (CRA) Report, "Zion Hydrogeologic Investigation Report")Fill Material Density1.5g/ccConcrete Density2.4g/ccConversion factor28316.85cc/cfConversion factor0.0283m3/cfEnd State Building Well Drilling Parameters for Auxiliary Basement (TSD 14-021, Rev 1, Table 2(1))ParameterAuxiliary Building Ground Surface Elevation ft591.00Water Table Elevation ft579.00Mid-Point Lower Sand Aquifer Elevation ft502.50Vadose Zone Fill Height ft12.00Saturated Zone Fill + Concrete + Soil Heigh 76.508 inch Diameter Borehole Area (ft2)0.35Concrete Cutting Depth inches0.00Concrete Cutting Depth ft0.00Drill Spoils VolumeVadose Zone Fill Volume m30.12Saturared Zone Fill Volume m30.76Concrete Cutting Density Change Corrected Volume m30.00Total Borehole Volume m30.87Spread area m2 @ 0.15 m height5.83 Drilling Spoils Mass(2)Vadose Zone Bore Hole Mass g1.78E+05Saturated Zone Bore Hole Mass g1.13E+06Concrete Cut Mass grams0.00E+00Total Borehole Mass g1.31E+06(1) Well drill parameters from TSD 14-021, Rev 1, Table 2 except drilling assumed to proceed through foundation concrete and drains to the mid-point of the lower sand aquifer (2)The full depth is assumed to have density of 1.5 g.cc which is conservativebecause the borehole would include 5 feet of concrete which has density if 2.4 g/cc.

Auxiliary Basement Floor Drain - Untized Concentration ROCUnitized Concentration(pCi/m2)Co-601.00Cs-1341.00 Cs-1371.00 Ni-631.00Sr-901.00Area of Auxiliary Floor Drain Floor Drain (m2) intersected by 8 inch diameter drillInputs to calculationDrain diameter6inchesDrain radius3inchesconversion factor12inches/ftconversion factor0.0929m2/ft2Drill Diameter8inchesDose Limit25mrem/yrCalculationPipe Area Intersected by 8 inch diameter drill1.05ft2Pipe Area Intersected by 8 inch diamtere drill9.73E-02m2Unitized Inventory in Drill Spoils From Auxiliary Floor DrainROCMean Activity per ROC Concentration in Drilling SpoilspCipCi/gCo-609.73E-027.42E-08Cs-1349.73E-027.42E-08Cs-1379.73E-027.42E-08Ni-639.73E-027.42E-08Sr-909.73E-027.42E-08Alternate Scenario Occupancy Factor50% Auxiliary Basement Floor Drain - Drilling Spoils Untitized Dose Factor (Resident Farmer) ROC Area Factor Adjusted Soil DCGLSOFUnitized Dose Factor pCi/g mrem/yr per pCi/m2 Co-6017.554.23E-095.28E-08Cs-13430.562.43E-093.03E-08Cs-13772.121.03E-091.29E-08Ni-637.00E+061.06E-141.32E-13SA41:D79r-902758.332.69E-113.36E-10 Reproduced from Zion LTP Rev 1, Chapter 5, Table 5-10 Area Factors for Surface SoilsCs-137Co-60Cs-134Ni-63Sr-900.011.50E+031.23E+031.33E+033.31E+058.40E+040.034.98E+024.09E+024.42E+021.76E+053.03E+040.11.50E+021.23E+021.33E+026.92E+048.52E+030.34.98E+014.09E+014.42E+012.57E+042.88E+0311.50E+011.23E+011.33E+018.06E+038.90E+0236.46E+005.24E+005.73E+002.73E+033.13E+02103.06E+002.47E+002.72E+008.23E+021.03E+02302.10E+001.68E+001.86E+002.75E+024.02E+011001.62E+001.29E+001.44E+008.26E+011.64E+013001.46E+001.16E+001.30E+002.75E+016.14E+001,0001.33E+001.08E+001.20E+008.26E+001.88E+003,0001.26E+001.05E+001.16E+004.68E+001.73E+0010,0001.13E+001.02E+001.08E+001.86E+001.33E+0064,5001.00E+001.00E+001.00E+001.00E+001.00E+00Surface Soil DCGLRadionuclideInterpolated (pCi/g)Area FactorsCo-604.26Co-604.12E+00Cs-1346.77Cs-1344.51E+00Cs-13714.18Cs-1375.09E+00Ni-633572.1Ni-631.96E+03Sr-9012.09Sr-902.28E+02Interpolated Area Factors for Auxilary Floor Drains Drilling Spoils Spread AreaReproduced From Zion LTP Rev 1, Chapter 5, Table 5-4 DCGLs for Surface RadionuclideArea (m2)Area Factors for Radionuclides of Concern

Decayed Results32.00yearsCo-60 DecayedCs-134 DecayedCs-137 DecayedNi-63 DecayedSr-90 Decayed(pCi/m2)(pCi/m2)(pCi/m2)(pCi/m2)(pCi/m2)1.94E+040.00E+008.21E+055.28E+055.31E+022.05E+040.00E+008.68E+055.58E+055.61E+022.58E+040.00E+001.09E+067.00E+057.04E+022.66E+040.00E+001.12E+067.23E+057.27E+02 2.85E+040.00E+001.20E+067.73E+057.78E+02 1.13E+050.00E+001.04E+063.07E+066.72E+02 3.50E+040.00E+001.48E+069.50E+059.55E+02 3.61E+040.00E+001.53E+069.82E+059.87E+02 1.28E+050.00E+001.18E+063.48E+067.63E+02 1.29E+050.00E+001.19E+063.51E+067.68E+02 1.30E+050.00E+001.20E+063.54E+067.75E+02 1.37E+050.00E+001.26E+063.72E+068.14E+02 1.41E+050.00E+001.30E+063.83E+068.39E+02 4.09E+040.00E+001.73E+061.11E+061.12E+03 4.33E+040.00E+001.83E+061.18E+061.18E+03 1.53E+050.00E+001.41E+064.17E+069.13E+02 1.60E+050.00E+001.47E+064.35E+069.52E+02 1.71E+050.00E+001.57E+064.65E+061.02E+03 1.72E+050.00E+001.58E+064.68E+061.03E+03 4.98E+040.00E+002.10E+061.35E+061.36E+03 5.05E+040.00E+002.13E+061.37E+061.38E+03 5.73E+040.00E+002.42E+061.56E+061.57E+03 5.81E+040.00E+002.45E+061.58E+061.59E+03 5.91E+040.00E+002.50E+061.61E+061.62E+03 2.08E+050.00E+001.92E+065.67E+061.24E+03 5.28E-083.03E-081.29E-081.32E-133.36E-10Percentile per Measurement mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m22721.000.04%Auxiliary Drain Drilling Spoils Dose (30 year decay after License Termination)Co-60 Cs-134 Cs-137 Ni-63Sr-90TotalCumulative PercentSort Columnmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrmrem/yr1.03E-030.00E+001.06E-027.00E-081.79E-071.16E-020.04%1.16E-021.08E-030.00E+001.12E-027.39E-081.89E-071.22E-020.07%1.22E-021.36E-030.00E+001.40E-029.27E-082.37E-071.53E-020.11%1.53E-021.40E-030.00E+001.44E-029.57E-082.44E-071.58E-020.15%1.58E-021.50E-030.00E+001.55E-021.02E-072.61E-071.70E-020.18%1.70E-025.96E-030.00E+001.34E-024.07E-072.26E-071.93E-020.22%1.93E-021.85E-030.00E+001.90E-021.26E-073.21E-072.08E-020.26%2.08E-021.91E-030.00E+001.96E-021.30E-073.32E-072.15E-020.29%2.15E-026.77E-030.00E+001.52E-024.62E-072.57E-072.19E-020.33%2.19E-026.81E-030.00E+001.53E-024.64E-072.58E-072.21E-020.37%2.21E-026.88E-030.00E+001.54E-024.69E-072.60E-072.23E-020.40%2.23E-027.23E-030.00E+001.62E-024.93E-072.74E-072.34E-020.44%2.34E-027.45E-030.00E+001.67E-025.08E-072.82E-072.41E-020.48%2.41E-022.16E-030.00E+002.22E-021.47E-073.76E-072.44E-020.51%2.44E-022.29E-030.00E+002.35E-021.56E-073.98E-072.58E-020.55%2.58E-028.10E-030.00E+001.82E-025.52E-073.07E-072.63E-020.59%2.63E-028.45E-030.00E+001.89E-025.76E-073.20E-072.74E-020.62%2.74E-029.04E-030.00E+002.02E-026.16E-073.42E-072.93E-020.66%2.93E-029.10E-030.00E+002.04E-026.20E-073.45E-072.95E-020.70%2.95E-022.63E-030.00E+002.70E-021.79E-074.57E-072.96E-020.74%2.96E-022.67E-030.00E+002.74E-021.82E-074.64E-073.01E-020.77%3.01E-023.03E-030.00E+003.11E-022.06E-075.27E-073.42E-020.81%3.42E-023.07E-030.00E+003.16E-022.09E-075.34E-073.46E-020.85%3.46E-023.12E-030.00E+003.21E-022.13E-075.43E-073.52E-020.88%3.52E-021.10E-020.00E+002.47E-027.51E-074.17E-073.57E-020.92%3.57E-02Auxiliary Drains Drilling Spoils Dose Factor

5.61E+061.57E+018.16E+081.53E+085.28E+055.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.61E+061.57E+018.16E+081.53E+085.28E+05 5.73E+061.61E+018.33E+081.56E+085.39E+05 5.77E+061.62E+018.39E+081.57E+085.43E+05 6.05E+061.69E+018.79E+081.64E+085.69E+05 6.27E+061.76E+019.12E+081.70E+085.90E+05 6.43E+061.80E+019.35E+081.75E+086.05E+05 6.45E+061.81E+019.37E+081.75E+086.06E+05 6.47E+061.81E+019.40E+081.76E+086.08E+056.51E+061.82E+019.46E+081.77E+086.12E+056.56E+061.84E+019.53E+081.78E+086.17E+056.57E+061.84E+019.55E+081.79E+086.18E+056.80E+061.91E+019.89E+081.85E+086.40E+05 2.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.19%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.23%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.26%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.30%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.34%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.38%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.41%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.45%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.49%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.52%1.08E+012.96E-014.77E-071.05E+012.02E-051.77E-041.08E+0199.56%1.08E+012.97E-014.78E-071.05E+012.02E-051.77E-041.08E+0199.60%1.08E+013.03E-014.88E-071.07E+012.06E-051.81E-041.10E+0199.63%1.10E+013.05E-014.91E-071.08E+012.08E-051.83E-041.11E+0199.67%1.11E+013.19E-015.14E-071.13E+012.18E-051.91E-041.16E+0199.71%1.16E+013.31E-015.33E-071.17E+012.26E-051.98E-041.21E+0199.74%1.21E+013.40E-015.47E-071.20E+012.32E-052.03E-041.24E+0199.78%1.24E+013.40E-015.48E-071.20E+012.32E-052.04E-041.24E+0199.82%1.24E+013.42E-015.50E-071.21E+012.33E-052.04E-041.24E+0199.85%1.24E+013.44E-015.54E-071.22E+012.34E-052.06E-041.25E+0199.89%1.25E+013.46E-015.58E-071.23E+012.36E-052.07E-041.26E+0199.93%1.26E+013.47E-015.59E-071.23E+012.37E-052.08E-041.26E+0199.96%1.26E+013.59E-015.79E-071.27E+012.45E-052.15E-041.31E+01100.00%1.31E+01Mean2.30mrem/yr75th Percentile2.87mrem/yr95th Percentile9.00mrem/yr99.99th Percentile12.95mrem/yr

Auxiliary Basement Floor Drains Drilling Spoils Worker DoseInputs to CalculationConversion Factor2.54E-02m/inDrilling Spoils Spread Depth0.15mWell Drilling Pipe Diameter8inConversion Factor12in/ftMaximum Auxiliary Floor Drain Diameter6inDrilling Spoils Drain Pipe Only Ground Spread Volume and Area Drillng Spoils Ground Spread Volume Pipe Only3.71E-03m3Drilling Spoils Ground Spread Area Pipe Only (assuming 0.15 spread depth)2.47E-02m2Inputs to Calculation Receptor Distance From Source1mReceptor Height 1mOccupancy80hoursSpoils Ground Area2.47E-02m2 Spoils Ground Radius0.08869mSpoils Ground Depth0.15mVolume3.71E-03m3Density11.57g.ccMass5807.11gramsPipe Area Intersected by 8 inch drill9.73E-02m2Note 1: Spoils all grout or concrete : Density 2/3 of 2.35 g/cc to account for expansion Spoils Source Term for Microshield Calculation of Dose RateCo-60 Cs-134Cs-137Ni-63Sr-90pCi6.62E+051.85E+009.62E+071.80E+076.22E+04Ci6.62E-071.85E-129.62E-051.80E-056.22E-08Insignificant Contributor Dose Contribution10.00%Insignificant Contributor Dose Adjustment Factor1.10Worker Dose Rate and Total Dose Aux Drain Only Drilling SpoilsDose Rate(1)1.10E-02mrem/hrDose9.66E-01mremNote 1: Microshield Analysis Total Dose Rate all Radionuclides

Alternate Scenario Drilling Spoils for Penetrations, Embedded Pipe, and Basement SurfaceInputs to Calulations Radionuclide Half-Life and Decay ConstantNuclideT 1/2 (years)Decay Const y-1Co-605.27E+001.31E-01Cs-1342.06E+003.36E-01Cs-1373.02E+012.30E-02Ni-631.00E+026.92E-03Sr-902.88E+012.41E-02Eu-1521.35E+015.12E-02Eu-1548.80E+007.88E-02H-31.23E+015.63E-02ROC Mixture for Auxiliary Basement (

Reference:

TSD 14-019, Revision 1 Table 20)Percent ActivityNormalized PercentCo-600.91%0.92%Cs-1340.01%0.01%Cs-13774.60%75.32%Ni-6323.48%23.71%Sr-900.05%0.05%ROC Total 99.05%100.00%Insignificant Contributor0.95%Total 100.00%ROC Mixture for Containment (

Reference:

TSD 14-019, Revision 1 Table 20)Percent ActivityNormalized PercentCo-60 4.68%4.72%Cs-134 0.01%0.01%Cs-137 67.58%68.17%Eu-152 0.44%0.44%Eu-154 0.06%0.06% H-30.07%0.07%Ni-63 26.28%26.50%Sr-900.03%0.03%ROC Total Percent Activity99.14%100.00%Insignificant Contributor0.86%Total100.00%

Drilling Spoils Mass Aux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbine2Crib House/ ForebayWWTF Drilling Spoils Mass1 (g)7.27E+053.85E+052.23E+054.59E+058.00E+052.07E+05Note 1: Reference TSD 14-021, Revision 1, Table 2Note 2: Turbine drilling spois mass conservatively based on Steam Tunnel floor elevation and therefore applies to both Turbine and Steam TunnelDrilling Spoils Area Factor1Aux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTF Co-605.159.7612.588.65.0215.45Cs-1345.6310.5813.619.345.4916.71Cs-1376.3411.9215.3410.536.1918.84Eu-1524.99.2711.948.184.7814.67Eu-1544.969.3912.10098.284.8414.8685H-3804.361882.342532.171611.43778.313110.5Ni-632664.966161.128255.25283.22576.5710022.45Sr-90305682.71909.83587.89295.291109.37Note 1: Reference TSD 14-021, Revison 1, Table 4Surface Soil DCGLs Adjusted for Insignificant Contributor DoseSurface Soil DCGL1(pCi/g)Co-604.26Cs-1346.77Cs-13714.18Ni-633572.1Sr-9012.09Note 1: DCGLs adjusted for 10% Insignificant Contributor doseSurface Soil DCGLAdjusted for 10% Insignificant Contributor Dose1(pCi/g)(pCi/g)Eu-15210.79.63Eu-1549.978.97H-345804122Note 1: Surface Soil DCGLs in column 2multiplied by 0.9RadionuclideRadionuclide Drilling Spoils Area Factor Adjusted Surface Soil DCGLROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTFpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gCo-602.19E+014.16E+015.36E+013.66E+012.14E+016.58E+01Cs-1343.81E+017.16E+019.21E+016.32E+013.72E+011.13E+02Cs-1378.99E+011.69E+022.18E+021.49E+028.78E+012.67E+02Eu-1524.72E+018.93E+011.15E+027.88E+014.60E+011.41E+02Eu-1544.45E+018.43E+011.09E+027.43E+014.34E+011.33E+02H-33.32E+067.76E+061.04E+076.64E+063.21E+061.28E+07Ni-639.52E+062.20E+072.95E+071.89E+079.20E+063.58E+07Sr-903.69E+038.25E+031.10E+047.11E+033.57E+031.34E+04 Inputs to calculationpipe diameter8inchespipe radius4inchesconversion factor12inches/ftconversion factor0.0929m2/ft2conversion factor2.54E-02m/inchDose Limit25mrem/yrCalculation Pipe Area Intersected by 8 inch drill1.40ft2Pipe Area Intersected by 8 inch drill0.13m2Pipe Volume Intersected by 8 inch drill6.59E-03m3Note 1: 8 inch pipe diameter provides maximum pipe surface area for all diameters assuming 8 inch diameter drill.Containment IC Sump Drain - Pipe Surface Area Inputs to calculation pipe diameter1.61inchespipe radius0.805inchesconversion factor12inches/ftconversion factor0.0929m2/ft2conversion factor2.54E-02m/inchDose Limit25mrem/yrCalculation Pipe Area Intersected by 8 inch drill0.28ft2 Pipe Area Intersected by 8 inch drill0.03m2Pipe Volume Intersected by 8 inch drill5.37E-05m3Penetration Surface Area Encountered by 8 Inch Diameter Drill1 (maximum value conservatively applied to all penentrations)

Steam Tunnel and Tendon Tunnel Floor Drain - Pipe Surface Area Inputs to Calculation pipe diameter4.026inchespipe radius2.013inchesconversion factor12inches/ftconversion factor0.0929m2/ft2conversion factor0.0254m/inchDose Limit25mrem/yrCalculation Pipe Area Intersected by 8 inch drill0.70ft2Pipe Area Intersected by 8 inch drill0.07m2Pipe Volume Intersected by 8 inch drill8.40E-04m3Turbine Floor Drain - Pipe Surface Area Inputs to calculation pipe diameter7.36inchespipe radius3.68inchesconversion factor12inches/ftconversion factor0.0929m2/ft2conversion factor0.0254m/inchDose Limit25mrem/yrCalculation Pipe Area Intersected by 8 inch drill1.28ft2Pipe Area Intersected by 8 inch drill0.12m2Pipe Volume Intersected by 8 inch drill5.12E-03m3Untized Concentration ROCUnitized Concentration(pCi/m2)Co-601Cs-1341 Cs-1371 Eu-1521Eu-1541H-31Ni-631Sr-901 PENETRATION ALTERNATE SCENARIO DRILLING SPOILS RESIDENT FARMER DOSEROCActivity per ROC pCiCo-600.13Cs-1340.13 Cs-1370.13Eu-1520.13Eu-1540.13H-30.13Ni-630.13Sr-900.13Penetration Maximum Unitized Inventory pCi/g in Drilling SpoilsROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ Forebay1WWTF1pCi/gpCi/gpCi/gpCi/gpCi/gpCi/gCo-601.78E-073.37E-075.82E-072.83E-07NANACs-1341.78E-073.37E-075.82E-072.83E-07NANACs-1371.78E-073.37E-075.82E-072.83E-07NANAEu-1521.78E-073.37E-075.82E-072.83E-07NANAEu-1541.78E-073.37E-075.82E-072.83E-07NANAH-31.78E-073.37E-075.82E-072.83E-07NANANi-631.78E-073.37E-075.82E-072.83E-07NANASr-901.78E-073.37E-075.82E-072.83E-07NANANote 1: No Penetrations in Crib House/Forebay or WWTFAlternate Scenario Small Area Occupancy Factor50% Unitized Dose Factor for PenetrationsROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ Forebay1WWTF1 mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 Co-601.02E-071.01E-071.36E-079.64E-08NANACs-1345.85E-085.88E-087.89E-085.59E-08NANACs-1372.48E-082.49E-083.34E-082.37E-08NANAEu-1524.73E-084.72E-086.32E-084.48E-08NANAEu-1545.01E-085.00E-086.70E-084.75E-08NANAH-36.73E-135.43E-136.97E-135.32E-13NANANi-632.34E-131.91E-132.47E-131.87E-13NANASr-906.05E-105.10E-106.61E-104.97E-10NANAPenetration Unitized Total pCi Inventory in Drill Spoils - Maximum value conservatively applied to all penetrations Penetration DCGLs Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay1 WWTF1pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 8.82E+072.26E+094.45E+081.76E+09NANACs-134 3.28E+084.32E+087.48E+084.00E+08NANACs-137 6.17E+085.66E+081.46E+095.29E+08NANAEu-152 3.29E+085.26E+099.44E+084.06E+09NANAEu-154 2.33E+084.58E+098.53E+083.58E+09NANAH-33.99E+093.42E+094.84E+163.23E+09NANANi-63 6.79E+105.78E+101.86E+145.48E+10NANASr-902.41E+072.06E+079.26E+101.94E+07NANANote 1: No Penetrations in Crib House/Forebay or WWTFMaximum Penetration Drilling Spoils Resident Farmer Dose with 30 year decay Post License Termination30year Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrCo-60 1.34E-027.43E-024.47E-023.18E-02NANACs-134 1.91E-072.30E-046.46E-071.68E-07NANACs-137 6.95E+006.85E+002.35E+016.12E+00NANAEu-152 NA3.59E-02NANANANAEu-154 NA2.21E-03NANANANAH-3NA6.02E-08NANANANANi-63 3.35E-053.31E-058.83E-052.47E-05NANASr-901.12E-045.49E-053.07E-048.50E-05NANASum6.976.9623.546.15NANARelative SOF Assumiung Mixture Represents Activity in Penetrations Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay1 WWTF1SOFSOFSOFSOFSOFSOFCo-60 1.04E-102.09E-112.06E-115.19E-12NANACs-134 3.18E-131.90E-131.39E-132.60E-13NANACs-137 1.22E-091.20E-095.17E-101.42E-09NANAEu-152 NA8.36E-13NANANANAEu-154 NA1.27E-13NANANANAH-3NA2.19E-13NANANANANi-63 3.49E-124.59E-121.27E-154.33E-12NANASr-902.13E-111.34E-115.55E-152.65E-11NANAsum1.35E-091.25E-095.38E-101.46E-09NANA SOF Resulting in 25 mrem/yr from Penentrations Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ Forebay1 WWTF1SOFSOFSOFSOFSOFSOFCo-60 7.70E-021.68E-023.83E-029.66E-03NANACs-134 2.36E-041.53E-042.59E-041.78E-04NANACs-137 9.04E-019.68E-019.61E-019.75E-01NANAEu-152 NA6.71E-04NANANANAEu-154 NA1.02E-04NANANANAH-3NA1.76E-04NANANANANi-63 2.59E-033.68E-032.37E-062.96E-03NANASr-901.58E-021.08E-021.03E-051.81E-02NANAsum1.0011.001.00NANA EMBEDDED PIPE ALTERNATE SCENARIO DRILLING SPOILS RESIDENT FARMER DOSEEmbedded Pipe Maximum Unitized Total pCi Actvity in Drill Spoils Containment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainpCipCipCipCiCo-600.030.070.070.12Cs-1340.030.070.070.12Cs-1370.030.070.070.12Eu-1520.030.070.070.12Eu-1540.030.070.070.12H-30.030.070.070.12Ni-630.030.070.070.12Sr-900.030.070.070.12Embedded Pipe Maximum Unitized Concentration pCi/g in Drilling SpoilsContainment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainpCi/gpCi/gpCi/gpCi/gCo-606.78E-081.42E-071.70E-072.60E-07Cs-1346.78E-081.42E-071.70E-072.60E-07Cs-1376.78E-081.42E-071.70E-072.60E-07Eu-1526.78E-081.42E-071.70E-072.60E-07Eu-1546.78E-081.42E-071.70E-072.60E-07H-36.78E-081.42E-071.70E-072.60E-07Ni-636.78E-081.42E-071.70E-072.60E-07Sr-906.78E-081.42E-071.70E-072.60E-07Drilling Spoils Area Factor Adjusted Soil DCGLContainment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainpCi/gpCi/gpCi/gpCi/gCo-604.16E+013.66E+014.16E+013.66E+01Cs-1347.16E+016.32E+017.16E+016.32E+01Cs-1371.69E+021.49E+021.69E+021.49E+02Eu-1528.93E+017.88E+018.93E+017.88E+01Eu-1548.43E+017.43E+018.43E+017.43E+01H-37.76E+066.64E+067.76E+066.64E+06Ni-632.20E+071.89E+072.20E+071.89E+07Sr-908.25E+037.11E+038.25E+037.11E+03 Alternate Scenario Small Area Occupancy Factor50%Unitized Dose Factor for Embedded PipeROCContainment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor Drain mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 mrem/yr per pCi/m2 Co-602.04E-084.85E-085.10E-088.87E-08Cs-1341.18E-082.81E-082.96E-085.14E-08Cs-1375.01E-091.19E-081.25E-082.18E-08Eu-1529.49E-092.26E-082.37E-084.12E-08Eu-1541.01E-082.39E-082.52E-084.37E-08H-31.09E-132.68E-132.73E-134.89E-13Ni-633.85E-149.42E-149.63E-141.72E-13Sr-901.03E-102.50E-102.57E-104.57E-10Embedded Pipe DCGLsContainment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainpCi/m2pCi/m2pCi/m2pCi/m2Co-60 5.47E+094.07E+101.06E+106.31E+09Cs-134 1.05E+099.22E+092.04E+091.43E+09Cs-137 1.37E+091.22E+102.67E+091.89E+09Eu-152 1.28E+10NA2.48E+10NAEu-154 1.11E+10NA2.16E+10NAH-38.28E+09NA1.61E+10NANi-63 1.40E+111.26E+122.72E+111.96E+11Sr-904.98E+074.48E+089.70E+076.94E+07Maximum Embeded Pipe Drilling Spoils Resident Farmer Dose with 30 year decay30year Containment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor Drainmrem/yrmrem/yrmrem/yrmrem/yrCo-60 3.62E-021.36E-011.76E-013.85E-02Cs-134 8.01E-081.95E-063.90E-075.53E-07Cs-137 3.34E+007.10E+011.62E+012.01E+01Eu-152 1.75E-02NA8.51E-02NAEu-154 1.08E-03NA5.24E-03NAH-32.94E-08NA1.43E-07NANi-63 1.61E-052.86E-047.85E-058.11E-05Sr-902.68E-059.86E-041.30E-042.79E-04Sum3.3971.1616.5120.16 Relative SOF Assuming Fraction Mixture Represents Activity in Embedded Pipe Containment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainSOFSOFSOFSOFCo-60 8.62E-122.25E-134.43E-121.45E-12Cs-134 7.84E-141.13E-144.03E-147.29E-14Cs-137 4.97E-106.18E-112.56E-103.99E-10Eu-152 3.45E-13NA1.77E-13NAEu-154 5.26E-14NA2.70E-14NAH-39.02E-14NA4.64E-14NANi-63 1.89E-121.88E-139.73E-131.21E-12Sr-905.53E-121.15E-122.84E-127.41E-12sum5.14E-106.34E-112.64E-104.09E-10 SOF Resulting in 25 mrem/yr from Embedded Pipe Containment IC Sump DrainSteam Tunnel Floor DrainTendon Tunnel Floor DrainTurbine Floor DrainSOFSOFSOFSOFCo-60 1.68E-023.55E-031.68E-023.55E-03Cs-134 1.53E-041.78E-041.53E-041.78E-04Cs-137 9.68E-019.75E-019.68E-019.75E-01Eu-152 6.71E-04NA6.71E-04NAEu-154 1.02E-04NA1.02E-04NAH-31.76E-04NA1.76E-04NANi-63 3.68E-032.96E-033.68E-032.96E-03Sr-901.08E-021.81E-021.08E-021.81E-02sum1.001.001.001.00 BASEMENT SURFACE ALTERNATE SCENARIO DRILLING SPOILS RESIDENT FARMER DOSEInputs to CalculationDrill Diameter8inchesConversion Factor2.54E-02m/inchSurface Area captured by 8-inch Diameter Drill3.24E-02m2Unitized Surface Activity Concentration1pCi/m2Dose Criteria25mrem/yrBasement Surface Unitized Concentration in Drilling Spoils Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gCo-60 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Cs-134 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Cs-137 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Eu-152 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Eu-154 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07H-34.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Ni-63 4.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Sr-904.46E-088.42E-081.45E-077.07E-084.05E-081.57E-07Alternate Scenario Small Area Occupancy Factor50%Unitized Dose Factor Basement Surface Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFmrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2mrem/yr per pCi/m2Co-60 2.54E-082.53E-083.39E-082.41E-082.37E-082.98E-08Cs-134 1.46E-081.47E-081.97E-081.40E-081.36E-081.73E-08Cs-137 6.20E-096.23E-098.36E-095.91E-095.77E-097.33E-09Eu-152 1.18E-081.18E-081.58E-081.12E-081.10E-081.39E-08Eu-154 1.25E-081.25E-081.67E-081.19E-081.17E-081.47E-08H-31.68E-131.36E-131.74E-131.33E-131.58E-131.53E-13Ni-63 5.86E-144.78E-146.16E-144.68E-145.51E-145.47E-14Sr-901.51E-101.28E-101.65E-101.24E-101.42E-101.46E-10 Basement Surface DCGLs (Adjusted for Insignificant Contributor Dose) Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFpCi/m2pCi/m2pCi/m2pCi/m2pCi/m2pCi/m2Co-60 3.04E+081.57E+081.57E+087.03E+075.52E+072.83E+07Cs-134 2.11E+083.01E+073.01E+071.59E+072.13E+072.31E+06Cs-137 1.11E+083.94E+073.94E+072.11E+072.96E+072.93E+06Eu-152 6.47E+083.66E+083.66E+081.62E+081.23E+087.55E+07Eu-154 5.83E+083.19E+083.19E+081.43E+081.12E+085.74E+07H-35.30E+082.38E+082.38E+081.29E+081.93E+081.71E+07Ni-63 1.15E+104.02E+094.02E+092.18E+093.25E+092.89E+08Sr-909.98E+061.43E+061.43E+067.74E+051.16E+061.03E+0530year Auxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrmrem/yrCo-60 6.55E-041.29E-033.07E-041.17E-041.61E-042.00E-05Cs-134 9.36E-092.86E-094.43E-091.68E-092.29E-092.89E-10Cs-137 3.41E-011.19E-011.61E-016.10E-028.34E-021.05E-02Eu-152 NA6.24E-04NANANANAEu-154 NA3.84E-05NANANANAH-3NA1.05E-09NANANANANi-63 1.64E-065.76E-076.06E-072.46E-074.05E-074.00E-08Sr-905.49E-069.55E-072.11E-068.47E-071.36E-061.38E-07SUM0.340.120.160.060.080.01Maximum Alternate Scenario Drilling Spoils Resdent Farmer Dose Basement Surface (30 year decay)Relative SOF Assuming Mixture Fraction Represents Activity on Basement SurfaceAuxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFSOFSOFSOFSOFSOFSOFCo-60 3.02E-113.00E-105.83E-111.30E-101.66E-103.24E-10Cs-134 4.93E-132.73127E-123.46E-126.54E-124.88E-124.51E-11Cs-137 6.78E-091.73089E-081.91E-083.58E-082.55E-082.57E-07Eu-152 NA1.20041E-11NANANANAEu-154 NA1.83156E-12NANANANAH-3NA3.13951E-12NANANANANi-63 2.06E-116.58818E-115.89E-111.09E-107.29E-118.20E-10Sr-905.16E-111.92688E-103.59E-106.65E-104.44E-105.02E-09SUM6.88E-091.79E-081.96E-083.67E-082.62E-082.64E-07 SOF Resulting in 25 mrem/yr from Basement SurfacesAuxiliary ContainmentSpent Fuel Pool/Transfer Canal TurbineCrib House/ ForebayWWTFSOFSOFSOFSOFSOFSOFCo-60 4.38E-031.68E-022.97E-033.55E-036.34E-031.23E-03Cs-134 7.16E-051.53E-041.76E-041.78E-041.87E-041.71E-04Cs-137 9.85E-019.68E-019.76E-019.75E-019.74E-019.76E-01Eu-152 NA6.71E-04NANANANAEu-154 NA1.02E-04NANANANAH-3NA1.76E-04NANANANANi-63 2.99E-033.68E-033.01E-032.96E-032.78E-033.11E-03Sr-907.49E-031.08E-021.83E-021.81E-021.70E-021.90E-02SUM1.001.001.001.001.001.00 ALTERNATE DRILLING SPOILS SCENARIO WORKER DOSEPENETRATION SOURCE TERM Inputs to Calculation Exposure Time80hoursDensity11.57g.ccDrilling Spoils spread depth0.15mNote 1: Spoils assumed to be concrete: Density 2/3 of 2.35 g/cc to account for expansionPenetration: Maximum Hypothetical Activity Captured by DrillROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTFpCipCipCipCipCipCiCo-608.81E+054.91E+062.21E+062.21E+06NANACs-1341.00E+048.56E+032.51E+049.24E+03NANACs-1377.24E+077.10E+071.82E+086.69E+07NANAEu-152NA4.58E+05NANANANAEu-154NA6.09E+04NANANANAH-3NA7.78E+04NANANANANi-632.28E+072.76E+075.72E+072.10E+07NANASr-904.95E+042.87E+041.24E+054.57E+04NANAPenentration Drilling Spoils Volume and Spread AreaDrilling Spoils Volume16.59E-03m3Penetration Drilling Spoils Spread Area assuming 0.15 m spread depth4.39E-02m2Note 1: Volume calculation assumes mixing limited to penetration volume captured by drillEMBEDDED PIPE SOURCE TERMEmbedded Pipe: Maximum Hypothetical Activity Captured by DrillContainment IC Sump Drain (pCi)Steam Tunnel Floor Drain (pCi)Tendon Tunnel Floor Drain (pCi)Turbine Floor Drain (pCi)Co-60 2.40E+069.44E+061.17E+072.67E+06Cs-134 4.18E+031.07E+052.03E+043.04E+04Cs-137 3.46E+077.76E+081.69E+082.20E+08Eu-152 2.23E+05NA1.09E+06NAEu-154 2.97E+04NA1.44E+05NAH-33.80E+04NA1.85E+05NANi-63 1.35E+072.44E+086.55E+076.92E+07Sr-901.40E+045.30E+056.82E+041.50E+05Embedded Pipe Drilling Spoils Volume and Spread AreaContainment IC Sump Drain Steam Tunnel Floor Drain Tendon Tunnel Floor Drain Turbine Floor Drain Volume1 (m3)5.37E-058.40E-048.40E-045.12E-03Spread Area (m2)3.58E-045.60E-035.60E-033.42E-02Note 1: Volume calculation assumes mixing limited to embedded pipe volume captured by drill BASEMENT SURFACE SOURCE TERMBasement Surface: Maximum Hypothetical Activity Captured by DrillROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTFpCipCipCipCipCipCiCo-604.32E+048.55E+041.52E+048.10E+031.14E+041.13E+03Cs-1344.91E+021.49E+021.72E+029.21E+011.29E+021.28E+01Cs-1373.55E+061.24E+061.25E+066.66E+059.33E+059.26E+04Eu-152NA7.97E+03NANANANAEu-154NA1.06E+03NANANANAH-3NA1.35E+03NANANANANi-631.12E+064.81E+053.92E+052.10E+052.94E+052.92E+04Sr-902.42E+035.00E+028.51E+024.55E+026.38E+026.33E+01Basement Surface: Drilling Spoils Volume and Spread AreaDrilling Spoils Volume1,24.12E-04m3Penetration Drilling Spoils Spread Area assuming 0.15 m spread depth2.75E-03m2Note 1: Volume calculation assumes mixing limited to basement surface volume captured by drillNote 2: Drill depth into concrete surface assumed to be 0.5inch30yearsMax Activity (pCi)30 year Decay (pCi)30 year Decay (Ci)1Co-60 1.17E+072.26E+052.26E-07Cs-134 1.07E+054.54E+004.54E-12Cs-137 7.76E+083.89E+083.89E-04Eu-152 1.09E+062.34E+052.34E-07Eu-154 1.44E+051.36E+041.36E-08H-31.85E+053.41E+043.41E-08Ni-63 2.44E+081.98E+081.98E-04Sr-905.30E+052.57E+052.57E-074.39E-02m23.58E-04m2Note 1: Conversion Factor 1.00E-12Ci/pCi Insignificant Contributor Dose Contribution10.00%Insignificant Contributor Dose Adjustment Factor1.10 Alternate Drilling Spoils Scenario Worker Dose (adjusted for Insignificant Contributor Dose) Microshield Dose Rate (mR/hr)Worker Dose1 (mrem/yr)Worker Dose Adjusted for IC (mrem/yr) Maximum Spread Area4.190E-023.35E+003.69E+00Minimum Spread Area5.216E-024.17E+004.59E+00 Note 1: 80 hour9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> worker exposure time Maximum Individual ROC Activity in Penetration, Embedded Pipe and Basement Surface Drilling Spoils (with 30 year Decay)Maximum Penetration, Embedded Pipe or Basement Surface Drilling Spoils Spread AreaMinimum Penetration, Embedded Pipe or Basement Surface Drilling Spoils Spread AreaMaximum Source Term Activity for Each ROC based on Radionuclide Mixture (with 30 year Decay) and Spread Area for use in Bounding Microshield Calculation for Worker Dose ALTERNATE DRILLING SPOILS SCENARIO WORKER DOSE INDIVIDUAL ROC AT DCGL CONCENTRATIONS PENETRATION SOURCE TERM Inputs to Calculation Exposure Time80hoursDensity11.57g.ccDrilling Spoils spread depth0.15mNote 1: Spoils assumed to be concrete: Density 2/3 of 2.35 g/cc to account for expansion Penetration: Activity Captured by Drill Assuming Each ROC at DCGLROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTFpCipCipCipCipCiCo-601.14E+072.93E+085.77E+072.29E+08NANACs-1344.25E+075.61E+079.70E+075.19E+07NANACs-1378.01E+077.34E+071.89E+086.86E+07NANAEu-152NA6.83E+08NANANANAEu-154NA5.94E+08NANANANAH-3NA4.43E+08NANANANANi-638.81E+097.50E+092.42E+137.10E+09NANASr-903.13E+062.67E+061.20E+102.52E+06NANA Penentration Drilling Spoils Volume and Spread AreaDrilling Spoils Volume16.59E-03m3Penetration Drilling Spoils Spread Area assuming 0.15 m spread depth4.39E-02m2Note 1: Volume calculation assumes mixing limited to penetration volume captured by drill EMBEDDED PIPE SOURCE TERMEmbedded Pipe: Activity Captured by Drill Assuming Each ROC at DCGLContainment IC Sump Drain (pCi)Steam Tunnel Floor Drain (pCi)Tendon Tunnel Floor Drain (pCi)Turbine Floor Drain (pCi)Co-60 1.43E+082.66E+096.95E+087.52E+08Cs-134 2.74E+076.02E+081.33E+081.70E+08Cs-137 3.58E+077.96E+081.74E+082.25E+08 Eu-152 3.33E+08NA1.62E+09NA Eu-154 2.90E+08NA1.41E+09NAH-32.16E+08NA1.05E+09NA Ni-63 3.66E+098.24E+101.78E+102.33E+10Sr-901.30E+062.92E+076.33E+068.28E+06Embedded Pipe Drilling Spoils Volume and Spread AreaContainment IC Sump Drain Steam Tunnel Floor Drain Tendon Tunnel Floor Drain Turbine Floor Drain Volume1 (m3)5.37E-058.40E-048.40E-045.12E-03Spread Area (m2)3.58E-045.60E-035.60E-033.42E-02BASEMENT SURFACE SOURCE TERMBasement Surface: Activity Captured by Drill Assuming Each ROC at DCGLROCAux Rx Bld CTMTSpent Fuel Pool/ Transfer CanalsTurbineCrib House/ ForebayWWTFpCipCipCipCipCipCiCo-609.85E+065.10E+065.10E+062.28E+061.79E+069.16E+05Cs-1346.85E+069.76E+059.76E+055.17E+056.92E+057.48E+04Cs-1373.60E+061.28E+061.28E+066.83E+059.58E+059.49E+04Eu-152NA1.19E+07NANANANAEu-154NA1.03E+07NANANANAH-3NA7.71E+06NANANANANi-633.73E+081.30E+081.30E+087.07E+071.05E+089.37E+06Sr-903.24E+054.64E+044.64E+042.51E+043.75E+043.33E+03Basement Surface: Drilling Spoils Volume and Spread AreaDrilling Spoils Volume1,24.12E-04m3Penetration Drilling Spoils Spread Area assuming 0.15 m spread depth2.75E-03m2Note 1: Volume calculation assumes mixing limited to basement surface volume captured by drillNote 2: Drill depth into concrete surface assumed to 0.5inch 30yearsMaximum Individual ROC Activity in Penetration and Embedded Pipe Drilling Spoils ( with 30 year Decay)Max Activity (pCi)30 year Decay (pCi)30 year Decay (Ci)1Co-60 2.66E+095.14E+075.14E-05Cs-134 6.02E+082.55E+042.55E-08Cs-137 7.96E+083.99E+083.99E-04Eu-152 1.62E+093.49E+083.49E-04Eu-154 1.41E+091.33E+081.33E-04H-31.05E+091.94E+081.94E-04Ni-63 2.42E+131.96E+131.96E+01Sr-901.20E+105.84E+095.84E-034.39E-02m23.58E-04m2Note 1: Conversion Factor 1E-12Ci/pCiMaximum Alternate Drilling Spoils Scenario Worker Dose for Individual ROC Assuming ROC Activity at DCGL Concentrations ROCMicroshield Dose Rate (mR/hr)Worker Dose1 (mrem/yr)Microshield Dose Rate (mR/hr)Worker Dose1 (mrem/yr)Co-60 2.451E-021.962.983E-022.39Cs-134 8.174E-066.54E-041.010E-058.08E-04Cs-137 4.679E-023.745.820E-024.66Eu-152 7.503E-026.009.510E-027.61Eu-154 3.350E-022.684.160E-023.33H-320.000E+0000.000E+000.00Ni-632 0.000E+0000.000E+000.00Sr-9020.000E+0000.000E+000.00Note 1: 80 hour9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> worker exposure timeNote 2: No gamma emmission therefore zero external dose and zero worker dose Microshield Dose Rate (mR/hr)Worker Dose1 (mrem/yr)Maximum Spread Area7.50E-026.00E+00Minimum Spread Area9.51E-027.61E+00Maximum Penetration, Embedded Pipe or Basement Surface Drilling Spoils Spread AreaMinimum Penetration, Embedded Pipe or Basement Surface Drilling Spoils Spread AreaMaximum Drilling Spoils Worker Dose from All Individual ROC at DCGL Concentrations Considering all Penetrations, Embedded Pipe and Basement SurfacesMaximum Source Term Activity for each ROC Based on Activity at Individual ROC DCGL (with 30 year decay) and Spread Area for use in Microshield Calculation for Worker Dose Assuming Maximum Spread Area Minimum Spread Area