-"*,-*- WI Commonweal9dison Dresden ~uclear Power Station Jt.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 BBS Ltr *. 1179-488 June 15, 1979 James G. Keppler, R~gional Director Directorate of :~-~g_aj.i:!~-~~y: *Operations - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137.
Reportable Occurrence Report /179-041-03L-0, Docket II 050-237 is hereby submitted to your office ~n accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(b), conditions leading to operation in a degraded mode permi-tted by a limiting condition for operation or plant shutdown required by a limiting condition for operation.
~-B. B. Stephenson 1. Superintendent Dresden Nuclear Power Station BBS/Kroh.
Enclosure.
CC:
Director of Inspection & Enforcement Director of Management Information & Program Contr.ol File/NRC RETURN TO REACTOR DOCKET Fl~ '1 D ~ Li D f~f2_.,.-
. *,*~ 1 9 1979
~
J*.i111.J ru. ~1~*1..JUU rr-n1 alC~i\\!SEE EVEl\\lT REPORT
~-..
F'
--~
w
... * ***cb'"Nnw!... st.ocK: Ll~ _ _ _
0.
. (PLEAsE PRINT oR TYPE,ALL Rrnu1REo.1N:=oRMAT10N1 1
6 rn I I IL ID IR Is iUQI ol 0 I-I ol ol ol ol 0 I - I 0 I 0101 4 I 1 I 1I1 I 110LL-10 7
8 9
LICENSEE CODE 14 15 LICENSE NUMUER 25
- >6 LICENSE TYPE
- JO 57 CAl 58 CON'T
"[ill]
- ~~~~~ LIJ© I o I s I o I o I o I 2 h* 17 101 a I 6 I a I 6 I 1 I 9 101 a I 6 I 1 I s I 1 I 9~-+@---
74
8 60 61 DOCKET l~UMBE.Fl 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
~l_D_u~r_i_n~g"--n_o_rm a_l_u_n_i_t_o_p..__e_r_a_t_i_o_n_t_h_e __
2B __
r_e_c_i_r_c_M_G __
s_e_t_._f_i_e_l_d_c_i_*rcuit breaker tripped open.
~]
In accordance with Tech Spec.. 3.-6.H4 *the *speed *of the -remaining. r-ecirc pump was l))IJ I immediately reduced to less than 65%.
This event has minimal safety significance I
I
((ill.__s_i_n_c_e_t_h_e __
2_A_r_e_c_i_r_c_p_u_m_p_r_e_m_a_i_n_e_d_o_p_e_r_a_t_i_n_g_. _N_o_p_r_e_v_i_o_u_s_o_c_c_u_r_r_e_n_c_e_s_o_f_t_h_i_s_n_a_t_u_r_e __ _,I [TI[) Lhave been reported.
"[ill].-.___----------~-------'---------------,----,-------'
[9))]_.__ ____________...,...--~------------------,------~
7 6 9 80 SYSTEM CODE l c I BI@
9 10 c:::-._
LE R/RO CV ENT YE.A.A
- ~ REPORT I 7 j 9 I NUMBER
CAUSE
CAUSE CODE SUBCODE COMPONENT CODE W@ LU@ I T ! N I s I T I R I u 1@
11 12 13 18 SEQUENTIAL OCCURRENCE REPORT rw_
CODE
'-=J J o I 411 I J /I Io I 3 I 23 24 26 27 28 29 COMP.
VALVE SUB CODE SUB CODE
~@-~
.. J@
19 20.* *,
REPORT TYPE L!J 30 31 REVISIO~J NO.
lQ.J 32 ACTION FUTURE TAKEN ACTION EFFECT
. ON PLANT SHUTDOWN METHOD r:;::;...
ATTACHMENT HOURS ~ SUBMITTED NPRD*4 FORM :SUB.
PRIME C.OMP.
SUPF'IJER COf>.~PCrJENT MANUFACTURER W@W@.LJJ@.LLJ@.lo I ol 11 sl L~J@
33 34 35 36 3.7 40 41 w lEJ@
IH 11 ! s I 71@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
42
. 43 44 47
~- I Cause was the field circuit breaker tripping open due to failure of potential ITDJ I transformer in vol:tage regu-lator circuit.
Faulty transformer was replaced. and the IJJ]1.l pump restarted satisfactorily~
No.. additional corrective -action necessary due to
- I CII1J singular occurrence.
7 s
9 FACILITY STATUS f:30\\. METHOD OF A
80 [ill] Ll_l@
% POWER
.OTHER STATUS ~.OISCOVE;RY DISCOVERY DESCRIPTION ~
J 0 I 9 I 6 l@._l _N_._/_A _____ ___.I
- LA_J@)._I _Op._e_r_a_t_o_r_O_b_s_e_r_v_a t_i_* o_n _______ ~
8 9
ACTIVITY 10 12 11 44 45 46
~nm
~
Q BC RELEASED OF RELEASE AMOUNT OF ACTl\\llTY ~
LOCATION OF RELEASE
N...;.../ A ________ ____,J J.__N_/ A ____________ __..I 7
8 9
10 11 44 45 80 PERSONNEL EXPOSURES r::>.
NUMUER A
TYPE DESCnlPTION
~
Lil o I oJLi.J@LNI"'-"-----------'------------------"
8 9
11 12
. 13 PERSONNEL INJUFliES Q
NUMUEn DESCRIPTION6 q /
<"\\ 0. }
80 [iliJ -I 0 I 0 I 0 l@I
. Nf A '] 0 lP h ;). 0 a'-- I 7
8 9
11
~12---..----'-"'-"---'---=~--"_._---------------~----------~--'BO LOSS OF on DAMAGE TO FACILITY 143' TYPE DESCf11PTIOr~
~
~@[
N/A 9
10 80 PUBLICITY Q
ISSUEOt::;:;\\ DESCfllPTION ~
NRC LISE ONLY LYJ6l N/ A Ul_Ll_J I I I I I I I ~-
n
~10-,--~----~-------~_,.....---~---~_,.....-.._
~~68 69
.. **~ ;...-:. '......
- NAM r or PnF. r 1, RE 1~ ___
J_o_h_n_D_u_n_ba r PHOi<JE:
489 SU* 0:
0 D-..
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000237/LER-1979-001-03, /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | | | 05000237/LER-1979-001, Forwards LER 79-001/03X-1 | Forwards LER 79-001/03X-1 | | | 05000010/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000010/LER-1979-001-03, /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | | | 05000010/LER-1979-002-03, /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | | | 05000010/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000237/LER-1979-002, Forwards LER 79-002/01X-1 | Forwards LER 79-002/01X-1 | | | 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | | | 05000237/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000237/LER-1979-003-03, /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | | | 05000237/LER-1979-004-03, /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | | | 05000237/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000237/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000237/LER-1979-005-03, /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | | | 05000237/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000237/LER-1979-008-03, /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | | | 05000237/LER-1979-009-03, /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | | | 05000237/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000237/LER-1979-010-01, /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | | | 05000237/LER-1979-010, Forwards LER 79-010/01T-0 | Forwards LER 79-010/01T-0 | | | 05000237/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000237/LER-1979-013-03, /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | | | 05000237/LER-1979-014-03, /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | | | 05000237/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000237/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000237/LER-1979-016, Forwards LER 79-016/01T-0 | Forwards LER 79-016/01T-0 | | | 05000237/LER-1979-017-01, X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Saf | X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Safety Feature Sys | | | 05000237/LER-1979-017, Forwards LER 79-017/01T-0 | Forwards LER 79-017/01T-0 | | | 05000237/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000237/LER-1979-020-03, /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | | | 05000249/LER-1979-021-03, /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | | | 05000237/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000237/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000237/LER-1979-023-03, /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | | | 05000249/LER-1979-023-03, /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | | | 05000237/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000237/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000249/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000237/LER-1979-027-03, /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | | | 05000237/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000249/LER-1979-027-03, /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | | | 05000237/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000237/LER-1979-028-03, /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | | | 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | | | 05000237/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000249/LER-1979-030-03, During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | | | 05000249/LER-1979-030, /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | | | 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | | | 05000237/LER-1979-031, Forwards LER 79-031/03L-0 | Forwards LER 79-031/03L-0 | | | 05000237/LER-1979-032, Forwards LER 79-032/03L-0 | Forwards LER 79-032/03L-0 | |
|