ML17139C420
| ML17139C420 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/14/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17139C421 | List: |
| References | |
| NUDOCS 8406010099 | |
| Download: ML17139C420 (6) | |
Text
gP% REOI c>
C~
~o Cy 'Eo Cl pg fk*4(k UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 PENNSYLVANIA POWER AND LIGHT COMPANY LL GHENY ELE RI C
PER V,
IN.
D CKET N
. 50-3 5IIE E
AN A S~l.
C IDM.
I AMENDMENT TO F CILITY OPER TING LICENSE Amendment No.
License No. NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The applications for amendments filed by the Pennsylvania Power and Light Company, dated June 27, 1983 and December 9,
- 1983, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to paragraphs 2.C.(2), 2.C.(28)(b) and 2.D of the Facility Operating License No.
NPF-14 to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 22
, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(28)(b)
S ecial Low Power Testinq and Trainin (DELETED)
SOO60<00e9 SO0S<O PDR ADQCK '05000387
'P
.PDR
II l
'h j
W D.
PPSL shall fully implement and maintain in effect all provisions of the Commission approved physical security, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to the authority of 10 CFR 50.54(p).
The approved
- plans, which contain Safeguards Information as described in 10 CFR 73.21, are collectively entitled:
"Susquehanna Steam Electric Station Physical Security Plan",
Change A, dated July 31, 1978 (transmittal letter dated July 31, 1978);
Change B, dated February 15, 1979 (transmittal letter dated February 15, 1979);
Change C, dated August 15, 1979 (transmittal letter dated August 23, 1979);
Change D, dated September 28, 1979 (transmittal letter dated October 8, 1979);
Change E, dated May 22, 1980 (transmittal letter dated July 11, 1980);
Change F, dated March 27, 1981 (transmittal letter dated April 8, 1981);
Change G, Safeguards Contingency Plan Chapter ll) dated May 29, 1981 (transmittal letter dated June 5, 1981);
Change H, (Safeguards Contingency Plan Chapter ll), dated June 26, 1981 (transmittal letter dated June 29, 1981);
Change I, dated March 19, 1982 (transmittal letter dated March 26, 1981);
Change J, dated April 1, 1982 (transmittal letter dated April 23, 1982);
Change K, dated May 4, 1982 (transmittal letter dated May 5, 1982);
Change L, dated July 9, 1982 (transmittal letter dated July 13, 1982);
Change M, dated October 15, 1982 (transmittal letter dated October 25, 1982);
Change N, dated April 25, 1983 (transmittal letter dated May 6, 1983);
Change 0, dated June 15, 1983 (transmittal letter dated June 16, 1983);
Change P, dated June 27, 1983 (transmittal letter dated July 17, 1983);
and "Susquehanna Security Training and gualification Plan",
Change A, dated August 26, 1981 (transmittal letter dated September 1, 1981);
Change B, dated February 3, 1983 (transmittal letter dated February 11, 1983).'.
This amendment is effective as of the date of issuance.
fOR THE NUCLEAR REGULATORY COMMISSION MAV-,14;-$84;:,.;-:
Date of Issuance:
,Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation hl I
Ih I I
I P.
t I
If It I
>l, 'ttt6
D.
PP8L shall fully implement and maintain in effect all provisions of the Commission approved physical security, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to the authority of 10 CFR 50.54(p).
The approved
- plans, which contain Safeguards Information as described in 10 CFR 73.21, are collectively entitled:
"Susquehanna Steam Electric Station Physical Security Plan",
Change A, dated July 31, 1978 (transmittal letter dated July 31, 1978);
Change 8, dated February 15, 1979 (transmittal letter dated February 15, 1979);
Change C, dated August 15, 1979 (transmittal letter dated August 23, 1979);
Change D, dated September 28, 1979 (transmittal letter dated October 8, 1979);
Change E, dated Hay 22, 1980 (transmittal letter dated July 11, 1980);
Change F, dated March 27, 1981 (transmittal letter dated April 8, 1981);
Change G, Safeguards Contingency Plan Chapter
- 11) dated Hay 29, 1981 (transmittal letter dated June 5, 1981);
Change H, (Safeguards Contingency Plan Chapter 11), dated June 26, 1981 (transmittal letter dated June 29, 1981);
Change I, dated March 19, 1982 (transmittal letter dated March 26, 1981);
Change J; dated April 1, 1982 (transmittal letter dated April 23, 1982);
Change K, dated Hay 4, 1982 (transmittal, letter dated Hay 5, 1982)
Change L,
dated July 9, 1982 (transmittal'letter dated July,13, 1982);
Change H, dated October 15, 1982 (transmittal letter dated October 25, 1982)
Change N, dated April 25, 1983 (transmittal letter dated Hay 6,, 1983);
Change 0, dated June 15, 1983 (transmittal letter, dated June 16, 1983);
Change P, dated June 27, 1983 (transmittal letter. dated July 17, 1983);
and "Susquehanna Security Training and gualification Plan",
Change A, dated August 26, 1981 (transmittal letter dated September 1, 1981);
Change B, dated:February 3,
1983 (transmittal letter dated Febru'ary ll, 1983).
3.
This amendment is effective as of the date of issuance.
FOR TKE NUCLEAR REGULATORY COMMISSION Original Signed by
~
~
~
~
~
~
Robert, A. Purple Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:
MAY 14 584 I
DL:LB@/P DL:lgg2/LA DL. B&2/BC RLPercVT<w E/ton ASchwencer 4/ 4./84 4f~Ip/84
. 4igi84 OLD L
N58~18f T
ovak 4/gp784
/
84 DL:DIR DGEisenhut
$/ te/84
li I'
l I
i.
4 I
I
/IT