Forwards IE Insp Rept 50-387/79-23 on 790620-22,0702-03, 05-06 & 09.No Noncompliance Noted
ML17138A855
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/23/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138A856 List:
References
NUDOCS 7910160361
Download: ML17138A855 (2)


See also: IR 05000387/1979023

Text

JAIL

6P,II R6cy~

(4

0

Cy

0p

I

p

~O

++*++

Docket

No. 50-387

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

6SI PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIAI 9406

~05 23 jS>S

Pennsylvania

Power

5 Light Company

ATTN:,. Mr. Norman

W. Curtis

Vice President

Eng1neering

and Construction

(N-4)

2 North Ninth Street

Allentown,

PA

18101

Gentlemen:

Subject:

Inspection 50-387/79-23

This refers to the inspection

conducted

by Mr; A. Finkel of this office on June

20-22;, July 2-3 and 5-6; and July 9,

1979 at Susquehanna.

Steam, Electric Stat1on,

Unit 1, Berwick, Pennsylvania

of. act1vit1es

authorized

by

NRC L1cense

No.

CPPR-

101

and to the discussions

of our f1ndings held by Mr. Finkel with Mr. J.

D.

Green of your staff at the conclusion of the inspection.

Areas

exam1ned

during this inspection are descr1bed

1n the Off1ce of Inspect1on

and Enforcement Inspection

Report which 1s enclosed with th1s .letter.

Within

these. areas,, the inspection cons1sted'f

selective

examinations

of procedures

and representative

records,

interviews w1th personnel,

and observations

by the

inspector.

Within the scope

of. this inspect1on,

no items of noncompliance

were observed.

In accordance

with Sect1on.2.790

of the NRC's "Rules of Pract1ce",

Part 2, Title

10,

Code of Federal

Regulations,

a copy of th1s letter and the enclosed

1nspection=

report w111

be placed in the NRC's Publ1c

Document

Room.

If th1s report contains

any 1nformat1on that you (or your contractor)

believe to be proprietary, 1t is

necessary

that .you make

a wr1tten appl1cation

w1th1n

20 days to this office to

withhold"such .1nformat1on from publ1c disclosure.'ny

such applicat1on

must be

accompan1ed

by an, aff1davit executed

by the owner of the information, wh1ch

identifies the document or. part sought to be withheld,

and which contains

a

statement of reasons

whi'ch addresses

w1th specif1city the 1tems

wh1ch w111

be

considered

by. the Commission

as 11sted in subparagraph

(b)(4) of Section

2.790.

The information sought to be w1thheld. shall

be 1ncorporated

as far as poss1ble

into a separate

part of the affidav1t.

If we do not hear from you in this

regard within the specif1ed period, the report will be placed in the Public

Document

Room.

VQXOI.60S~/

Pennsylvania

Power

8

Light Company

No reply to this letter is required;

however,

should you have any questions

concerning, this inspection,

we will be pleased, to discuss

them with you.

Sincerely,

$ i Nli

Robert T. Garison,

Chief

Reactor

Construction

and Engineering

Support Branch

Enclosure:

Office of Inspection'nd

Enforcement Inspection

Report. Number 50-387/79-23

cc, w/encl:

A. R. Sabol,,

Manager.,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

R.

W.. Dunn, Superintendent

of Plant