Staff Requirements Memo Re 820707 Discussion & Possible Vote on Contested Isues in OL Proceeding in Washington,Dc
ML20154E145
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/13/1982
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Bickwit L
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
Shared Package
ML20106A476 List:
References
REF-10CFR9.7 M820707B, NUDOCS 8603070125
Download: ML20154E145 (9)


Text

_ _ _ _ _ _ _ _ _ _ _

L 7*~ l',

,,n f

..f.,'

IN RESPOff5E, PLEASE

%,'?[ [r'\\,

UNIT ED STATES RETER TO M8207073 NUCLE AR REGULATORY dOMMISSION g

W AsecTow. o.c.rosss s

Q f*

4.,,,,

July 13, 1982 s N [n7 LIMITED DISTRIBUTION j

i MMGo bf:l**EG MEMORANDUM TOR:

Leonard Bickwit, Jr., Gen' Counsel TROM:

S A: nuel J. Chilk, Secretar,

SUBJECT:

STATT REQUIREMENTS - DISC SI N AND POSSIBLE VOTE ON CONTESTED ISSUES IN S SQUEHANNA OPERATING LICENSE PROCEEDING, 2:00 P.M.,

WEDNESDAY, JULY 7, 1982, COMM.ISSIONERS' CONFERENCE ROOM (CLOSED MEETING)

The Co=d.irsien was briefed on the May 7, 1982 OPE analysis of the ASL3 initial decision which concludes that the Directtr, NRR should be authorized to issue a full power operating license for Susquehanna Units 1 and 2, with certain conditions.

The Cemission voted un'animously to approve the draft order, attached to the May 7 OPE memerandu:n, as modified at the meeting, making the Board decision 1:n=ediately effectives the General Counsel was instructed to circulate the revised Order prior to its release.

Comissioner Gilinsky Will attach separate views.

(OGC)

(Subsequently, the Order *was circulated by the General Counsel,'

/

on July 9, 1962.)

In connection with his approval, commissioner Robprts stated

  • his preference not to take multipic votes in OL reviews.

/

I The co==.issions 1.

Requested a neeting with staff, TEMA, states' and others in the fall to discuss the question of dosimeters for emergency worksrs (Commissioner Gilincky would have pref erred a meeting prior to' voting on this Order) ;

(IE) t Asked the General Counsel to preparo a Commission proposal L>

2.

for a generic recolution to the above questions (OGC) 0603070125 040Y26 P Dit H EVGP NF(GClf Gft MEETINGO70 PDII CNCLOSURE 3

u e

a..

v..

2-s 3.

Requested staff to include in their briefing on uncontested issues in Susquehanna, the status of the public information brochures; and (NRR)

(SECY Suspense August, 1982) 4.

Requested the General Counsel advise the staff immediately if the Court mandate in the S-3 case is issued.

(OGC) cc Chairman Palladino Cermissioner Gilinsky Comissioner Ahearne Comissioner Roberts ceraissioner Asselstine Commission Staff Offices s

i e

e 0

e 6

6 e

e a 66' s

O M

e

i Federal Ernergency Management Agency r

Washington, D.C. 20472 November 8,1983 MEMORANDUM FOR:

Richard W. Krimm Chairman, Federal Radiological Preparedness Coordinating Committee (FRPCC)

^

Chaiman, Interagenc7 ubiomp[t ee On Offs [1te (,

FROM:

Carl R. Siebentritt

/

t p

Emergency Instrumentation

SUBJECT:

Dosimetry for Emergency Workers This is to provide a final response by the FRPCC Subcommittee On Offsite Emergency Instrumentation to your memorandum dated March 4.1983, on the s'ame subject.

Your memorandum requested that recommendations be made by the subcommittee on the following:

1.

Definition of emergency worker; 2.

The preferred (ideal) system of dosimetry for ernergency workers; 3.

The acceptable (minimum acceptable) system of dosimetry for emergency workers; 4

The position of States with operating commercial nuclear power plants in meeting the recommended, preferred and acceptable systems; 5.

The status of FEMA (and other Federal agencies) furnished dosimeters--their performance characteristics, availability, and applicability for peacetime radiological emergency response; 6.

Other sources of dosimeters--their applicability, performance, cost, and availability for radiological emergency response.

The subcommittee recommendations for items 1, 2, and 3 are provided in Attachment I.

The subcommittee respo1se to the other items are as follows:

o Item 4:

25 of those States having a requirement for offsite planning for nuclear power plint accidents responded to the questionnaire which resulted 'n Attachment 4 of your memorandum.

All 25 States provided for emergency worker dosimetry.

However, 4 States admitted to limitations in operational capabilities.

Most of the States use direct reading dosimeters having a range of 0-200 mR r m v v w m

^ -

as a component of their emergency worke'r dosimetry.

The subcom-mittee believes that this rtnge is too sensitive for a practical system and recommends that the attached guidance on emergency worker dosimetry be provided to all States.

o Item 5: FEMA is the only federal agency which has provided instruments to the States.

Large quantities were granted to the States starting in the 1950's.

FEMA records show that the States have inventories of direct reading dosimeters as follows:

0-200 mR 0-20 R 0-100 R 0-200 R 80,000 97,000 65,000 2,100,000 (All figures are rounded - a breakout by State is available.)

FEMA experience with these instruments has shown that they are capable of providing radiological information with good accuracy if they are tested periodically in accordance with well-established FEMA guidance.

An improved capability for calibrating dosimeters will be provided in FY 1984 to the State Radiological fystems Maintenance Shops.

Al s o,

FEMA has advised the States that FEMn granted dosimeters found to be defective will be repaired (if possible) by the FEMA Emergency Management Systems Test Facility (EMSTF).

Tests conducted recently by EMSTF on 500 recently refurbished 20 R dosimeters, originally manufactured in the 1950's, showed that these dosimeters are capable of meeting the test and performance requirements specified in FEMA-REP-2 and ANSI N322-1977 " Inspection and Test Specifications for Direct and Indirect Reading Quartz Fiber Dosimeters."

A test report is available.

The subcommittee knows of no federal agency furnishing TLDs or film badges.

o Item 6:

Direct-reading dosimeters which meet the performance require-ments of FEMA-REP-2 and ANSI N322-1977 are available from the private s ect o r.

The recomrendations of Attachment I indicate that thqstates P

should develop their procurement requirements around ASNI N3,7T-1977.

Paragraph 4, Test Requirements of the ANSI standard should be included in the preparation of procurement specifications.

In addition, FEMA has developed policy regarding dosimeters procured directly by the States.

This policy is contained in the memorandum dated September 14, 1983, (Attachment II).

The cost of direct-reading dosimeters are estimated to be on the order of $60 to $100 depending upon quantity.

TLDs and film badges which meet requirements for emergency worker dosimetry are widely available at reasonable cost.

The system which employs these instruments should conform to ANSI N13.ll-1983,

" Personnel Dosimetry Performance - Criteria for Testing."

~

Summa ry:

The subcommittee believes that the foregoing and the attachments satisfy your requirements.

This information wi'.1 be included in the update of FEMA-REP-2 as app.ropriate.

f

-L

  • Note:

The subcommittee has received requests for the information given herein.

For example, Margaret Reilly, Pennsylvania would like to have the definition of emergency worker.

Please advise in writing, if draft copies may be furnished in response to these inquiries and, if so, any caveats that may apply.

Attachments (2)

I

=

n e

O a

e O

m g -

-r

-,-p,-a

Attachment I 9

DEFINITION OF AN EMERGENCY' WORKER An emergency worker is an individual who has a mission within the Plume Exposure EPZ which is essential to protect the health and safety of the public and who could be exposed to ionizing radiation from the plume or its deposition.

This individual must be trained in the basic characteristics of ionizing radiation and its health effects.

the individual must be able to determine his cumulative radiation dose with a direct reading dosimeter and know what to do when dose limits and turn-back values are reached.

Emergency workers may include the following:

radiation monitoring personnel, traffic contr'ol personnel, evacuation vehicle drivers, fire and rescue personnel, EOC personnel, personnel carrying out backup alerting precedures and essential services or utility personnel.

Essential services or utility personnel are considered emergency workers only when their services are required to protect the health and safety of the public.

DOSIMETRY SYSTEMS FOR EMERGENCY WORKERS 1.

The Ideal System: Two direct rea' ding dosimeters with different ranges that can adequately cover a range of radiation exposure from 1 R to 200 R.

The dosimeter with the lowest range should be able to reasure radiation exposures of at least 5 R, but no more than 20 R.

The dosimeter with the highest range should be able to measure exposures of at least 100 R.

The direct reading dosimeters should, as a minimum, meet ANSI Standard N322-1977, Inspection and Test Specification for Direct a'nd Indirect Reading Quartz Fiber Pocket Dosimeters and be certified.

The dosimeters should be tested annually for calibration accuracy and electrical leakage.

The lowest range direct reading dosimeter allows the emergency worker to conitor his radiation exposure for turn-back values and/or, administrative dose limits.

The highest range dosimeter allows the emergency worker to monitor to above 75 rem whole-body dose which is the EPA lifesaving PAG for emergency workers.

The reason for recommending an upper limit of 200 R is that there are many direct reading dosimeters available with this range (e.g., CDV-742) and it has adequate sensitivity to measure approximately 2 R increments of exposure.

In addition a permanent record dosineter consisting of a multiple chip TLD should be provided as a backup device for the direct reading dosimeters and to provide a legal record.

The TLD should be read by a processor accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) in accordance with ANSI Standard N 13.11-1983, Personnel Dosimetry Performance-Criteria for Testing.

2.

Minimum Acceptable System:

One direct reading dosimeter with a minimum range capaole of measuring a radiation exposure of a least 5 R and a maximum range that shall not exceed 20 R.

This dosimeter shall be certified, annually leak tested and meet ANSI Standard N 322-1977.

In addition each emergency worker shall be provided a permanent record dosimeter which is read by an accredited processor under NVLAP.

L

s 7-

[,2..h$'.f.*.E. I

  • e a a m 12: 05 S E P 1 <. )_.

MEMORANDUM FOR:

Regional Directors Aw i n, Re d :r.:.1 0-i r utc r FROM:

Deputy Associate Director

,)

State and Local Programs and Support

SUBJECT:

Testing of Radiological Instruments Procured by the States for Radiological Emergency Preparedness.

Some States have received funding from utilities for use in procuring radiological instruments for emergency preparedness capabilities under N'JREG Oe54/ FEMA-REP-1.

The Pennsylvania Emergency Management Agency (PEMA) procured 2,500, 0-20R dosimeters and requested that FEMA assist in quality assurance testing.

Tests were performed by the FEMA Emergency Management Systems Test Facility and the results reported to PEMA.

Tests were also perfomed on a similar procurement by the State of Maine.

Other States have expressed the need of the same services.

Our experience with Pennsylvania and Maine indicates that such testing is very labor intensive and would constitute an overwhelming workload if continued.

In addition, it is not an appropriate FEMA function should the capability be available in the private sector.

Therefore, FEMA will not accept any further requests for such testing.

FEMA has no objection if the State Maintenance and Calibration facilities are used for cuality assurance testing of instrumantation for REP and other contingencies, to the extent that the shop has the capability.

To this end, FEMA will shortly be supplying the State shops with an improved dosimeter calibration fixture for use with the CDV-794 calibrators.

If the State shops do not have the testing capability, the ute of qualified private sector resources should be sought by the States.

Our experience also has revealed the need for a policy statement on instru-mentation procured by the States.

This policy is as follows:

FEMA will not provide quality assurance or acceptance testing sup-o port to tne States, FEMA will permit the use of the State Maintenance and Calibration o

, shops, within the limitaf.icns of the capabilities and equipment,

~

for such testing.

Upon written request, FEMA will provide technical advice to the o

States regarding quality assurance testing.

Such requests should be submitted through Regions and endorsed to the attention of the Emergency Management Programs Of fice.

FEMA will not assist in the preparation of, or evaluation and o

review of State procurement specifications.

Similarly, FEMA will not be a party to any determination relating to the Contractor's performance against State procurement specifications.

Upon written request, FEMA will repair all dosineters which were o

originally procured by FEMA predecessor agencies and granted to the States.

This includes all models.

However, it must be under-

~

stood by the States that certain models will have low yields.

In all cases the same dosimeters sent in for repair will be returned.

Those that can not be repaired will also be returned if the State so requests.

The repair will be performed by the FEMA Emergency Management Systems Test Facility.

All questions regarding this policy should be addressed to the Emergency

- Management Programs Office.

P

(

0 w.,_.-.

-.a v.-..

w

0:F. 25 *?2 ;?:57 rD S !:45H FED CTR 1 P.02 Federal Emergency Management Agency Washington, D.C. 20472 DE S O GB3 MEMORANDUM TOR: Me=bers of the Federal Radiological Preparedness Coordinating Co==ittee (FRPCC)

"si m**v Richard W. Kri==

TROM:

t0 Chair =an, FRPCC SUBJECI:

Dosi=etry for E=ergency Verkers On March 4,1983. I requested the Chair =an of the Subco==ittee on Offsite E=ergency Instru=entation to =ake reco==endations on the follcking:

1.

Definition of E=ergency Worker; 2.

The preferred (ideal) syste= of dosi=etry for e=ergency workers; 3.

The acceptable (=ini=u= acceptable) syste= of dosi=etry for e=ergency workers; 4

The position of States with operating co==ercial nuclear power plants in =eeting che reco== ended, preferred, and acceptable syste=s; 5.

The status of Federal E=ergency Manage =ent Agency (and other Federal agencies) furnished dosi=eters--their perfor=ance characteristics, availability, and applicability for peaceti=e radiclogical e=ergency response; and Other sources of desi=eters--their applicability, perfor=ance, 6.

cost, and availability for radiological e=ergency response.

The Subco==ittee has been working on this assign =ent and the Chair =an provided a final written response to me dated Nove=ber 8,1983,

Subject:

Dosi=etry for E=ergency Workers.

Please review the attached response f ro= the Subco==ittee Chair =an and provide your agency's ce==ents, reco==endation, and/or concurrence to =e by January 26, 1984 In particular, I request that you review and co==cnt on Attach =ent I pertaining to the definition of an E=crgency Worker.

Attach =ent As Stated ENCLOSURE 5

.