ML17138A434

From kanterella
Jump to navigation Jump to search
IE Inspec Repts 50-388/78-16 & 50-387/78-15 on 780829-0901 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Pipe Welding Activities,Piping Quality Assurance Documentation & Review Component Storage
ML17138A434
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/25/1978
From: Durr J, Ebneter S, Jernigan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17138A433 List:
References
50-387-78-16, 50-388-78-15, NUDOCS 7811130151
Download: ML17138A434 (10)


See also: IR 05000387/1978015

Text

U.S.

NUCLEAR REGULATORY COMMISSION

OFFICE

OF INSPECTION AND ENFORCEMENT

Region I

50-387/78-16

Report

No.

50-388/78-15

~D-387

Docket No.

50-388

CPRCZI

License

No. CPPR-102

Prior ity

Category

Licensee:

Penns

lvania Power and Li ht

Com an

2 North Ninth Street

Allentown, Penns

lvania

18101

Inspection at:

Berwick, Pennsylvania

.

Inspection

conducted:

August 29 - September

1,

1978

.

P. Durr, Reactor Inspector

CF'nspectors:

. Jgrnigan,

R)actor Inspector

Facility Name:

Sus

uehanna

Steam Electr't tion, Units

1

and

2

dat

signed

~ ZE I 7g

date signed

Approved

ne er,

c

g

ie,

ng~neering

Support Sectio

o. 1,

RCSES

Branch

date

signed

date

igned

Ins ection

Summar

Ins ection

on Au ust

29 - Se tember 1,

1978

(Re ort Nos.

50-387/78-'16;

50-388/78-15

Areas Ins ected:

Routine,

unannounced

inspection

by regional

based

inspectors

of

t e pspe

we

sng activities

and piping quality assurance

documentation;

observa-

tion of baseline

pre-service

inspection activities;

and review of the component

storage

and maintenance

program.

The inspection

involved 56 inspector-hours

on

site by 2

NRC regional

based

inspectors.

Results:

In the

5 areas

inspected,

no items of noncompliance

were identified.

Region I Form 12

(Rev. April 77)

y5/

Vsl g

q go~~

DETAILS

Persons 'Contacted

Penns

lvania Power'and'Li

ht

Com an

L. Ballard, Site guality Assurance

Engineer

R. Beckley, Site guality Assurance

Engineer

  • J.

D. Green,

Resident guality Assurance

Engineer

Bechtel

Cor oration

  • M. K. Boone,

Lead Welding Engineer

  • M. A. Drucker, guality Assurance

Engineer

G. Gelinas, guality Control Engineer

J.

Khandhar; Mechanical

equality Assurance

Engineer

H., F. Lilligh, Project guality Assurance

Engineer

R.

Lamb, guality Control Engineer,

Welding

H. Omar,

Lead Storage

and Maintenance

Engineer

B. Ott, Lead guality Control

Engineer

  • A. L. Spielhagen,

Project Field Engineer

  • K. G. Stout, Assistant Project Field guality Control Engineer

General Electric

Com an

  • E. A. Gustafson,

Resident Site Manager

  • J.

M. LeVasseur,

Site guality Control Representative

W. Miller, Nondestructive

Examiner,

Level III

R.

M. Pulsifer,

NED Representative

R. Wagner,

I8SE guality Assurance

Supervisor

  • denotes

those present at the exit interview.

Plant Tour

The inspectors

toured the units

1 and

2 reactor buildings observing

work activities, installed equipment,

storage

and protection,

and

evidence of the implementation of the quality control program.

They discussed

the technical

aspects

of the work in progress with

the construction craftsmen,

supervisors,

and quality control per-

sonnel.

No items of noncompliance

were identified.

Licensee Action on Previous

Ins ection Findin

s

(Closed)

Unresolved

Item (387/77-12-02):

Process

control check-

lists (weld card).

The licensee

issued Interoffice Memoranda

dated

September

28,

1977 and January

27,

1978,

both directing the addition

of nondestructive

testing requirements

to the form WR-5, items

26

and 28,

as appropriate,

for the removal of temporary attachments

and repairs.

In addition, the licensee verified the implementation

of this requirement

by direct observations

documented

on QAR-F-317.

The

NRC inspector

observed

welding in progress

and verified that

the associated

form WR-5 did require that pipe from which temporary

attachments

had

been

removed specified nondestructive

testing in

item 28.

(Closed)

Unresolved

Item (387/78-01-05):

Insufficient examination

coverage of welds

DA, DB,

DC,

DE, and

DF in the reactor vessel.

The examination contractor

has

documented

in detail

those welds in

question

and additionally,

has

prepared

plots for each weld configu-

ration to demonstrate

that the maximum possible extent of the

affected welds

have

been

examined.

These plots are

a matter of the

preservice

inspection record.

This approach is consistent with

Section

XI of the

ASME,

B8PV Code.

(Closed)

Unresolved

Item (387/78-01-04):

Lack of appropriate

acceptance

standards.

Implementing

NDE procedures

have

been re-

vised to reflect evaluation,

acceptance/reject

criteria consistent

with the applicable

Code section.

Additionally, this is consistent

with specification

8856-M-166, Revision 1,

Addendum 2,

and current

examination practices

with respect

to dispositioning indications.

The inspector audited volumetric and surface

examination

procedures

for verification of correct acceptance/reject

criteria.

Reactor'Coolant

Pressure

Boundar

Pi

e Weldin

- Observation of

Wor

cts vs tes

nt t

The following pipe welding activities were observed

and it was

verified that they were being performed in accordance

with the

ASME

III and

IX codes,

the Quality Assurance

Manual

ASME Section III,

and regulatory requirements:

The welding of the root pass for the 26" diameter,

schedule

1.156", main steam isolation valve weld VNB-B21-2-FW B6.

Verified the weld identification, weld procedure,

weld appear-

ance,

welder qualification,

and quality control documentation.

The fitup and'root

pass welding of the 26" diameter,

schedule

1.156", main steam line pipe to fitting weld VNB-B21-2-FW B3.

Verified the weld identification, joint preparation,

weld

procedure,

weld appearance,

welder qualification, and quality

control documentation.

No items of noncompliance

were identified.

5.

Reactor

Coolant Pressure

Boundar

Pi in

- Review of ualit

Records

The following reactor coolant pressure

boundary piping component

quality assurance

documentation

was reviewed for compliance with

ASME III code requirements,

FSAR commitments,

and regulatory re-

quirements.

~Com onent

Diameter

~S stem

Pipe Spool

DCA-110-2-4

24"

'HR

Pipe Spool

DLA-104-1-3

12"

FW

Pipe Spool

B21G001

Item 8

26"

MS

Check Valve 24DCA-CK-AO-F050A-PT

24"

W 'W

The review consisted of selective

examinations of the material test

reports,

nondestructive

examination records,

manufacturer

statements

of conformance,

and fabrication/inspection

reports.

The "General Electric guality Control Checklist Nuclear

Power

Piping 127, Revision

2". for the 26" diameter,

main steam pipe spool

B21G001,

item 8,

shop sheet

F-12, indicates that for the 1.037"

thick circumferential

welds

A and

B the preheat

was 175'F.

Further

investigation of the documentation for 10 similar main steam pipe

welds disclosed that the preheat

was 175'F in all cases.

The

ASME

III Code data form NPP-1 states

that the pipe was designed

and

fabricated

in accordance

with the

1971 edition of ASME III, addenda

summer

1971,

Class

1.

Paragraph

NB-4620 of the

1971

code requires

a 200'F preheat or a post weld heat treatment for this pipe.

However, the

FSAR, table 3.2-3 note 5, states

that piping field

installation post weld heat treatment will be made in accordance

with the

ASME III Code,

1974 edition with the

summer

1976 addenda.

Paragraph

NB4620 was changed

in code

addenda winter 1973 and again

in summer

1976 to exempt material of

1 1/4" thickness or less

from

preheat

and post weld heat treat requirements.

The licensee's

representative

stated that an engineering

evaluation

would be performed to verify that

a transition from the'971

code

to a later edition for post weld/preheat treat requirements

would

not adversely affect the design.

He also stated that

a records

review would be performed to assure. that any

GE supplied

P-1 pipe

materials

.

1 1/4" to

1 1/2" in thickness

were properly post weld/

preheat treated.

This item is considered

unresolved

pending

com-

pletion of the foregoing evaluation

and document review.

(387/78-

16-01)

In addition, the material certifications for some of the above

listed components

do not completely list all characteristics

re-

quired to be reported

by the materials specifications.

Specifically,

the metallurgical report for the 90'lbow in pipe spool

DCA-110-2-

4 does not list the hardness

as required

by specification

SA-240.

Also, the welding wire certification for the E308-15 filler metal,.

heat

No.

740654A,

does

not list the results of the fillet weld test

required

by SFA-5.4.

The licensee

stated that the lack of some test results

on material

certifications

has

been recognized.

A program is being

implemented

to review all document

packages

for this problem.

This item is

considered

unresolved

pending the formal implementation of the

review program (387/78-16-02).

Safet

Related

Com onents

Stora e, Handlin

, and Protection

Units

1 and

2

The inspector observed

the storage

and protection provided for the

reactor recirculation

system

pumps

and isolation valves,

core spray

pumps,

residual

heat

removal

(RHR) pumps,

and residual

heat

removal

system heat exchangers.

The inspector

found that the storage

and

protection provided for the above

mentioned

components

was consistent

with the requirements

of the applicable

procedures

and specifications,

with the exception of the heat exchangers.

During inspection of

the in-place .storage of the

RHR heat exchangers,

the inspector

observed that the internal nitrogen atmosphere

had

been

removed in

February

1977, to permit modification work and installation of

connecting piping.

Removal of the nitrogen atmosphere

was acceptable

to the component supplier for the performance of the modification

<<r

work.

However, it was not clear to the inspector

that the above

concurrence

was intended to be for an indefinite period of time.

This item is considered

to be unresolved

pending the supplier's

approval of long term storage of the

RHR heat

exchangers

without

the specified internal nitrogen atmosphere

(387/78-16-03

and 388/78-

15-01).

7.

Installation

and Stora

e Records

The inspector audited

equipment

maintenance

requirements for the

aforementioned

components

listed in paragraph

6.

The inspector

also verified the associated

storage

inspection

records.

The

inspector found that storage

inspections

had

been

performed at the

required frequencies.

The inspector concluded that the equipment

supplier's

storage

requirements

were being met except

as discussed

in paragraph

6 above.

No items of noncompliance

were identified.

8.

Preservice

Ins ection Procedures

The inspector

reviewed procedures

for work activities relative to

preservice

examinations.

The inspector considered

the above item

with regard to criteria delineated

in 10 CFR 50.55.a(g)

and the

ASME Boiler and Pressure

Vessel

Code,

Section XI, 1974 edition

including the Winter 1975 Addenda.

The inspector

examined the

following documents relative to the above.

General Electric Company

Procedures:

l

ISE-QAI-322, Revision 3, dated

March 29,

1978, titled "Ultrasonic

Examination of Similar and Oissimilar Metal Welds."

ISE-QAI-300, "Personnel

Qualification and Certification Program."

I

GE-IPSE Orawing 160-78C-0255,

"Ultrasonic Test Calibration

Standards

- Safe-Ends."

The inspector'considered

the following aspects

relative to the

inspection:

Implementing procedures

reviewed,

approved,

and controlled.

Specified type of apparatus,

transducers,

and calibration

technique,

frequency,

and

beam angles.

Personnel

qualification requirements

consistent with the

ASME,

BSPV Code,

Section XI, and SNT-TC-lA.

Reference

level for monitoring discontinuities is established.

Method of recording/reporting significant .indications.

No items of noncompliance

were identified by the inspector.

9.

Witness of Preservice

Ins ection Activities

Unit 2

The inspector 'witnessed

the volumetric examinations of selected

welds using the manual ultrasonic technique.

Specifically, examina-

tions of the dissimilar metal

welds associated

with the recirculation

inlet nozzles

were observed.

Examinations

performed from the

stainless

steel

extension

piece revealed

indications exceeding

the

recordable level.

These indications

were observed

in nine of the

ten nozzles

examined.

The radiographic

technique

was used

on

portions of welds in four nozzles to verify the presence/location

of indications within the material.

The radiographs

disclosed

an

apparent

discernable

linear indication in each weld radiographed.

These indications could be correlated with those located

by ultrasonic

examination.

The safe-end

to extension

piece assemblies

were

fabricated off site and therefore sufficient manufacturing

documenta-

tion was not available for a complete evaluation at this time.

However, the licensee's

representative

stated that

a complete

evaluation

would be made.

This matter is unresolved.

(387/78-

16-03)

The inspector considered

the above

items with regard to criteria

delineated

in the

ASME Boiler and Pressure

Vessel

Code,

Section XI,

including Winter 1975 Addenda,

and requirements

of the implementing

procedure.

The inspector considered

the following aspects

relative to the

examination

being conducted.

Personnel

qualification of each inspector performing examinations.

This included the three levels of certification, Level 1, ll,

and 111.

Compliance with procedural

requirements

in the following

areas.

Test instrument

was operating

on required frequency,

instrument linearity, and signal attenuation

accuracy.

Scanning

techniques

(beam angles,

scanning

surface,

scanning

rate,

and direction)

and extent of coverage.

Calibration methods

including block size

and reference reflectors.

Beam angles

and distance

amplitude correction technique.

Recording

technique of reference reflectors.

)

No items of noncompliance

were identified.

10.

Data Review of Preservice

Ins ection

The inspector

examined

records related to volumetric/surface

examin-

ation of welds required to be examined for compliance with the

requirements of Section

XI of the

ASME,

B8PV Code.

The inspector

examined preliminary reports/documentation

of examinations

performed

on all ten of the recirculation inlet nozzle welds.

The inspector's

review was to ascertain

compliance in the following

areas:

the method, technique,

recording/reporting of indications

are as stipulated in the implementing procedure.

No items of noncompliance

were identified.

ll.

Unresolved

items are matters

about which more information is re-

quired in order to ascertain

whether they are acceptable

items,

items of noncompliance,

or deviations.

Unresolved

items disclosed

during the inspection

are discussed

in paragraphs

5, 6, g, and .10,

12.

Exit Interview

The inspectors

met with licensee

representatives

(denoted

in para-

graph

1) at the conclusion of the inspection

on September

1, 1978.

The inspectors

summarized

the scope

and findings of the inspection.

d )