Forwards IE Inspec Repts 50-387/78-16 & 50-388/78-15 on 780829-0901 During Which No Items of Noncompliance Were Noted
ML17138A432
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/27/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138A433 List:
References
NUDOCS 7811130135
Download: ML17138A432 (3)


Text

P ~

-~PR ASG( 'Ip0 A.

e +Q O~

/p +(I *++

Docket No-388 UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE KING OF PRUSSIA, PENNSYI VANIA 19406 SEP 27

'(313 Pennsylvania Power 5 Light Company ATTN:

Mr. Norman W. Curtis Vice President Engineering and Construction (N-4)

2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Inspection 50-387/78-16 and '50-388/78-15 This refers to the inspection conducted by Mr. J.

Durr of this office on August 29 - September 1, 1978, at Susquehanna Steam Electric Station, Units '1 and 2, Berwick, Pennsylvania, of activities authorized by NRC License Nos.

CPPR-101 and CPPR-102 and to the discussions of our findings held by Mr. Dur r with Mr. J.

D. Green of 'your staff at the conclusion of the inspection, and to a subsequent telephone discussion between Mr.

Durr and'Mr. J.

Green on September 7, 1978.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspectionreport will be placed in the NRC's Public'Document Room.

If this report'contains any information that you (or your contractor)

believe to be proprietary, it is necessary that, you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement

'f reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b)(4) of Section

~ ~ ~

Pennsylvania Power 5 Light Company

2.790.

The information sought to be withheld shall be incorporated, as far. as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any ques-tions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch Enclosure:

Office of Inspection and, Enforcement Inspection Report Numbers 50-387/78-16 and 50-388/78-15 cc w/encl:

. A.

R. Sabol, Manager, Nuclear guality Assurance H.

E. Barberich, Licensing Engineer