ML17059B002
| ML17059B002 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/17/1995 |
| From: | Edison G NRC (Affiliation Not Assigned) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| TAC-M90288, NUDOCS 9511300266 | |
| Download: ML17059B002 (8) | |
Text
'a
~P,R 1500 0
Cy I
O IOl
+~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASH INGTON, D.C. 20555-0001 November 17, 1995 Fo- >"
Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Hohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE - NINE MILE POINT NUCLEAR STATION UNIT NO.
1 (TAC NO. M90288)
Dear Mr. Sylvia:
By your application dated October 19,
- 1995, and affidavit executed by Michael Manahan, Sr., of MPH Research and Consulting dated October 19,
- 1995, y u submitted "Technical Basis for the Development of the NHP-1 Plant-Specific Charpy Shift Model," and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.
You stated that a non-proprietary version of the document would be submitted by November 17, 1995.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
a.
Information that discloses a process,
- method, or apparatus, including supporting data and analyses, where prevention of its use by MPM Research
& Consulting's competitors without license from MPM Research
& Consulting constitutes a competitive economic advantage over other companies; b.
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the
- design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the version of the submitted information marked as proprietary will be withheld from the public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in 95ii300266 95iii7 PDR ADDCK 05000220 P
PDR 1,3
.g;ilCi'~ t', t'
..'<0~2 ~~~
P
~'
Hr. B. Sylvia November 17, 1995 this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Docket No. 50-220 cc:
See next page Distribution:
QDocket File'UBLIC PDI-1 Reading SVarga JZwolinski LMarsh SLittle GEdison M. P. Siemien CCowgi 1 1, RGN-I Original signed by:
Gordon E. Edison, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
(
C 14 DOCUMENT NAME:
G:(tNHPI'ItN190288.PRO To receive e copy of this document, indicate In the box:
C c
)(
I I
D'thout enclosures'"E"
~ Copy with enclosures "N" ~ No copy OFFICE NAME DATE LA:PDI-SLittl ll/
/95 OGC PH: PDI-1 HPSie ien GEdison:s m
11/i /95 ll/
95 OFFICIAL RECORD COPY D PDI-1 lV LHarsh 11/n /95 ll/
/95
J I
I~
I
'I I
I I),(g f.
l
)
)
II I
)g I)
I/
i II I
i II, I'l
Hr. B. Sylvia this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Docket No. 50-220 cc:
See next page Gordon E. Edison, Senior Project Hanager~
Project Directorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation'
I
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station Unit No.
1 CC:
Mark J. Wetterhahn, Esquire Winston 8 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Mr. Richard B. Abbott Vice President - Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. F. William Valentino, President New York State
- Energy, Research, and Development Authority 2 Rockefeller Plaza
- Albany, NY 12223-1253 Mr. Norman L. Rademacher Unit 1 Plant Manager Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hs. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Hr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations-3 Empire State Plaza
- Albany, NY 12223 Hr. Hartin J. McCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
(
k l