ML17059A981
| ML17059A981 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/30/1995 |
| From: | Edison G NRC (Affiliation Not Assigned) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| TAC-M90288, NUDOCS 9511020106 | |
| Download: ML17059A981 (8) | |
Text
gp,it RE00 I
0
~5 O
IIA 0
gO
+**++
UNITED STATES NUCLEAR REGULATORY COMMISS1ON WASHINGTON, D.C. 20555-0001 October 30, 1995 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P,O.
Box 63
- Lycoming, NY 13093
SUBJECT:
NINE HILE POINT UNIT 1, REQUEST TO MITHDRAM PRESSURE/TEMPERATURE LIMIT CURVES AHENDHENT (TAC NO. H90288)
Dear Hr. Sylvia:
By letter dated September 1,
- 1994, you applied for an amendment to the Nine Mile Point Unit 1 Operating License.
The proposed change would have modified the facility Technical Specification Section 3.2.2, "Hinimum Reactor Vessel; Temperature for Pressurization."
The Nuclear Regulatory Commission denied the amendment request by letter dated September 22,
- 1995, and issued a safety evaluation setting forth the basis for the denial.
The Notice of Denial of Amendment to Facility Operation License and Opportunity for Hearing was published in the ~Federa
~Re ister on September 29, 1995 (60 Fed.
Reg.
50650).
By letter dated October 27,
- 1995, you requested, pursuant to 10 C.F.R. 5 2. 107, that the staff permit the withdrawal of the amendment request without prejudice to its future.resubmittal.
As provided in the September 29, 1995 ~ede al
~Re 'ster notice, the opportunity for you to request a hearing expires today.
Consequently, if you do not request a hearing, the NRC Staff's denial of your amendment request will become final agency action.
However, since the staff's denial of your amendment request has not become final agency action because your time to request a hearing has not yet expired, the staff is granting the withdrawal of your amendment request without prejudice to its future resubmittal.
The
'9I5ii020i06 951030 PDR ADQCK,05000220 P
PDR,'
P
Mr. B. Ralph Sylvia Commission will file a Notice of Withdrawal of Application for Amendment to the Nine Mile Point Unit I Operating License with the Office of the Federal Register for publication.
Sincerely, Docket No. 50-220 cc:
See next page Gordon E. Edison, Senior Project Manager Project Directorate I-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.
1 Cco Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Mr. Richard B. Abbott Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Hohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. F. William Valentino, President New York State
- Energy, Research, and Development Authority 2 Rockefeller Plaza
- Albany, NY 12223-1253 Mr. Norman L. Rademacher Unit 1 Plant Manager Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hs. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Hr. Martin J. McCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
I
Mr. B. Ralph Sylvi October 30, 1995 s
Commission will file a Notice of Withdrawal of Application for Amendment to the Nine Mile Point Unit I Operating License with the Office of the Federal Register for publication.
Sincerely, Docket No. 50-220 cc:
See next page Original signed by:
Gordon E. Edison, Senior Project Manager Project Di.rectorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Distribution:
L-Do'cket Fil'e.
PUBLIC PDI-I Reading SVarga JZwolinski LHarsh SLittle GEdison OGC ACRS CCowgill, RI DOCUMENT NAME:
G: ~I,NMP1iH90288. LTR To receive a copy of this document, indicate in the box:
C
~ Copy thout attachment/enclosure E
~ Copy with attachment/enclosure "N a No copy OFFICE PDI-I:LA PDI-I: P OGC PDI-NAME DATE Little (0 Ho 95 GEdison:dt o
95 0
95 LMar h 95 OFR1Ct'kL~IIKQllll':NN Mkrmm~
t