ML17058B881

From kanterella
Jump to navigation Jump to search

Advises That 920918 Response to Suppl 4 to GL 88-20 Re IPEs for External Events,Acceptable
ML17058B881
Person / Time
Site: Nine Mile Point  
Issue date: 08/11/1993
From: Capra R
Office of Nuclear Reactor Regulation
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
References
GL-88-20, TAC-M83645, TAC-M83646, NUDOCS 9308260078
Download: ML17058B881 (6)


Text

August 11, 1993 Docket Nos.

50-220 and 50-410 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Hr. Sylvia:

DISTRIBUTION:

<'ocket File PDI-1 Reading JCalvo CVogan DBrinkman ACRS (10)

RHernan, 14/C/7 Plant File NRC 8 Local PDRs SVarga RACapra JHenning OGC
CCowgill, RGN-1
JChen, NLN344

SUBJECT:

REVIEW OF

RESPONSE

TO GENERIC LETTER NO. 88-20, SUPPLEMENT NO. 4 INDIVIDUALPLANT EXAMINATIONS FOR EXTERNAL EVENTS NINE MILE POINT NUCLEAR STATION, UNIT NOS.

1 and 2

(TAC NOS.

H83645 AND H83646)

The NRC issued Supplement 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each construction permit holder to conduct an individual plant examination of external events (IPEEE).

Guidance was provided with the generic letter supplement in the form of NUREG-1407, "Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities."

The supplement requested a response that would:

a) identify the method and approach selected for the

IPEEE,
2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.

Following our review of your initial response to Supplement 4,

we informed you by letter dated June 29, 1992, that your scheduled completion dates did not support the Commission's goal of closure on the severe accident issue by mid-1994.

You subsequently provided additional justification for the Unit 1

IPEEE completion date and informed us of your revised date for completion of the Unit 2 IPEEE.

We have reviewed your letter dated September 18,

1992, and, although later than the staff would have preferred, we have determined that your schedules are acceptable.

Please inform us of any changes to your schedules or methodology.

Sincerely, Original signed by:

Robert A. Capra

, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page PDI-1: LA E

CVo an c

PDI-1 PM JMennin wvl (x

PDI-1:PH DBrinkma PDI-1:D RACa ra~

DATE lc 93 R

<o 93 Io 93 8.

P93 OFFICIAL RECORD COPY FILENAME: G:iNMP1-2iNM83645.LTR

~S082S007S 9Soacc ~

PDR ADOCK 05000220; P

PDR

~C mmlmmm'

7

)tk fJ

<gS RED "o

Vg 4~

~O

++*++

Docket Nos.

50-220 and 50-410 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 1993 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

REVIEW OF

RESPONSE

TO GENERIC LETTER NO. 88-20, SUPPLEMENT NO. 4-INDIVIDUALPLANT EXAMINATIONS FOR EXTERNAL EVENTS NINE MILE POINT NUCLEAR STATION, UNIT NOS.

1 and 2

(TAC NOS.

M83645 AND M83646)

The NRC issued Supplement 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each construction permit holder to conduct an individual plant examination of external events (IPEEE).

Guidance was provided with the generic letter supplement in the form of NUREG-1407, "Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities."

The supplement requested a response that would:

a) identify the method and approach selected for the

IPEEE,
2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.

Following our review of your initial response to Supplement 4,

we informed you by letter dated June 29, 1992, that your scheduled completion dates did not support the Commission's goal of closure on the severe accident issue by mid-1994.

You subsequently provided additional justification for the Unit 1

IPEEE completion

.date and informed us of your revised date for completion of the Unit 2 IPEEE.

We have reviewed your letter dated September 18,

1992, and, although later than the staff would have preferred, we have determined that your schedules are acceptable.

Please inform us of any changes to your schedules or methodology.

Sincerely, cc:

See next page Robert A. Capra

, Director Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

V-

~

Hr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit Nos.

1 and 2

Cco Hark J. Wetterhahn, Esquire Winston

& Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382

Oswego, New York 13126 Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 126
Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Hr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Mr. John H. Hueller Plant Manager, Unit 2 Nine Nile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Hr. Paul D.

Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza

Albany, New York 12223 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
Syracuse, New York 13212 Hr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
Syracuse, New York 12223 Hr. Richard M. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue
Albany, New York 12210

0-

~

~