IR 05000289/2016006
| ML17058A346 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/01/2017 |
| From: | Silas Kennedy NRC/RGN-I/DRP/PB6 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Kennedy S | |
| References | |
| IR 2016006 | |
| Download: ML17058A346 (5) | |
Text
March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016006)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Three Mile Island Nuclear Station, Unit 1, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at Three Mile Island Nuclear Station, Unit 1.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to normal baseline inspections, the NRC will be performing TI-192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects
Docket Nos.
50-289 License Nos. DPR-50
Enclosure:
Three Mile Island Nuclear Station Inspection/Activity Plan
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP
NAME MHenrion/MH SKennedy/SK
DATE 2/24/17 2/27/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 1 of 2 01/12/2017 09:52:51 6/26EXAM
1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 05/29/2017 06/02/2017
FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017 7111105T
- TRIENNIAL FIRE PROTECTION
1 IP Fire Protection [Triennial]
7111105T 01/23/2017 01/27/2017
IP Fire Protection [Triennial]
7111105T 02/06/2017 02/10/2017 7111111B
- TMI REQUAL INSP WITH P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 03/13/2017 03/17/2017
IP Licensed Operator Requalification Program 7111111B 03/13/2017 03/17/2017 71124
- HP INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/13/2017 02/17/2017
IP Occupational ALARA Planning and Controls 71124.02 02/13/2017 02/17/2017
IP Occupational Dose Assessment 71124.04 02/13/2017 02/17/2017
IP Radiation Monitoring Instrumentation 71124.05 02/13/2017 02/17/2017 EP
- EP EXERCISE EVALUATION
1 IP Exercise Evaluation 7111401 04/10/2017 04/14/2017
IP Performance Indicator Verification 71151 04/10/2017 04/14/2017 71124
- REMP
1 IP Radiological Environmental Monitoring Program 71124.07 08/28/2017 09/01/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/28/2017 09/01/2017 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/11/2017 09/15/2017 71124
- HP INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/25/2017 09/29/2017
IP Occupational ALARA Planning and Controls 71124.02 09/25/2017 09/29/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/25/2017 09/29/2017
IP Occupational Dose Assessment 71124.04 09/25/2017 09/29/2017 7111108P
- INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 09/25/2017 10/06/2017 71124
- HP INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017
IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 2 of 2 01/12/2017 09:52:51 71124
- HP INSPECTION
1 IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017
IP Occupational Exposure Control Effectiveness 71151-OR01 11/13/2017 11/17/2017 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 03/05/2018 03/09/2018
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/05/2018 03/09/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/05/2018 03/09/2018
IP Performance Indicator Verification 71151 03/05/2018 03/09/2018 71124
- RAD SAFETY INSP
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/12/2018 02/16/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/12/2018 02/16/2018 7111121M
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
1 IP Component Design Bases Inspection (Teams)
7111121M 03/12/2018 03/16/2018
IP Component Design Bases Inspection (Teams)
7111121M 03/26/2018 03/30/2018 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 04/30/2018 05/04/2018
IP Problem Identification and Resolution 71152B 05/14/2018 05/18/2018 71124
- RAD SAFETY INSP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/11/2018 06/15/2018
IP Occupational ALARA Planning and Controls 71124.02 06/11/2018 06/15/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/11/2018 06/15/2018
IP Occupational Dose Assessment 71124.04 06/11/2018 06/15/2018 71124
- RAD INSTRUMENTATION
1 IP Radiation Monitoring Instrumentation 71124.05 09/10/2018 09/14/2018 71124
- RAD SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/12/2018 11/16/2018
IP Occupational ALARA Planning and Controls 71124.02 11/12/2018 11/16/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/12/2018 11/16/2018
IP Occupational Dose Assessment 71124.04 11/12/2018 11/16/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 11/12/2018 11/16/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.