Forwards Augmented Insp Team Rept 50-220/92-80 on 920222- 0304 of 920221 Inadvertent Isolation of Ultimate Heat Sink Event.Caused by Failure to Follow Established Work Control Process by Various Levels of Personnel
ML17056B730
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/17/1992
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Endries J
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B731 List:
References
NUDOCS 9203260308
Download: ML17056B730 (6)


See also: IR 05000220/1992080

Text

Niagara Mohawk Power Corporation

2

The consequences

of this event were minimal because the reactor core and the reactor

coolant were unaffected by this event, no equipment was damaged,

and no radioactivity was

released.

The operator resp'onse to the decrease

in the intake bay level was good.

However,

the work control breakdown that led to this event is significant because it caused the unit to

isolate from its ultimate heat sink.

Consequently,

the screen house bay level dropped below

that required for the safe operation of safety-related pumps and resulted in the unit being in

an unanalyzed condition.

Potential enforcement actions are under active consideration by the NRC.. We willinform

you in future correspondence

the results of.our deliberations.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

the enclosure willbe placed in the NRC Public Document Room.

No response

is required

for this letter.

We acknowledge and appreciate your excellent cooperation with our AITduring this period.

Sincerely,

Marvin W. Hodges, Director

Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report 50-220/92-80

9203260308

920317

.

PDR

ADOCK 05000220

8

PDR

MAR ~ '7 892

Niagara Mohawk Power Corporation

cc w/encl:

B. Sylvia, Executive Vice President - Nuclear

J. Firlit, Vice President - Nuclear Generation

C. Terry, Vice President - Nuclear Engineering

J. Perry, Vice President - Quality Assurance

S. Wilczek, Jr., Vice President - Nuclear Support

K. Dahlberg, Unit I Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

P. Eddy, State of New York

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Taylor, OEDO

E. Jordan, AEOD

T. Martin, RA

W. Kane, DRA

W. Lanning, DRS

J. Fouchard, GPA

D. Rathburn, GPA

T. Murley, NRR

J. Cairo, NRR

S. Varga, NRR

C. Rossi, NRR

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee,

DRP

R. Lobel, OEDO

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

DRS SALP Coordinator

P. Boehnert, Chairman, ACRS

K. Raglin, AEOD

Niagara Mohawk Power Corporation

MAR 1 "l >99?

RS

03/////92

RI

Lanning

03@/92

RI:DRS

Hodges .g

03/>V92

OFFICIALRECORD COPY

A:NM1.PKE