Forwards Insp Repts 50-220/88-08 & 50-410/88-07 on 880401- 0505 & Notice of Violation.Response Should Ref Actions Taken or Planned to Address Subj Violations,Including Failure to Prevent Recurrence of Missed Firewatch Patrols
ML17055D901
Person / Time
Site: Nine Mile Point  
Issue date: 05/25/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055D902 List:
References
NUDOCS 8806080236
Download: ML17055D901 (6)


See also: IR 05000220/1988008

Text

ACCELERATED

DISIRIBUTION

DEMONSTRATION

SYSTEM

-REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806080236

DOC.DATE: 88/05/25

NOTARIZED: NO

FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

50-410 Nine Mile Point Nuclear .Station, Unit 2, Niagara

Moha

AUTH.NAME

AUTHOR AFFILIATION

NENZINGER,E.C.

Region 1, Ofc of the Director

RECIP.NAME

.

RECIPIENT AFFILIATION

MANGAN,C.V.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards Insp Repts 50-220/88-08

& 50-410/88-07

on 880401-

0505

& notice of violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR /

ENCL

J

SIZE'-

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vino ation Response

NOTES:

DOCKET

05000220

05000410

RECIPIENT

ID CODE/NAME

PD1-1

PD

HAUGHEY,M

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB ll

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

0

g J

EG

ILE

02

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

i

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BENEDICT,R

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

~

1

1

1

A

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

27

ENCL

27

Docket Nos.

50-220

50-410

R5 MAY 198B

Niagara

Mohawk Power Corporation

ATTN:

Mr. Charles

V. Mangan

Senior Vice President

Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Combined Inspection

Report

Nos. 50-220/88-08

and 50-410/88-07

1

This letter transmits

the results

o'f the routine inspection

conducted

by

Mr.

W.

Cook and Mr.

W. Schmidt

and others of this office on April 1,

1988 to

May 5,

1988 at Nine Mile Point Units

1 and 2, Scriba,

New York.

A summary of

the findings was presented

to Mr. J. Willis and other members of your staff at

the conclusion of the inspection.

The enclosed

Notice of Violation (Appendix A) is being issued to address

three

problems:

1) failure to prevent the recurrence

of missed firewatch patrols;

2) failure to conduct

sampling prior to purging the drywell; and 3) failure to

perform leak rate testing

on

a containment penetration.

These violations have

been categorized

by severity level according to

10 CFR Part 2, Appendix

C

(Enforcement Policy).

You are required to respond to these violations and in

preparing your response

you should follow the instructions

in Appendix A.

In

your response

you should include those actions

taken or planned to improve

management

oversight of these

areas.

As described

in the attached

report

(Section

1. l.b and 1.2.a) previous corrective actions

were ineffective.

The response

required

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL96-511.

We appreciate

your cooperation

in these matters.

Sincerely,

glRRifRgu~ ~q

Edward

C. Wenzinger,

Chief

Projects

Branch

No.

2

Division of Reactor. Projects

Enclosures:

1. Appendix A, Notice of Violation

2.

NRC Region I Combined Inspection

Report

Nos

~ 50-220/88-08

and 50-410/88-07

8806080236

S80525

PDR

ADOCK 05000220

9'CD

OFFICIAL RECORD

COPY

CIR NMP 88"08/07

0001.0.0

05/25/88

.

0/> i

Niagara

Mohawk Power Corporation

cc w/encls:

T.

E.

Lempges,

Vice President,

Nuclear Generation

Connor

8 Wetterhahn

John

W. Keib, Esquire

T. Perkins,

Vice President,

Nuclear Generation

J. Willis, General

Superintendent

T.

Roman, Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

R. Randall,

Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

J.

Perry,

Vice President,

Quality Assurance

RS MAY l988

A. Pinter,

NMPC Site Licensing

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Hansen,

Manager Corporate Quality Assurance

Director,

Power Division

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room ( LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J.

Johnson,

Section Chief,

DRP

R. Benedict,

Licensing Project Manager,

Unit

1

M. Haughey,

Licensing Project Manager,

Unit 2

State

Liaison Officer (SLO)

B. Clayton,

EDO, Regional

I Coordinator

R. Laura,

Reactor

Engineer,

DRP.

P. Koltay, SRI,

IP3

A. Luptak, SRI, FitzPatrick

C. Anderson,

DRS

H. Williams,

DRP

R

R

Johnson

5<~/88

5/

/88

OFFICIAL RECORD

COPY

CIR

NMP 88-08/07 - 0002.0.0

05/25/88

i~