Forwards Amend 22 to FSAR for Nine Mile Point Unit 2 & Proprietary Design Assessment Rept App 6A. Proprietary Rept Withheld (Ref 10CFR2.790)
ML17055A761
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/20/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML17055A762 List:
References
(NMP2L-0540), (NMP2L-540), NUDOCS 8511250170
Download: ML17055A761 (26)


Text

REGULATORY LIRMATION DISTRIBUTION SY .M (RIDS)

ACCUS'SI OjN NBR: 8511250170. DOC ~ DATE: 85/11/20 NOTARIZED: YES DOCKET FACIL:50 BYNAME,410 Nine Mile Point Nuclear Station< Uni.t 2F Niagar a Moha 05000410 AUTH AUTHOR AFFILIATION MANGANFC,VB Niagara Mohawk Power RECIPIENT AFFILIATION Corp.'ECIP

~ NAME THOMPSON' ~ Division of Licensing (800028-851124)

SUBJECT:

For wards Amend 22 to FSAR for Nine Mile Point Uni,t.? L opr etary "Design Assessment- Rep App 6A.". Proprietary rep ithpeld (ref OC R2.790) FC@,D t0

/~ E'~

DISTRIB TI N CODE: 0001D C F ES REC ED:LTR TITLE': Licensing Submittal: PSAR/F R Amdts 8 Related Correspondence ENCL SIZE: leaf $ DQ7 NOTES6 RECIPIENT COPIES RECIPIENT COPIES I 0 CODE/NAME,'TTR ENCL'WR ID CODE/NANT LTTR ENCL ADTS 0 BWR PD3 PD 1 0 BWR PD3 LA 1

1 0 HAUGHEYiM Q~ 1 1 INTERNAL: ADRS g~'%~0 6 6 1 0 ELD/HDS3 1 0 IEi FILE 1 1 IE/DEPER/EPB NRR BWR ADTS P@

~)$ 1 1

1 1

IE'/DQAYT/QABZI +If NRR PWR "A ADTS g+ 1 1

1 NRR PWR B ADTSgft7. 1 1 NRR ROE'FMBL 1 1

+N NRglDHFT/HTB g I NRR/DHFT/HFIB NRR/DHFT/TSCB g 1 1

'IR ++ 1 1 f

GRUELFR'DM/LFMB NRR/DSRO/RRAB +'

1 1 1

NR EG i@)

1 1

1 1

RGN1 +~f/21)% 3 B 1 0 EXTERNAL: 24X 1 BNL(AMDTS ONLY)

DMB/DSS (AMDTS) LPDR 03 NRC PDR 02 NSIC1 05 PNL grange.'<p pJL t'0"@g y~ g,QZP)ey P~g 0 5 iDB 7bR gSI PSl

<<<'OTAL NUMBER OF COPIES REQUIRED:, LTTR 3( ENCL 30

4 4

~

g W

~ 1 ~

~ v

~

~ ~

Wj 11 Q I Jj a

t ll ll > v

~ "p 4 g;y a$

1 gl 1 Jc

.t I

~ 1 g+ gvtWv ~ ~ e 4

4 WW 5 3'L g>>

p . yt vi

~ vtn ~ ~

C t

8ll 7 NIIASAIRA illU MOoHAMK NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST. SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 November 20, 1985 (NMP2L 0540)

Mr. Hugh Thompson, Director Division of Licensing Office of Nuclear Reactor Regulation U-S. Nuclear Regulatory Commission Washington, O.C. 20555 Oear Mr. Thompson:

Re: Amendment 22 to Application to Operating License Nine Mile Point Unit 2 Oocket N . 50-410 In accordance, with 10CFR50.30(c)(l), 10CFR51.24 and your March 29, 1983 letter, enclosed are three originals and 60 copies of Amendment 22 to the Final Safety Analysis Report. These changes incorporate certain responses into the text of the Final Safety Analysis Report. Also included are changes that have resulted from our continuing. review of these documents.

I In the original submittal of the'Final Safety Analysis Report on January 25, 1983, we requested proprietary status for certain figures in Section 6A in accordance with 10CFR2.790. The September 21, 1983 letter from A. Schwencer to G. K. Rhode approved this proprietary status. Amendment 22 contains updates to these figures in Section 6A. These updates are marked proprietary and are being sent under separ ate cover.

Enclosed is the Summary of Incorporated Changes. This list is to assist the Nuclear Regulatory Commission in r eviewing Amendment 22.

Very truly yours, C. V. Mangan Senior Vice President JM:rla Enclosure 1084G g 8~ ~/4>

xc: Project File (2) Leug QQ pP N5IC 8511250170 851120 PDR ADOCN, 05000410 PDR I AA - Brd8L II K

e f

C II o

I 4 I

a

v UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Natter of )

)

Niagara Nohawk Power Corporation ) Docket No. 50-410

)

(Nine Nile Point Unit 2) )

AFFIDAVIT C. V. Man an , being duly sworn, states that he is Vice President o N>agara o aw ower orporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information,and belief.

Subscribed and swor~to b fore me, a NotargPubltc 'n and. or the State of York and County of UJ , this~ day of New

, 1985.

t No ry Pub sc sn an for County, New York Hy Conti'ssion expires:

JANls g. MAGRQ he 8 ttotary public ln the State of ttew York tto. 478 Qualitied ln onondaga county 30, 1 Errptres March My Comm)salon

1 1

Nine Mile Point Unit 2 FSAR

SUMMARY

OF INCORPORATED CHANGES I egend R = Response to NRC Question or SER Item E = Editorial or Typographical change that has not effected basis of FSAR.

N = Nonsafety-related change in design, schedule, and/or procedure.

SN = Change to a safety-'related item that has no effect on SER.

SS = Change to safety-related item that has an effect on SER.

Amendment 22 SIC-1 November 198S

Nine Mile Point Unit 2 FSAR Change Pacaes Code Attach 1.10-1, To classify reactor Page 1.10-73i recirculation pump seal purge as essential open item 8(b)

Page 6A.3-25a, Confirmatory item 13(j)

Attach 6A 3-1

~ response to, staff questions concerning SRV inplant tests (Letter NMP2L 0489 dated 9/16/85) 6A. 4-24 Confirmatory item 13(c) downcomer loads and to be consistent with NUREG-0808 (Letter NMP2L 0489 dated 9/16/85) 6A. 3-17a, 6A. 3-17 Confirmatory item 13(i)

Fig. 6A. 3-43 flexible downcomers and 6A.3-44 (Letter NMP2L 0503 dated 9/30/85) 6A.10-4, 6A.10-9, 9a 5 9b R Confirmatory item 13(f) 6A.10-10 suppression pool/SRV Fig. 6A.10-14 (Letter NMP2L 0503 through dated 9/30/85) 6A.10>>20 Q/R F421.13, with Confirmatory item 20 Attach 3, 4A, B, C isolation of circuits (Letter NMP2L 0515 dated 10/17/85)

Fig. 9.5-40a, b, Confirmatory item 40 c, and 9.5-42 standby diesel generator system PScIDs (Letter NMP2L 0507 dated 10/4/85) 2.5-194, Confirmatory item 2 2.5-194al, revetment ditch quality 2.5-194a2, 2.5-220 control data (Letter NMP2L 0497 Table 2.5-34, dated 9/27/85 Fig. 2 '-127 HC-15, HC-15a R Confirmatory item 13(l)

Amendment 22 SIC-2 November 1985

N ~

Nine Mile Point Unit 2 FSAR Change

~Pa es Code Humphrey Concerns 8.4 (Letter NMP2L 0489 dated 9/16/85) 2.3-8, 8a, 8b, 8c Open item 1 address staff comments on snow loads (Letter NMP2L 0473 dated 8/23/85) 5.2-28a Open item 3 input to ISI commitment extent of examination Q/R F271. 10 Update response to be consistent with PSI/ISI plan Appendix D RAI 270.4 through Response to staff 270.14* questions concerning equipment qualification (Letters NMP2L 0514 dated 10/17/85 and NMP2L 0518 dated 10/28/85) 6A.3-7, 6A.3-9, Response to NRC letter dated Table 6A.3-18 March 4, 1985 concerning Fig. 6A.3-5 SRV discharge line Fig. 6A.3-6 geometry 3.10B-l through Open item 4(a) 3.10B-7, Table seismic qualification 3.10B-2, Fig.

3.10B-1 through 3.10B-4 Q/R F640.08-1 Staff request on Regulatory Guide 1.108 (Letter NMP2I 0528 dated ll/8/85)

Q/R F640.11-1 Clarification of previous and 2 response (Letter NMP2L 0528

  • Note: RAI 270.4 through 270.14 were originally transmitted from NRC to NMPC as RAI 270.1 through 270.11 (letter dated July 8, 1985)

Amendment 22 SIC-3 November 1985

Nine Mile Point Unit 2 FSAR Change Pacaes Code dated 11/8/85)

Q/R F640.13-1 Clarification for scheduled verification of emergency heat removal rates (Letter NMP2L 0528 dated. 11/8/85)

Q/R F640.19-1 Clarification for calibration of radiation detection and monitoring devices (Letter NMP2L 0528 dated 11/8/85)

Q/R F640.34-3, Clarification of testing 34-5, 34-6, and of various systems at Attachment various plant phases 640.34-1 (Letter NMP2L 0528 (Question 2 dated ll/8/85)

Page 3 of 3)

Q/R F640.35-1 Update of test schedule (Letter NMP2L 0528 dated ll/8/85)

Table 2.2-8 To correct typo Table 2.5-50 Correction for accuracy 3.8-73a Editorial correction Table 6.3-4 To correct typo's 6.4-5 and 9.4-3 Text and Table 9.4-1 agreement

8. 3-5 To correctly identify reactor recirculation pumps and c 1ari fy wording 9.1-3a To correct text relative to material for new fuel vault covers Table 9.4-2 To correct table to agree with text Amendment. 22 SIC-4 November 1985

Nine Mile Point Unit 2 FSAR Change PacCes Code

9. 4-27 Reference clarification of compliance with NUREG-0660 Appendix 9B, Editorial Section 9B.6 and 9B.9 Table 9B.8-1 Editorial Pages 5, 62 through 66, 69, 71 and 72 of 75
13. 1-2 To correct. typo Q/R F480.25"1 Correction for reference accuracy (Letter NMP2L 0528 dated 11/8/85)

Q/R F640.22-1 Correction for reference accuracy (Letter NMP2L 0528 dated ll/8/85)

Q/R F640.1-1 Correction for accuracy (Letter NMP2L 0524 dated 10/30/85)

Table 14.2-1 Editorial (Letter NMP2L 0524 pages 1 through 6, dated 10/30/85)

Table 14.2-2 through Table 14.2-43, Table 14.2-44 through 110, Table 14.2-112 through 132, Table 14.2-201 through 209, Table 14.2-211 through 14 '-216a, Table 14.2-217 through 14.2-241b, Table 14.2-242 through 14.2-245, Table 14.2-301 through 14.2-305, Table 14.2-401 Amendment 22 SIC-5 November 1985

4e Nine Mile Point Unit 2 FSAR Change Pacaes Code through 14. 2-403, Fig. 14 '-2, 14.2-4, 14.2-6, 14.2-233-1, 14.2-236-1 9.3-23 N Design update of flow discharge into storm drainage system Fig. 9. 3-Sa N Design update of through process sampling

9. 3-5h, 9. 3-5j system PGIDs and 9.3-5k 9.3-25 through N Design update of 9.3-28, Fig. turbine building drains 9.3-10a through PEcIDs and text 9.3-10h and 9.3-10j
9. 4-33 through N Update of the radwaste building 9.4-38 and HVAC description to be Table 9.4-4 consistent with design documents
9. 4-,42 N Update of turbine building HVAC test procedure to be consistent with design specification Table 1.8-1 N Clarification of text Page 64, 84, 102 (Letter NMP2L 0524 and 102a of 169 dated 10/30/85)

Pages 14.2-1 N Update to make FSAR.

through consistent with plant pro-14.2-38 cedures, organization and testing (Letter NMP2L 0524 dated 10/30/85) 9 '-9 SN Design update to Amendment 22 SIC-6 November 1985

Nine Mile Point Unit 2 FSAR Change Pacaes Code reflect as-built air intakes for control building Table 9.4-1 SN Update of design for remote shutdown rooms 17.1-40 and SN Update of control program 17.1-40a relative to ratio of accuracy from MEcTE to plant equipment Table 3.7A-3 SN Update of seismic through 3.7A-9 analysis for reactor Fig. 3 'A-3 building and control through 3.7A-17 building Fig. 2. 5-154 and SN Design update for and 2.5-155 flood control berm 3.8-27 SN Update primary containment penetrations design pressure testing relative to ASME III Code Edition dates Table 3.10A-l SN Update of essential component for metal clad switchgear 4160 V

6. 1-5, s SN Identification update Table 6.1-3, of protective Pages 3.8-17b, coatings design 3.8-18, .9-41 6A ~ 4-25 SN Design verification 9.2-3, 9.2-8, SN Update service water 9.2-9, 9.2-10, system PGIDs and text Amendment 22 SIC-7 November 1985

Jl Nine Mile Point Unit 2 FSAR Change Pacaes Code 9.2-42, 9. 2-43, Update FSAR to agree with ECN's Fig. 9.2 -la for se'rvioe water system through 9.2-1h, 9.2-1j, 9. 2-1k, 9.2-11, 9.2-1m, 9.2-1n, 9.2-1p, and 9.2- lq 9.3-22, 9.3-25 SN Update controls through 9.3-29 provided for manual operation of various building sump pumps Fig. 9. 3-la SN System update instrument through 9. 3-1h, and service air PSIDs

9. 3-1j and 9.3-1k 9.4-3, 9.4-5$ 9.4-49 SN Update diesel Fig. 9. 4-15a generator building HVAC system P&IDs and text 3.8-25b SS Procedure update, liquid penetrant vs visual examination for downcomer embedment plate weld 3.8-51, 3.8-73 SS Visual weld acceptance and Table 3.9A-15 criteria (Letter NMP2L 0492 dated 9/18/85) 9.5-25 and SS Update fire 9A.3-47 protection for diesel generator and charcoal filters Table 3.9A-15 SS Use of compression fittings in Category I instrumentation lines and pressure boundary testing Table 5.2-1 SS Update of NSSS Code cases and Amendment 22 SIC-8 November 1985

Nine Mile Point Unit 2 FSAR e

Change Pages Code Description addition of Code Case N-392-Class 2 and 3 pipe supports Fig 13. 1-5, SS Update descriptions of plant Table 13. 1-5, Pages procedures for:

13.5-1 through 13.5-7, Table ~ Site Organization 13.5-2 and 13.5-3, ~ Shift Crew Positions Appendix A ~ Administrative Table 13.5-4 ~ Equipment Control through 13.5-7 ~ Modifications of Procedures

~ Surveillance Testing

~ Logbook

~ Operating and Maintenance

~ Control Room

~ Emergency

~ Security Table 15. 0-1, SS To make FSAR 15.0-3, Page consistent with 15.1-2, 15.1-4; plant events 15.1-5, 15.1-11 under confirmation Table 15.1-1, and verification program 15.1-3, 15.1-4, Page 15.2-5, 15.2-6 15.2-10, 15.2-15, 15.2-16, 15.2-21 15.2-22, 15.2-28, 15.2-29, 15.2-32, 15.2-32a Table 15.2-5, 15.2-9, 15.2-11, 15.2-13 Fig.

15.2-3, 15.2-4, 15.2-10, 15.2-11 Page 15.3-4, 15.3-7, 15.3-10 Table 15.3-1, 15.3-4 Page 15.4-2, 15.4-3, 15.4-7 15.4-12, 15.4-13, 15.4-15, 15.4-16, 15.4-21 Table 15.4-3, 15.4-4, 15.4-9 Fig. 15.4-1, 15.4-2, Amendment 22 SIC-9 November 1985

~ ~ Nine Nile Point Unit 2 FSAR Change Pacae s Code Page 15.6-16 Table 15 '-21 Attach 1.10-1, SS Update FSAR to Pages 1.10-73f, incorporate changes 1.10-73h, 1.10-73j, from containment

1.10-731, 1.10-73m isolation dependability 1 .10-73i study Reference NUREG-0737 Table 3.9B-2* SS Update of new loads 9B.4-1 through SS Revised systems used 9B.4-8 for safe shutdown Fig. 9B.4-1 and based on Appendix R 9B.4-2 audit
  • Table 3.9B-2a pg. 1 of 3 thru 3 of 3 2b 2G 2d 2e 2f pg. 1 of 4 thru 4 of 4 2g 2h pg. 1 of 4 thru'4 of,4 21 pg. 1 of 4 thru 4 of 4 2+ pg. 20f 3$ '3 of 3 Amendment 22 SIC-10 November 1985

'