Forwards Amend 22 to FSAR for Nine Mile Point Unit 2 & Proprietary Design Assessment Rept App 6A. Proprietary Rept Withheld (Ref 10CFR2.790)
ML17055A761
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/20/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML17055A762 List:
References
(NMP2L-0540), (NMP2L-540), NUDOCS 8511250170
Download: ML17055A761 (26)


Text

REGULATORY LIRMATION DISTRIBUTION SY

.M (RIDS)

ACCUS'SI OjN NBR: 8511250170.

DOC ~ DATE: 85/11/20 NOTARIZED:

YES DOCKET FACIL:50 410 Nine Mile Point Nuclear Station<

Uni.t 2F Niagar a Moha 05000410 AUTH

BYNAME, AUTHOR AFFILIATION MANGANFC,VB Niagara Mohawk Power Corp.'ECIP

~ NAME RECIPIENT AFFILIATION THOMPSON'

~

Division of Licensing (800028-851124)

SUBJECT:

For wards Amend 22 to FSAR for Nine Mile Point Uni,t.?

L opr etary "Design Assessment-Rep App 6A.". Proprietary rep ithpeld (ref OC R2.790)

FC@,D t0 DISTRIB TI N

CODE:

0001D C

F ES REC ED:LTR ENCL SIZE: leaf $DQ7

/~

E'~

TITLE': Licensing Submittal:

PSAR/F R Amdts 8 Related Correspondence NOTES6 RECIPIENT COPIES I 0 CODE/NAME,'TTR ENCL'WR ADTS 1

0 BWR PD3 LA 1

0 INTERNAL: ADRS g~'%~0 6

6 ELD/HDS3 1

0 IE/DEPER/EPB ~)$

1 1

NRR BWR ADTS P@

1 1

NRR PWR B ADTSgft7.

1 1

NRR/DHFT/HFIB +N 1

1 f

NRR/DHFT/TSCB g 1

1 NRR/DSRO/RRAB +'

1 RGN1

+~f/21)% 3 EXTERNAL: 24X 1

DMB/DSS (AMDTS)

NRC PDR 02 PNL GRUELFR'DM/LFMB IEi FILE IE'/DQAYT/QABZI+If NRR PWR "A ADTS g+

NRR ROE'FMBL NRglDHFT/HTB g I NR

'IR ++

EG i@)

B BNL(AMDTS ONLY)

LPDR 03 NSIC1 05 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0

RECIPIENT COPIES ID CODE/NANT LTTR ENCL BWR PD3 PD 1

0 HAUGHEYiM Q~

1 1

grange.'<

p pJL t'0"@g y~ g,QZP)ey P~g 0 5 iDB 7bR gSI PSl -

<<<'OTAL NUMBER OF COPIES REQUIRED:, LTTR 3(

ENCL 30

4 4

~

g W

~

1 ~

~ v

~ Wj

~

~

I Jj a

ll> v

~ "p 4

1 gl 1 Jc 1.t t

ll 11 Q g;y a$

I

~

1 g+ gvtWv ~ ~ e 4

4 WW 5 3'L g>>

p

. yt vi

~

vtn C t

~

~

8ll 7 NIIASAIRA illU MOoHAMK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST. SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 November 20, 1985 (NMP2L 0540)

Mr. Hugh Thompson, Director Division of Licensing Office of Nuclear Reactor Regulation U-S. Nuclear Regulatory Commission Washington, O.C.

20555 Oear Mr. Thompson:

Re:

Amendment 22 to Application to Operating License Nine Mile Point Unit 2 Oocket N

. 50-410 In accordance, with 10CFR50.30(c)(l),

10CFR51.24 and your March 29, 1983 letter, enclosed are three originals and 60 copies of Amendment 22 to the Final Safety Analysis Report.

These changes incorporate certain responses into the text of the Final Safety Analysis Report.

Also included are changes that have resulted from our continuing. review of these documents.

I In the original submittal of the'Final Safety Analysis Report on January 25, 1983, we requested proprietary status for certain figures in Section 6A in accordance with 10CFR2.790.

The September 21, 1983 letter from A. Schwencer to G. K. Rhode approved this proprietary status.

Amendment 22 contains updates to these figures in Section 6A.

These updates are marked proprietary and are being sent under separ ate cover.

Enclosed is the Summary of Incorporated Changes.

This list is to assist the Nuclear Regulatory Commission in r eviewing Amendment 22.

Very truly yours, C. V. Mangan Senior Vice President JM:rla Enclosure 1084G xc: Project File (2) 8511250170 851120 PDR ADOCN, 05000410 II K

PDR QQ pP I

g 8~ ~/4>

Leug N5IC AA-Brd8L

e f

C II o

I 4

I a

v UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Natter of

)

)

Niagara Nohawk Power Corporation

)

)

(Nine Nile Point Unit 2)

)

Docket No. 50-410 AFFIDAVIT C.

V. Man an

, being duly sworn, states that he is Vice President o

N>agara o

aw ower orporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information,and belief.

Subscribed and swor~to b fore me, a NotargPubltc

'n and.

or the State of New York and County of UJ

, this~ day of

, 1985.

t No ry Pub sc sn an for

County, New York Hy Conti'ssion expires:

JANls g. MAGRQ ttotary public ln the 8 he State of ttew York Qualitied ln onondaga county tto. 478 My Comm)salon Errptres March 30, 1

1 1

Nine Mile Point Unit 2 FSAR

SUMMARY

OF INCORPORATED CHANGES I egend R

= Response to NRC Question or SER Item E

= Editorial or Typographical change that has not effected basis of FSAR.

N

= Nonsafety-related change in design,

schedule, and/or procedure.

SN = Change to a safety-'related item that has no effect on SER.

SS

= Change to safety-related item that has an effect on SER.

Amendment 22 SIC-1 November 198S

Nine Mile Point Unit 2 FSAR Pacaes Attach 1.10-1, Page 1.10-73i Page 6A.3-25a, Attach 6A ~ 3-1 6A. 4-24 6A. 3-17a, 6A. 3-17 Fig.

6A. 3-43 and 6A.3-44 Change Code To classify reactor recirculation pump seal purge as essential open item 8(b)

Confirmatory item 13(j) response to, staff questions concerning SRV inplant tests (Letter NMP2L 0489 dated 9/16/85)

Confirmatory item 13(c) downcomer loads and to be consistent with NUREG-0808 (Letter NMP2L 0489 dated 9/16/85)

Confirmatory item 13(i) flexible downcomers (Letter NMP2L 0503 dated 9/30/85) 6A.10-4, 6A.10-9, 9a 5 9b R 6A.10-10 Fig.

6A.10-14 through 6A.10>>20 Confirmatory item 13(f) suppression pool/SRV (Letter NMP2L 0503 dated 9/30/85)

Q/R F421.13, with Attach 3, 4A, B,

C Fig. 9.5-40a, b,

c, and 9.5-42 2.5-194, 2.5-194al, 2.5-194a2, 2.5-220 Table 2.5-34, Fig.

2 '-127 HC-15, HC-15a Amendment 22 R

SIC-2 Confirmatory item 20 isolation of circuits (Letter NMP2L 0515 dated 10/17/85)

Confirmatory item 40 standby diesel generator system PScIDs (Letter NMP2L 0507 dated 10/4/85)

Confirmatory item 2

revetment ditch quality control data (Letter NMP2L 0497 dated 9/27/85 Confirmatory item 13(l)

November 1985

N

~

Nine Mile Point Unit 2 FSAR

~Pa es 2.3-8, 8a, 8b, 8c 5.2-28a Q/R F271. 10 RAI 270.4 through 270.14*

6A.3-7, 6A.3-9, Table 6A.3-18 Fig. 6A.3-5 Fig. 6A.3-6 3.10B-l through 3.10B-7, Table 3.10B-2, Fig.

3.10B-1 through 3.10B-4 Change Code Humphrey Concerns 8.4 (Letter NMP2L 0489 dated 9/16/85)

Open item 1 address staff comments on snow loads (Letter NMP2L 0473 dated 8/23/85)

Open item 3 input to ISI commitment extent of examination Update response to be consistent with PSI/ISI plan Appendix D

Response

to staff questions concerning equipment qualification (Letters NMP2L 0514 dated 10/17/85 and NMP2L 0518 dated 10/28/85)

Response

to NRC letter dated March 4, 1985 concerning SRV discharge line geometry Open item 4(a) seismic qualification Q/R F640.08-1 Q/R F640.11-1 and 2

Staff request on Regulatory Guide 1.108 (Letter NMP2I 0528 dated ll/8/85)

Clarification of previous response (Letter NMP2L 0528

  • Note:

RAI 270.4 through 270.14 were originally transmitted from NRC to NMPC as RAI 270.1 through 270.11 (letter dated July 8, 1985)

Amendment 22 SIC-3 November 1985

Nine Mile Point Unit 2 FSAR Pacaes Q/R F640.13-1 Q/R F640.19-1 Q/R F640.34-3, 34-5, 34-6, and Attachment 640.34-1 (Question 2

Page 3 of 3)

Q/R F640.35-1 Table 2.2-8 Table 2.5-50 3.8-73a Table 6.3-4 6.4-5 and 9.4-3

8. 3-5 9.1-3a Change Code dated 11/8/85)

Clarification for scheduled verification of emergency heat removal rates (Letter NMP2L 0528 dated. 11/8/85)

Clarification for calibration of radiation detection and monitoring devices (Letter NMP2L 0528 dated 11/8/85)

Clarification of testing of various systems at various plant phases (Letter NMP2L 0528 dated ll/8/85)

Update of test schedule (Letter NMP2L 0528 dated ll/8/85)

To correct typo Correction for accuracy Editorial correction To correct typo's Text and Table 9.4-1 agreement To correctly identify reactor recirculation pumps and c 1arify wording To correct text relative to material for new fuel vault covers Table 9.4-2 Amendment.

22 SIC-4 To correct table to agree with text November 1985

Nine Mile Point Unit 2 FSAR PacCes

9. 4-27 Appendix 9B, Section 9B.6 and 9B.9 Table 9B.8-1 Pages 5,

62 through 66, 69, 71 and 72 of 75 Change Code Reference clarification of compliance with NUREG-0660 Editorial Editorial

13. 1-2 Q/R F480.25"1 Q/R F640.22-1 Q/R F640.1-1 Table 14.2-1 pages 1 through 6,

Table 14.2-2 through Table 14.2-43, Table 14.2-44 through

110, Table 14.2-112 through
132, Table 14.2-201 through 209, Table 14.2-211 through 14 '-216a, Table 14.2-217 through 14.2-241b, Table 14.2-242 through 14.2-245, Table 14.2-301 through 14.2-305, Table 14.2-401 To correct. typo Correction for reference accuracy (Letter NMP2L 0528 dated 11/8/85)

Correction for reference accuracy (Letter NMP2L 0528 dated ll/8/85)

Correction for accuracy (Letter NMP2L 0524 dated 10/30/85)

Editorial (Letter NMP2L 0524 dated 10/30/85)

Amendment 22 SIC-5 November 1985

4e

Nine Mile Point Unit 2 FSAR Pacaes through

14. 2-403, Fig.

14 '-2, 14.2-4, 14.2-6, 14.2-233-1, 14.2-236-1 Change Code 9.3-23 Fig. 9. 3-Sa through

9. 3-5h,
9. 3-5j and 9.3-5k N

N Design update of flow discharge into storm drainage system Design update of process sampling system PGIDs 9.3-25 through 9.3-28, Fig.

9.3-10a through 9.3-10h and 9.3-10j

9. 4-33 through 9.4-38 and Table 9.4-4
9. 4-,42 Table 1.8-1 Page 64, 84, 102 and 102a of 169 Pages 14.2-1 through 14.2-38 N

N N

N N

Design update of turbine building drains PEcIDs and text Update of the radwaste building HVAC description to be consistent with design documents Update of turbine building HVAC test procedure to be consistent with design specification Clarification of text (Letter NMP2L 0524 dated 10/30/85)

Update to make FSAR.

consistent with plant pro-

cedures, organization and testing (Letter NMP2L 0524 dated 10/30/85) 9 '-9 Amendment 22 SN SIC-6 Design update to November 1985

Nine Mile Point Unit 2 FSAR Pacaes Change Code Table 9.4-1 SN reflect as-built air intakes for control building Update of design for remote shutdown rooms 17.1-40 and 17.1-40a Table 3.7A-3 through 3.7A-9 Fig.

3 'A-3 through 3.7A-17 Fig. 2. 5-154 and and 2.5-155 SN SN SN Update of control program relative to ratio of accuracy from MEcTE to plant equipment Update of seismic analysis for reactor building and control building Design update for flood control berm 3.8-27 SN Update primary containment penetrations design pressure testing relative to ASME III Code Edition dates Table 3.10A-l SN Update of essential component for metal clad switchgear 4160 V

6. 1-5, s

Table 6.1-3, Pages 3.8-17b, 3.8-18,.9-41 SN Identification update of protective coatings design 6A ~ 4-25 SN Design verification 9.2-3, 9.2-8, 9.2-9, 9.2-10, Amendment 22 SN SIC-7 Update service water system PGIDs and text November 1985

Jl

Nine Mile Point Unit 2 FSAR Pacaes 9.2-42, Fig. 9.2 through 9.2-1j, 9.2-11, 9.2-1n, and 9.2-

9. 2-43,

-la 9.2-1h,

9. 2-1k, 9.2-1m, 9.2-1p, lq Change Code Update FSAR to agree with ECN's for se'rvioe water system 9.3-22, 9.3-25 through 9.3-29 Fig.
9. 3-la through 9. 3-1h,
9. 3-1j and 9.3-1k SN SN Update controls provided for manual operation of various building sump pumps System update instrument and service air PSIDs 9.4-3, 9.4-5$ 9.4-49 Fig.
9. 4-15a SN Update diesel generator building HVAC system P&IDs and text 3.8-25b 3.8-51, 3.8-73 and Table 3.9A-15 SS SS Procedure
update, liquid penetrant vs visual examination for downcomer embedment plate weld Visual weld acceptance criteria (Letter NMP2L 0492 dated 9/18/85) 9.5-25 and 9A.3-47 Table 3.9A-15 Table 5.2-1 SS SS SS Update fire protection for diesel generator and charcoal filters Use of compression fittings in Category I instrumentation lines and pressure boundary testing Update of NSSS Code cases and Amendment 22 SIC-8 November 1985

Nine Mile Point Unit 2 FSAR e

Pages Change Code Description Fig 13. 1-5, Table

13. 1-5, Pages 13.5-1 through 13.5-7, Table 13.5-2 and 13.5-3, Appendix A

Table 13.5-4 through 13.5-7 Table

15. 0-1, 15.0-3, Page 15.1-2, 15.1-4; 15.1-5, 15.1-11 Table 15.1-1, 15.1-3, 15.1-4, Page 15.2-5, 15.2-6 15.2-10, 15.2-15, 15.2-16, 15.2-21 15.2-22, 15.2-28, 15.2-29, 15.2-32, 15.2-32a Table 15.2-5, 15.2-9, 15.2-11, 15.2-13 Fig.

15.2-3, 15.2-4, 15.2-10, 15.2-11 Page 15.3-4, 15.3-7, 15.3-10 Table 15.3-1, 15.3-4 Page 15.4-2, 15.4-3, 15.4-7 15.4-12, 15.4-13, 15.4-15, 15.4-16, 15.4-21 Table 15.4-3, 15.4-4, 15.4-9 Fig. 15.4-1, 15.4-2, Amendment 22 SS SS SIC-9 addition of Code Case N-392-Class 2 and 3 pipe supports Update descriptions of plant procedures for:

~ Site Organization

~ Shift Crew Positions

~ Administrative

~ Equipment Control

~ Modifications of Procedures

~ Surveillance Testing

~ Logbook

~ Operating and Maintenance

~ Control Room

~ Emergency

~ Security To make FSAR consistent with plant events under confirmation and verification program November 1985

~

~

Nine Nile Point Unit 2 FSAR Pacae s Page 15.6-16 Table 15 '-21 Change Code Attach 1.10-1, Pages 1.10-73f, 1.10-73h, 1.10-73j,

1.10-731,
1.10-73m 1.10-73i Table 3.9B-2*

9B.4-1 through 9B.4-8 Fig. 9B.4-1 and 9B.4-2 SS SS SS Update FSAR to incorporate changes from containment isolation dependability study Reference NUREG-0737 Update of new loads Revised systems used for safe shutdown based on Appendix R

audit

  • Table 3.9B-2a pg.

2b 2G 2d 2e 2f pg.

2g 2h pg.

21 pg.

2+ pg.