Mgt Meeting Rept 50-220/85-05 on 850424.Major Areas Discussed:Licensee Response to Independent Appraisal Required by 840320 Order.Viewgraphs Encl
ML17054B742
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1985
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17054B741 List:
References
50-220-85-05-MM, 50-220-85-5-MM, NUDOCS 8507180337
Download: ML17054B742 (48)


See also: IR 05000220/1985005

Text

~

~

e

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 85-05

Docket No. 50-220

Licensee

No.

DPR-63

Priority

Category

C

Licensee:

Nia ara

Mohawk Power Cor oration

300 Erie Boulevard

S racuse

New York

13202

Facility Name:

Nine Mile Point Nuclear Station

Unit

1

Meeting Location:

US

NRC

Re ion I

Kin

'of Prussia

Pa.

Meeting Conducted:

A ril 24

1985

Approved by:

J.

.

i

i le, Jr.,

C ief, Projects

S c

on 2C, Divisio

of Reactor

jects

da

e

Mana ement Meetin

on

A ril 24

1985

Re ort No.

50-220/85-05

~Sommar:

A management

meeting

was convened

by NRC, Region I management

to

discuss

the licensee's

response

to the independent

management

appraisal

required

by the Order dated

March 20,

1984.

The licensee

reviewed its actions to date

and provided

a detailed

schedule for completion of the actions required to

implement the appraisal

recommendations.

8507186337

gib<>718

PDR

ADOCK 05000220

8

'FDR'-'

~

~

~ t

l .I

~

~

DETAILS

1.

Attendees

Nia ara

Mohawk Power Cor oration

W. Donlon, President

B. Hooten,

Executive Director, Nuclear Operations

C. Mangan,

Vice President,

Nuclear Engineering

and Licensing

T.

Lempges,

Vice President,

Nuclear Generation

,T.

Roman, "Station Superintendent

D. Palmer,

Manager,

Nuclear Quality Assurance

C. Stuart, Assistant to Executive Director

Mana ement Anal sis

Cor oration

H. Worsham,

Consultant

U.S. Nuclear

Re viator

Commission

T.

Mur ley, Regional Administrator

R. Starostecki,

Director, Division of Reactor Projects

(DRP)

S. Collins, Chief, Projects

Branch

No. 2,

DRP

L. Bettenhausen,

Chief, Operations

Branch, Division of Reactor

Safety

J. Linvilie, Chief, Projects

Section

No.

2C,

DRP

S.

Hudson,

Senior Resident

Inspector,

NMP-Unit 1

R.

Gramm,

Senior Resident

Inspector,

NMP-Unit 2

2.

Discussions

On March 20,

1984,

the

NRC issued

an Order to the licensee

which required

that

an independent

management

appraisal

be performed at Nine Mile Point,

Unit

1 and the corporate office. The appraisal

recommended

specific

actions to enhance

the management

controls of corporate

and station

activities.

On February

1,

1985,

the licensee

submitted to NRC,

Region I

its review of the appraisal

recommendations

and proposed

action plans to

implement the recommendations. It also included explanations for those

items the licensee

chose

not to implement.

On April 24,

1985,

the licensee

met with NRC, Region I management

to

discuss

the status,

schedule,

and tracking of the action plan items.

The

meeting

was requested

by NRC, Region I. The licensee

presented

additional

details

regarding

the administration

and control of the action plan items

as indicated

by Attachments

A and

B provided by the licensee.

Extensive

senior

management

involvement was included in the formulation of the

action plan items.

Continued involvement is assured

through

a Management

Steering

Committee which must review the acceptability of each

item prior

to final acceptance

by the Executive Director of Nuclear Operations.

The

licensee

also explained its schedule for completion of the individual

items. Actions for most items were

i,n progress.

~

~

S

h

/

E

~

~

I'f

p

~

'l t

3

3.

Conclusion

The

NRC found that the licensee's

schedule for implementation is accep-

table

and that the licensee

had met the requirements

of the Order. It was

determined that

no additional periodic meetings with the licensee will be

required at this time.

Further review of the licensee's

actions will be

conducted

as part of the routine inspection

program.

~ ~

NIAGARA MOHAWK ATTENDEES

APRIL 24, I985

10:00 MEETING WITH NRC REGION

I

W. Z.

(BILL) DONLON

B.

G. (BILL) HOOTEN

T. E.

(TOM) LEMPGES

C.

Y.

(CHUCK)

MANGAN

C. L. (SKIP)

STUART

T.

W.

(TOM) ROMAN

D. R.

(DAVE) PALMER

PRESIDENT

EXECUTIVE DIRECTOR-NUCLEAR

OPERATION

V.P.

NUCLEAR GENERATION

V.P.

NUCLEAR ENGINEERING 6

LICENSING

ASST.

TO THE EXECUTIVE

DIRECTOR-NUCLEAR

SUPT.

NINE MILE POINT UNIT 1

MANAGER-QUALITYASSURANCE

H. Z.

(HERB)

WORSHAM

CONSULTANT (MAC)

r.

~

~

MEETJNG GOALS

MEFTING GOALS

DISCUSS

t'JMPC

RESPONSE

TO

NRC ORDER.

DISCUSS

NRC REQUIREMENTS

FOR

MONITORING

IMPLEMENTATXON OF

t'JMPC

ACTXONS AS

DEEMED t'JECESSARY

ESTABLISH EFFECTIVE COMMUtlICATIONS AND POIt'JTS

OF

CONTACT BETWEEI'l OUR

ORGAf'JIZATl'Ot'JS

CLEARLY IDENTIFY ANY tlRC CONCERt'JS

WHICH MAY EXIST

RELATIVE TO ACTXON PLAN

OP,

ANY OTHER

NMP.1 MATTER

If'JTRODUCE THE TRANSITIOJ'l ORGAf'JX7ATIONAL PLAl'l (TOP)

'

~ ~

AGENDA

1.

INTROOUCTION

BILL OONLON

2.

HISTORY - RELATEO PROGRAMS

BILL HOOTEN

3.

UNIT

1 - PROCESS/PROGRESS

SKIP STUART

HIGHLIGHTS

A.

INVOLVEMENT OF MANAGEMENT

BILL HOOTEN

B.

COMMUNICATIONS WITH

OPERATIONS/STAFF

.

C.

TRANSITION ORGANIZATIONAL

PLAN

TOM ROMAN

BILL HOOTENI

CHUCK MANGAN

S.

SUMMARY

BILL OONLON

I

HlSTOR Y

RECEIVED REPORT

ASSIGNED RESPONSIBILITIES-

LOCAL ACTIONS STARTED

SEPT. 9,

1989

SEPT.

19

FORMED MANAGEMENT STEERING

COMMITTEE (0.0.

TASK FORCE

DUTIES)

OCT.

2

STUDIED REPORT IN DETAIL

RECEIVED PRELIMINARY ACTION

PLANS 6 SCHEDULE/RESOURCE

INFO.

LATE OCT.

LETTER

TO

NRC

ANALYSIS/RESPONSE/SCHEDULE

FEB. 1,

1985

RECONSTITUTED STEERING

COMMITTEE

MAR. 1'l

~

~

~ '

'

~

~

MANAGEMENT STEERING

COMMITTEE (ODTF)

PT

8.

G.

HOOTEN

C.

V.

MANGAN

T. E.

LEMPGES

Z. A.

PERRY

T. Z.

PERKINS

C. L.

STUART

R. B.

BURTCH

A.

FREEDMAN

EXECUTIVE DIRECTOR

VICE PRESIDENT. - ENGINEERING 6

LICENSING

VICE PRESIDENT - NUCLEAR GENERATION

DIRECTOR - QUALITY ASSURANCEA

GENERAL SUPERINTFNDENT - NINE MILE

POINT UNIT i

ASSISTANT TO THE EXECTIVE DIRECTOR

MANAGER - NUCLEAR INFORMATION

SERVICES

MAC 0.0.

CONSULTANT

CONSULTANTS:

WORSHAM.

LERNER

MAC

1

'

II

t

~

~

CURRENT

C. L. STUART

C.

V.

MANGAN

T. E.

LEMPGES

Z. A.

PERRY

S.

F.

MANNO

M. P.

RANALLI

T. Z.

PERKINS

'R. B.

BURTCH

A. P.

BALENO

CHAIRMAN

VICE PRESIDENT - ENGINEERING 6

LICENSING

VICE PRESIDENT - NUCLEAR GENERATION

DIRECTOR - QUALITY ASSURANCE.

VICE PRESIDENT'-

PURCHASING

VICE PRESIDENT - ENGINEERING

GENERAL SUPERINTENDENT

NINE MILE

POINT UNIT 1

MANAGER - NUCLEAR INFORMATION

SERVICES

NMP-2 PROTECT

MANAGER

ADMINISTRATION/SERVICES

CONSULTANTS:

FREEDMAN, LERNER,

WORSHAM

~

~

I

V

RELATED PROGRAMS

MSC -

MANAGEMENT STEERING COMMITTEE - ADVISORY

COMMITTEE TO THE EXECUTIVE DIRECTOR NUCLEAR

OPERATION

UNIT 1 ACTION PLAN

TOPSC -

STEERING

COMMITTEE FOR

THE TRANSITION

ORGANIZATIONAL PLAN (TOP) - CHAIRED BY THE

EXECUTIVE DIRECTOR

NUCLEAR OPERATION

PCP -

PLANT COMPLETION PLAN - UNIT 2 ACTIVITIES

NECESSARY

TO COMPLETE CONSTRUCTION/TESTING 6

LOAD FUEL

COP -

COMMERCIAL OPERATIONS

PLAN UNITS

1

6 2

ACTIVITIES NECESSARY

TO ACHIEVE COMMERCIAL

OPRATION OF UNIT ¹2

(FUEL LOAD TO COD)

INCLUDING POST C.O.

WORK EFFORTS

UP TO AND

INCLUDING THE FIRST REFUELING OUTAGE

OMC -

OPERATIONS

MANAGEMENT COMMITTEE UNIT 1

COMMITTEE CHAIRED BY STATION SUPERINTENDENT

TO ADDRESS SHIFT ORGANIZATION/COMMUNICATION

'

~

UNIT 1

ACTIVITIES:

GNBINED

ACTIVITIES:

UNIT 2

ACTIVITIES:

TRANSITION 06RANIZATIONALPLAN (TOP)

UNIT 1 ACTION PLAN

COOERCIAL OPERATIONS PLAN

PLANT GNPLETION PLAN

UNIT 1

UNIT 2

UNIT 2 POST-CO

MORK IN

PREPARATION FOR 1ST OUTAGE

PLAN INTERRELATIONSHIPS

h

~

~

~

E

MANAGEMENT INVOLVEMENT

BILL DONLON

PRESIDE

JIN PERRY

DIR,

QA

f IBR NSC

NBR TOPSC

BILL HOOTEN

EXECUTIVE DIRECTOR

CHAIR TOPSC

BOB BURTCH

NGR.r

NUC,

PR

NBR NSC

SKIP STUART

ASST TO EX, DIR,

PN UNIT 1 ACTION

CHAIR NSC

CHAIR

(EX SRO

1)

VP NEaL

ttBR NSC

NBR TOPSC

TON LPPGES

VP GEN.

NBR f%C

f'tBR TOPSC

DEAN QLPK

%2 PROJECT DIR.

TON LENPGES

ACT, GEN,

SUPT.

TONY BAIL%

NGR.

PROJ ADNIN/SERVICES

NBR NSC

NBR TOPSC

SUPT UNIT 1

ACI. CHAIR SORC

CHAIR ONC

(EX SRO FITZPATRICK)

~

~

4

i

TRANSITION ORGANIZATIONALPLAN

'B.

G.

HOOTEN

C.

V.

MANGAN

T. E.

LEMPGES

O'.

A.

PERRY

Z. T.

ASH

A. P.

BALENO

C. L. STUART

EXECUTIVE DIRECTOR - NUCLEAR

OPERATION

VICE PRESIDENT - ENGINEERING 6

LICENSING

VICE'RESIDENT - NULCEAR GENERATION

DIRECTOR - QUALITY ASSURANCE

ADMINISTRATIVE ASSISTANT TO THE

PRESIDENT

MANAGER-PROTECT

ADMINISTRATION/SERVICES

ASSISTANT TO THE EXECUTIVE

DIRECTOR-NUCLEAR

~

CHAIRMAN

CONSULTANT - A.

FREEDMAN - ORGANIZATIONAL DEVELOPMENT

4

\\

0

0

0

TRANSITION ORGANIZATIONALPLAN

SUMMARY OF MILESTONES

p

ESTABLISH AND OPERATIONALIZE TOP STEERING

COMMITTEE

COMPLETE DEVELOPMENT OF NUCLEAR DIVISION

(ND) ORGANIZATIONAL STRUCTURE

TO SUPPORT

OPERATIONAL READINESS

REVIEW. MODIFY (IF NECESSARY)

AND

INTEGRATE EXISTING PROCEDURES

COORDINATE THIS PLAN WITH ALL RELATED

PLANNED TRANSITION EFFORTS

DEVELOP ROLE DESCRIPTIONS

FOR

EACH KEY

POSITION

ASSESS

KEY PERSONNEL

MATCH INDIVIDUALSWITH POSITIONS

(ALL

LEVELS)

IMPLEMENT PERSONNEL TRANSITION

V

SUMMARY

NMPC VIEWS THE NRC ORDER. ANO THE RESULTNG UNIT

NO. i ACTION PLAN AS AN IMPORTANT PART OF

OUR

EFFORTS

TO ACHIEVE EXCELLENCE IN OUR NUCLEAR

OPERATIONS.

MANY SIGNIFICANT LONG-TERM ACTIONS ARE UNDERWAY

TO EFFECT CONTINUING IMPROVEMENT.

NINE MILE POINT WILL BECOME A TWO-UNIT OPERATING

STATION DURING f986.

ACTION PLANS ARE UNDERWAY

TO EFFECTIVELY ADDRESS. THIS TRANSITION.

NMPC INTENDS TO CONTINUE ITS EFFORTS

TO EFFECT

IMPROVED COMMUNICATIONS INTERNALl Y AND WITH THE

NRC THROUGH ACTIVE MANAGEMENT INVOLVEMENT.

NMPC WOULD APPRECIATE CONSTRUCTIVE DIALOGUE

REGARDING ANY CONCERNS

NRC MAY HAVE RELATIVE TO

OUR

NUCLEAR OPERATIONS.

(

t

~

~

EVALUATIN

RECCf'I EHDATINS

SIEERING Gf'f1ITfEE

REVIEW a ASSIGtKNtS

ACTION ITEN

PLAN

IL

ACl ION I IEH

DECUTIN

I

I

REPORTS

'IOGRESS

L

PRDJECT I'iAIKPENT

SIEERING KNITfEE

REVIEW

ACTIN ITEN

CIPLETIN

NCaV

REVIEW

SIEERING

CMITIEE

APPKVAL

B, G. KOTEN

APPiIVAL

I

I

I

I

O.

~l

I

fTI

>

ACTION 1TH'

OPEN

ACTIN ITH'I-

CLOSED

N. H, P. 1

EVALUATION ACTION

PLAN

ACT ION

ITEN

PROGRESS ION

Ap raisal Action Items

Item

Huaber

4.2.2

4.2.3A

4.2.38

4.2.3C

4.2.3D

4.2.4A

4.2.48

4.2.4C

4.2.4D

4.2.4E

4.3.1A

4.3.1B

4.3.1C

4.3.10

4.3.1E

4.3.2A

4.3.2B

4.3.2C

4.3.2D

4.4.1

NMPf1 EVALUATION ACTION PLAN

NUCLEAR ACTION ITEHS

Task

~Deeeri

tenn

Carry Out E.A.P. Program

Oev. Config. Hgmt; Sys.

5 Implement Plan

Provide Resources

to Complete E.A.P.

Action to Assure Proj. Records Entry

Review

O List, Assure Proper Entry

Prep.

Spec. for As-Built Walkdowns

Prep.

Walkdown Procedure

Prep.

Walkdown Schedule

. Provide Walkdown Training

r

Obtain Owgs.

From Past Contractors

Revise

and Issue

AP-6

Factor in Unit 2 Oper.

8 Maint. Planning

Keep Unscheduled

Outage Planning Current

Include Engrg/Support

Work in Outage Planning

Reduce

Outage Control

Rm. Congestion

Ensure As-Built Program Procedure

Needs

Est. Clear Procedure

Policy

Procedure Policy Training, Enforce

Use

Periodic Cks. of Controlled Procedures

Eval.

IIA/GAP Programs Against Reg.

Reqmnts.

Prime

Contact

Hangan

Hangan

Hangan

Hangan

Hangan

Hangan

Mangan

Hangan

Hangan

Hangan

Drews

Roman

Roman

Roman

Roman

Roman

Roman

Roman

Balduzzi

Palmer

Responsible

Enrnlneer

Gresock

Gresock

Gresock

Gresock

Wilczek

Gresock

Gresock

Gresock

Gresock

Gresock

Orews

Dahlberg

Roman

Roman

Roman

Roman

Drews

Zollitsch

Balduzzi

Palmer

Assigned

Per sonnel

Beijen-Lukens

Gresock

Bei)en-Luken

Joyner

Mazzaferro

El

Kel 1 erman

Kel 1erman

Kel 1 erman

Ke1 1 erman

Ke1 1 erman

Ke 1 1 erma

1

Action Item No.:

4.2.2

Niagara

Mohawk Power Corporation

Nine Mile Point Unit

1

Evaluation Action Plan

Task Responsibility:

Gresock

Scheduled

Completion Oate:

4/86

Status

Oate:

4/11/85

Page

1

of

2

I.

A raisal Action Item

Complete the Engineering

Assurance

Program in a timely manner.

II.

Anal sis

and

Res

onse to

NRC

Niagara

Mohawk s Engineering

Assurance

Program

has

been ongoing.

Initial scoping,

scheduling

and task assignments

have

been

completed

and detailed

work is in

progress.

This includes the establishment

of long-range

ongoing programs,

such

as

incorporation of as-built drawings from plant modifications

as discussed

in

Items 4.2.4.

III.

Current Status

See attached

IV.

Steerin

Committee

Recommendation

Action

06380

Action Item No.:

4.2.2

Niagara

Mohawk Power Corporation

Nine Mile Point Unit

1

Evaluation Action Plan

Task Responsibility:

Gresock

Scheduled

Completion Date:

4/86

Status

Date:

4/11/85

Page

g

of

g

III.

Current Status

Nuclear Engineering is proceeding with the Engineering

Assurance

Program.

The

system descriptions

being developed within the program are targeted to be complete

by the end of 1985.

That target

appear s to be attainable

at this time and may, in

fact,

be improved.

Procedures

being developed

by Nuclear Design are currently targeted for June

1985.

General

Physics Corporation

has

been contracted to develop these

procedures.

In addition,

a committee

has

been formed within Nuclear

Engineering

to review all procedures

to ensure consistency.

The initial efforts by the various disciplines

have indicated

a certain

amount of

misunderstanding

as to the intent of the standard specifications.

Due to the

assignment of an experienced quality assurance

engineer to Nuclear Engineering for

reviewing those standard specifications,

many of those

issues

have

been resolved.

The overall schedule of June

1985 is currently being reassessed.

The priority is

now being placed

upon specifications

which will be required for the Unit

1

1986

outage.

Those will be completed

as to coincide with the need date for the

specification.

The schedule for th'e remaining specification will be developed

by

April 30,

1985.

The design criteria section of the Engineering

Assurance

Program is proceeding

on

schedule.

The primary attribute is the seismic design criteria.

That is

currently under development

and is proceeding well.

C. L. Stuart, Project Mgr.

Date

06380

Ap'proved:

B.

.

ooten

ate

~

~

II

~

E

O'P ¹l

,EVALUATIONACTION PLAN

3,0 ORGANIZATIONAL

SIRlKTlSE a

RESPONSIBILITIES

3,1 OVERAU

3.1.1

IZI

3 1.2A

B

C

3,2 ENGINEERING

321

Kl

3,2,2A

B

C

C5

3.2,4A

B

C

3,3 OPERATIONS

3.3,2A

3,4 GA/GC I

4.0 llANAGHKA'ONIROLS

4,1 OVERALL

4,1.3A

B

C

4.1.2A IXI

B

ling

1,3A

B

'C

4.1.4A

B

C

D

4 2 ENGINEERING

42 1A Kl

B

EK

I2g

4 2,3A

B

C

D

4,2,4A

B

C

D

E

4.3 OPERATIONS

4.3.3A

B

C

D

E

4.3.2A

B

C

D

5,0 KIUNICATIONS

5,3A

B

C

D

5,2A

B

C

D

6.0 NNAGPBIT PRACTICES

6.1

6,2A

B

C

D

E

6,3A

7,0 lNIT ¹2 INIEGRATION

~7,5A

B

C

D

8,0 TRAINING

81A g

8.2A

4,4 GA/QC

4.4.1

Kl

4.4.2

%3

STATUS SU%8Y AS OF; 4

Z3/d5'3T

STAMED

Kl

IN PROGRESS

ill'VPLEIE-WAITINGNCaV REVIEW

~ C%

WAITING KNITIEE NVROVAL

89

CU3SED

5g =47

IZl =(2

C5 =ZI

M =0

TOTAL 89

C'

PROJECT

EVAP

PLOT

PRELIM

RUH OATE

17APR85

NMPrl

EVALUATION ACTION PLAN

ACTION Ill'M MASTER SUMMARY SCHEOULF.

ACARA

0

A'IIK POHER

COR

OR

0

MODE C/FE

NT 'R

AL<

ISI

PROJECT/2

84A2

A

C

CRAP

CS

0

SNEI'.T

I

1985

I986

A

M

J

J

A

S

0

N

0

J

F

II

A

M

J

J

A

S

0

3.0

ORGANIZATION STRUCTURE

& RESP

~

P.

OVERALL

2

~ 3.

FHCIHEI:.RING

3

~ 3.3

OPERA

IONS

M3 ~

OA/

4.0

MANAGEMENT

CONTROLS

I

~ 4.4

OA /

5 '

COMMUNICATIONS

I - S.l

COMMUNICATIONS

2

u 5,2 EXTI'RNAL ORGANIZATIONS

6.0

MAHAGEMENT PRACTICES

7.0 UNIT r2

INTEGRATION

v 7, <<7.5

NMPr2 ACTIVITI IHTCRTN.

2

~ 7. -7.5

DEVA PLANNINC HORK PKGS

3

~

7 ~ -7 'C

SR

MCMI PARTICIPATION

7 ~ -7'0

SNARE

PROCI'.SS

ANO PLANS

8.0

TRAINIHG

I

~ 8 '

GENERAL

2

~

8 2 RFOUAL/OPERATIONS

STATUS DATE:

II/15/85

NORKIHG SCHEOULF.

L EGEND

-:- MILFSTONE

e

4

PROJECT

EVAP

PLOT

PRFLIM

RUN

OATF

)8APR85

NMPNI

EVALUATION ACTION PLAN

< 4.0

MGMT CONTROLS

ACTION

I TFM SUMMARY SCHEDULE

MODE C/FF

NIAGARA MOHAWK POWER

CORPORATION

INTFRVAL:

I

MONTH(S)

PROJFCT/2

84A2

BAR CHART GRAPHICS"

PAGF

)

SHE('.T

I

1985

1986

A

M

J

J

A

S

0

N

0

J

F

M

A

M

J

J

A

S

0

4

I

>

MGMT CONTROLS

(OVERALL)

I "

4

~

~ I

PLANNING

4,

SCHEDULING

2

~ 4.

~ 2

PROCFDURES / POLICIES

4.

.0

DOC.

CNTL /

RECORD

MGMT

4 "

4

~

~ 4 SAFFTY REVIEW FUNCTIONS

4

2

<

MGMT CONTROLS

(ENGRNG)

I

"

4 2. I

PLANNING h

SCHEDULING

2

~

4 '

'

ENGINEERING ASSURANCE'

2.3

CONFIGURATION MGMT

4

=

4 '

'

AS BUILTS

4

3

MGMT CONTROLS

(OPERATIONS)

I

~ 4.3.)

PLANNING

h

SCHEDULING

2

= 4.3.2

PROCEDURES

4.4

>

MGMT CONTROLS

(OA /

OC)

I "

4 4.1

OA/OC PROCFDURES

2

M

4 '

'

OA/OC ACTIVITIFS

STATUS DA'tE:

4/15/85

WORKING SCHEDULF.

MILFSTONE

~ ~

4'

S

'

~RO IECT PRl IOI

NIIPNI EVALUAT10tl ACI'lON PLAN 1TFH 4

~ 2.2

(E h.P)

I'LOl'URREN'T

ACT10tl 1TFH OETAlLEO SUII,"IART SCHEO

tlQDE (/FF.

RUN

OATF.'

7APRSS

NlAOARA tIOHAWK POWER

CORPORATlON

INTFRVAL:

I

HQNTH(SI

PROJECT/2

G<A2

BAR CHART GRAPIIICS

PAGE

I

SHEET

I

1984

1985

1986

A

S

0

N

0

J

F

M

A

M J

J

A

S

0

N

0

J

F

M

A

SAFEI'Y RELATf:0 SYSTf II DESCRIPT I ONS

DESIGN

CRI TERI A

S T ANDARO

SP f:CIF CATIONS

't

EN

I NEf:R I NG

PROCEOURf.'S

ELECTRI

AL DESIGN GUIOELINf.'S

PROGRf.:SS

WORKING SCH

DATA

DATE

LEGEND

".llLESTONE

TARGET

STATUS DAK:

4/15/85

~ Pg

4

sg

PROJECT

STSOES

PLOT

SAFFTT

RUN OAIF

ISAPRC5

SSWIART

T A R 0

T

SCNEOULE

S g.2

IE ~ A Pl

~ S/R STSTEN DESCRIPTIONS

ACflOR lfftlOETAILEO SCNEOULE

OIIFR CORPORATIOTI

SORT

COO 5 5ST

NI ACARA ITOTIAQTT P

NOOE f/FE

INTFRTAL~

I

tTOPITN ISl

PROJECT/R

S<AR

OAR CHART CRAPNICS

PACF

I

SNEFT I

1984

I 985

I986

CORE

SPRAY

SYSTEN

~

BIER COOLING SYSTQI

RX RECIRC SYSTKtl

LIOUID POISOH

SYSTEN

tlhIH STEAN SYSTKN

30AUGSS

A

S

0

II

0

J

F

tf

A

tf

J

J

A

S

0

II

0

J

SDEC84

V

A

A

GGLOOY

65

900

0

F.S

60C 64

9A

COHTAIHtIEHT SPRAY SYSTBI

REACTOR PROTECTIOH. SYSfFtl

90C

IIFEBSS

9AP

5

SNAYSS

FKKOIIATER/NPCI SYSTEtl

AUtO OEPRESSURIZATIOH

SYSff.'N

CONTROL ROO DRIVE SYSTEN

CLEANUP SYSTEtl

SHUTDOWN COOLIHG SYSTEN

RBCLC SYSTEN

BREATHING 6

IHST AIR SYSTEtlS

ENER VEHflLATION SYSTBI

CONTROL ROOtl VEHflLATIOH SYS'fFN

SPENf

FUEL POOL SYSTBI

SPENT

FUEL POOL COOLIHO SYSTFN

DIESEL GENKRATORS

RENOTK SNUfDONN STSTBIS

3SSKVG

IISKVG 6

AC DIST

SYSTFtlS

SSVOC ~

ISOV/UPSY

S

OC DISTTSfEtlS

SAFETY RELATED SYSTBIS COtlPLEfK

I IFEBSS

SSNARSS

SAPRSS

.'

ION

I Otl

30APRSS

ISNAYSS

I I IJUN85

YSS ~16JUL85

185~ ISJUL85

IIJUN55~ 20AUGSG

YIJUH85~ GOAUG85

22JUL85~ SSIEP85

22JUL85~

200185

2STP65~

SNOVSS

GSEPSG~

5HOVSG

100165~ IOOECS ~

100185~ ICCEC85

I IIICG85~ I IJAIISS.

IIHOVSG~ IIJAHS6

~ISJAHSS'

GEN

TARGET GCII ~

IIILEEISIIE

PROGRESS

TARGET NILEETONE

T

DATA

OATK

V

1

r>

t