Forwards Insp Rept 50-410/85-10 on 850319-0426 & Notice of Violation
ML17054B724
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/12/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17054B725 List:
References
NUDOCS 8506260529
Download: ML17054B724 (4)


See also: IR 05000319/2004026

Text

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN: Mr. William G.

Hooten

Executive Director-Nuclear Operations

c/o Miss Catherine Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

No. 50-410/85-10

This refers to the routine inspection

conducted

by Mr.

R. A.

Gramm and

R.

M.

Wheeler of this office on March

19 to April 26,

1985 at Nine Mile Point, Unit 2,

Scriba,

New York of activities authorized

by

NRC License

No.

CPPR-112

and to

the discussions

of our findings held by Mr. Gramm with Mr. C.

Beckham

and other

members of your staff at the conclusion of the inspection.

Areas

examined during this examination

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter. Within these

areas,

the

inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Additional inspection

was performed to ascertain

the adequacy of the Spent

Fuel

Pool gates.

It was found that sufficient actions

have

been initiated at

the site to ensure

the final quality of the gate weldments.

However, the

onsite corrective actions

were initiated after an allegation identified

potential

problems

regarding

the gate weldments.

The allegation therefore

was

valid as the vendor Quality Control

and Procurement Quality Assurance

functions did not identify the deficiencies prior to shipment to the site.

Based

on the results of this inspection, it appears

that one of your activities

was not conducted

in full compliance with NRC requirements,

as set forth in the

Notice of Violation, enclosed

herewith

as Appendix A.

This violation has

been

categorized

by severity level in accordance

with the

NRC Enforcement Policy (10 CFR 2, Appendix C), published in the Federal

Register

Notice (49 FR 8583) dated

March 8,

1984.

You are required to respond to this letter and in preparing

your response,

you should follow the instructions

in Appendix A.

During the cour se of this inspection,

the conduct of the Reactor Coolant System

hydrostatic test

was closely monitored.

Our pre-test

review of the test pro-

cedure identified several

inaccuracies

that were not found during your

technical

review of that procedure.

We expect that'future pre-operationa'l

test

procedures s(ill be subject to enhanced

technical

reviews prior to their

approval.

We intend to closely monitor the effectiveness

of your actions in

this regard.

8506260529

8506i2

PDR

ADOCK 050004i0

8

PDR

OFFICIAL RECORD

COPY

IR NINE MILE PT2 85-10

0001.0.0

05/07/85

S

0

r

Niagara

Mohawk Power Corporation

0

The responses

directed

by this letter

and the accompanying

Notice are not sub-

ject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

. Your cooperation with us in this matter is appreciated.

Sincerely,

0

OriBlnal Sfgaeg p

Samuel

J

~ Collins, Chief

Projects

Branch

No.

2

Division of Reactor Projects

Enclosure:

Region I NRC Inspection

Report

Number 50-410/85-10

cc w/encl:

Connor

& tlltetterhahn

John

M. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

Chief, Engineering

Programs

Branch

J. Linville, Section Chief,

DRP

J. Grant,

DRP

State

Liaison Officer (SLO)

M. Haughey,

NRR/LPM

E.L. Jordon, Director, Division of Emergency

Preparedness

and Engineering

K. Christopher,

RI:OI

I:DRP

Gramm/gcb

5/Q/85

I:DRP

PB

i vi le

Q)iu

$ g

sfloll55

0

OFFICIAL RECORD

COPY

IR NINE MILE PT2 85-10 - 0001.0.1