ML17054A013
| ML17054A013 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/11/1983 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17054A014 | List: |
| References | |
| NUDOCS 8308240462 | |
| Download: ML17054A013 (4) | |
See also: IR 05000410/1983006
Text
+~ Rtey+
~c~
PO
+
C1
~
0c
v
CI
V/~
o~
+a**+
Docket No.
50-410
UNITED STATES
NUC
R REGULAiTORYCOMMISSION
REGION I
OS1 FARK AVKNUK
KINC OF FRUSSIA, FKNNSYI.VANIA104IIS
AOG 2> ]g83
Niagara
Mohawk Power Corporation
ATTN:
Mr. Gerald
K. Rhode
Senior Vice President
System Project Management
c/o Miss Catherine
R. Seibert
300 Erie Boulevard,
West
Syracuse,
13202
Gentlemen:
Subject:
Inspection
No. 50-410/83-06
This refers to the routine safety inspection
conducted
by Mr. L.
R. Plisco of
this office on May 16 - June
1,
1983, at Nine Mile Point Station, Unit 2,
Scriba,
New York and Stone
and Webster Engineering Corporation,
Cherry Hill,
of activities authorized
by
NRC License
No.
CPPR-112
and to the
discussions
of the findings held by Mr. Pli sco with Mr. K. Ward, Mr. W. Baker,
and other members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the
NRC Region I Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection
consisted
of selective
examinations of procedures
and representative
records,
interviews. with personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted in full compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith
as Appendix A.
This violation has
been
categorized
by severity level in accordance
with the
NRC Enforcement policy ( 10 CFR 2, Appendix C) published in the Federal
Register Notice (47 FR 9987) dated
March 9,
1982.
Yod are required to respond to this letter and in preparing
your response,
you should follow the instructions in Appendix A.
In accordance
with 10 CFR 2.790(a),
a copy of this letter
and the enclosures
will be placed in the
NRC Public Document
Room unless
you notify this office,
by telephone,
within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application
must
be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your. intent to request
withholding, or any request for an extension of the 10-day period which you
believe necessary,
should
be
made to the Supervisor,
Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
The responses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
PL 96-511.
Niagara
Mohawk Power Corporation
0
Your cooperation with us in this matter is appreciated.
Sincerely,
Thomas T. Martin, Director
Division of Engineering
and
Technical
Programs
Enclosures:
l.
Appendix A, Notice of Violation
2.
NRC Region I Inspection
Report
No. 50-410/83-06
cc w/encls:
Connor 4 Metterhahm
NMPC'A
Di,rector,
Power Division
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resi'dent Inspector
State of New York