ML17053D054
| ML17053D054 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/09/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053D055 | List: |
| References | |
| NUDOCS 8202250259 | |
| Download: ML17053D054 (4) | |
See also: IR 05000410/1981014
Text
FN~ 9 188R
Docket No. 50-410
IZ84 FIMCO~
Niagara
I'lohawk Power Corporation
ATTN:
Nr. Gerald
K. Rhode
Vice President
System Project management
c/o Hiss Catherine
R. Seibert
300 Erie Boulevard Hest
Syracuse,
13202
Gentlemen:
Subject:
Inspection
No. 81-14
g
g(x
<Itfi~o
5
8y,~ g
]98
~ca
@itjar +~818)y
Wl gjlyg 'egg)
p~Pgy ~
44'his
refers to the routine inspection conducted
by Hr. R.
D. Schulz of this
office on December 21,
1981 to January
15, 1982, at Nine Nile Point, Unit 2,
Scriba,
New York of activities authorized
by NRC License
No.
CPPR-112
and to
the discussions of our findings held by Nr. R.
D. Schulz with members of your
staff at the conclusioq of the inspection.
Areas examined during this inspection are descr ibed in the Office of Inspection
and Enforcement Inspection
Report which is enclosed with this letter.
Within
these areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the
inspector.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted in full compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith as Appendix A.
This item of noncompliance
has
been categorized
into the levels described
in the Federal
Register Notice
(45 FR 66754) dated October 7, 1980.
You are required to respond to this letter
and in preparing your response,
you should follow the instructions in Appendix A.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room unless
you notify this office,
by telephone, within ten days of the date of this letter and submit a written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(l).
250259 820209
ADQCK 050004i0
OFF IClAL R ECO R 0 COPY
P
pgp
oFFIGE
8, DRPI
'<<R
RI
$ QR
E
Schul z
K ster
Bru ner
OATA Q ~~-,- ~---.
~ .8$AY2 .........5 j9......
8202
USGPO: 1881~<<r888
>v
1~
~
4
s
IL
F88 Og ~gyp
Niagara ttohawk Power Corporation
~ 2
4
Your cooperation with us in this matter is, appreciated.
Sincerely,
. LQ
Oi~ugaedBf~
Richard
1<. Starostecki,
Director,
~RJHvision of Resident
and Project
Inspection
Enclosures:
l.
Appendix A, Notice of Violation
2.
Office of Inspection
and Enforcement Inspection
Report Number 50-410/81-14
cc w/encl:
Leonard N. Trosten,
Esquire
Carl
D. Hobelman,
Esquire
NIIPC gA
Public Document
Room
(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Chief, Operational
Support Section
(w/o encls)
OFFICEI
SURNAME/
DATE Q
~ ~ ~ ~ ~ ~ 0 ~I~ 0 ~ 0 ~ 0 ~ Otito ~ ~ ~
~ ~ ~ ~ 0 ~ 0 ~ 0 ~I~ 0 ~ ~ ~ ~ ~ 1 ~I~ 0 ~
~ 0 ~ ~ ~i~ 0 ~ 0 ~ ~ IWto~ OO ~ 00 ~
~ ~ ~ ~ ~ ~ 0 ~ ~I~ OI ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ 1 ~
~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~I ~
~ ~ ~ 0 ~ ~ ~ ~ ~ ~
~ ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ ~ P
~ ~
~ 0 ~ 0 ~ 0 ~ ~ ~ ~Itic~ 0 ~i~ ~ ~
~ ~ ~ ~ Oi ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ 00 ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ 0
NRG FORM 318 (10-80) NRCM 0240
OFFICIAL RECORD COPY
USGPO: 1981~960
t
"po
g 0 8$
Jf
tl
a-
r
0\\
th)
v=
spa
1