Notice of Violation from Insp on 811221-820115
ML17053D056
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/09/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17053D055 List:
References
50-410-81-14, NUDOCS 8202250265
Download: ML17053D056 (4)


Text

APPENDIX A NOTICE OF VIOLATION Niagara Mohawk Power Corporation Nine Mile Point, Unit 2 Docket No. 50-410 License No.

CPPR-112 As a result of the inspection conducted December 21, 1981 to January 15, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 {October 7, 1980), the following violation was identified:

A.

10CFR50, Appendix B, Criterion V states, in part, "Activities affecting quality shall be prescribed by documented instructions, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."

The Nine Mile Point Nuclear Station, Unit 2, PSAR Appendix D adopts the Stone 8 Webster Nuclear guality Assurance Program which invokes Construction Methods Procedure Manual, Section No. 6, as a required implemented document for the Nine Mile Point, Unit 2, site, and requires in CMP 6.2-5.78, Structural Welding, paragraph 5, and CMP 6.4-5.78, paragraph 6, that Construction Completion Checklists be prepared and completed in order to provide a documented surveillance of welding and weld material control by construction supervision.

Contrary to the above, Construction Completion Checklists had not been prepared and completed for Gives Steel Corporation and Schneider Power Corporation as required by CMP 6.2-5.78, and none of the contractors had prepared and completed the Construction Completion Checklist as required by CMP 6.4-5.78.

This is a Severity Level V Violation (Supplement II).

Pursuant to the provisions of 10CFR 2.201, Niagara Mohawk Power Corporation is hereby required'o submit to this office with thirty days of the date of this

Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved;

2) corrective steps which will be taken to avoid further violations; and {3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Where good cause is shown, consideration will be given to extending your response time.

8202250265 820209 PDR ADGCK 05000410 O', ' ', P.DR'...

~

(

i 1

f I

.l

Appendix A

The responses directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-Sll.

D t d FEB69 1S82 sviy'on of Res>dent and Progec Inspection Rsc a

W. Starostec s, Director D'

'