Forwards IE Insp Rept 50-220/81-27 on 811001-31 & Notice of Violation
ML17053C941
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/13/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C942 List:
References
NUDOCS 8112010532
Download: ML17053C941 (4)


See also: IR 05000220/1981027

Text

Docket No. 50-220

R

Niagara

mohawk Power

Cor poration

ATTN:

Hr. T. E.

Lempges

Vice President

Nuclear Generation

300 Erie Boulevard Hest

Syracuse,

New York

13202

NOV 1 3 'l981

SRHRD~p~

I-

ON'b ~ ~"~

Qatar

CO

O~

S

q)1P

R

6

Gentlemen:

Subject:

Inspection

No. 50-220/81-27

This refer s to the routine, safety inspection conducted

by Nr. S. Hudson of

this office on October 1-31, 1981, at Nine tiile Point, Unit 1, Scriba,

New York of activities author ized by NRC License

No. DPR-63 and to the

discussions of our findings held by Yir. Hudson with Hr. T.

Roman of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection

and Enforcement Inspection Report vihich is enclosed with this

letter.

tlithin these areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.-

Based

on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements.

as set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

This item of noncompliance

has

been categorized into the levels described

in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You

are required to respond to this letter and in preparing your response,

you should follow the instructions in Appendix A.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy

of this letter and the enclosures will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or your

contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within (10)

days from the date of this letter of your intention to file a request for

, withholding; and (b) submit within 25 days from the date of this letter a

qnitten application to this office to withhold such information.

Consistent

with section 2.790(b)(1),

any such application must be accompanied

by an

affidavit executed

by the owner of the information vihich identifies the

document or part sought to be withheld,

and which contains

a full statement

of the reasons

on the basis which it is claimed that the information should

RI:DRPI: SDH

4 RI:DRPI: LTD

JMA

JWA

11/09/81

11/09/81

8iicP010532

811113

PDR

AOOCK 05000220

8

PDR

RI: DRP I:HBK

RI:D I:EJB

Igg

l

4

e

I

I

~

~ I

41

4

4'

  • ,

H

V

~

I

O

,I ff

E

~ '

1

J

H

'I

I

Li

I

I

I

4

M

1 i

E

I

I

I

J r

I

~I

I

El

I ~

~

E

~'f

'

EM

14

E

Il

E

I

I

M

I

I

II

I

E

h

~

~ I

~

'I

I=

il

V"'

E.

-> 4

44

II

M'

i

~

4

e

Niagara

Mohawk Power Corporation

be withheld from public disclosure.

This section further requires the

statement to address

with specificity the considerations

listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall

be

incorporated

as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the specified periods

noted above, the report will be placed in the Public Document

Room.

The telephone notification of your intent to request withholding, or

any request for an extension of the 10 day period which you believe

necessary,

should be made to the Supervisor, Files, Nail and Records,

USNRC Region I, at (215) 337-5223.

Should you have any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

Sincerely,

original Signed SV'-

Eldon J. Brunner, Chief, Projects

Branch No. 1, Division of Resident

and Project Inspection

Enclosures:

l.

Appendix A, Notice of Violation

2.

Office of Inspection

and Enforcement

Inspection Report

Number 50-220/81-27

cc w/encl:

T. Perkins,

General

Superintendent,

Nuclear Generation

T.

Roman, Station Superintendent

J. Aldrich, Operations

Supervisor

lJ. Drews, Technical Superintendent

E. B. Thomas, Jr., Esquire

Public Document

Room (PDR)

'ocal Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concur rences)

Chief, Operational

Support Section

(w/o encls)

7

l

e

h

7

i,

I I

-4

f-d

'1t Wd)

Ih

~ 7

ff fg

I

I

k

~ "

1

I

hd dl'

I I

~

k

I"~ d

7

H

e

I'

I .

7

I

I

I

V

Ih

I

~

~

I

I 7f ~

14

lh

1

7

W

H

I

(I

Hll

hl

~ 'g

I

7

~

I

II

hd

~I'

I

I

7