Forwards IE Insp Rept 50-410/81-10 on 810901-03.No Noncompliance Noted
ML17053C873
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/24/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C874 List:
References
NUDOCS 8110090236
Download: ML17053C873 (4)


See also: IR 05000410/1981010

Text

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Gerald

K.

Rhode

Vice President

System Project

Management

c/o Miss Catherine

R. Seibert

300 Erie Boulevard,

West

Syracuse,

New York

13202

SEP 34

1981

+Qzppc,orx

'lrg

)CQ

'fg It)I)'".

OCT

8 )98ta

l9l1CL2AR 8lt.u

ltnmy

CCMdhlIQ ON

Gentlemen:

Subject:

Inspection

50-410/81-10

This refers to the routine inspection

conducted

by Mr. Feil of this office on

September

1-3,

1981 of activities authorized

by

NRC License

No.

CPPR-112 at

Nine Mile Nuclear

Power Station, Unit 2, Scriba,

New York and to the discussions

of our findings held by Mr. Feil with Mr. J.

L. Dillon of your staff at the

conclusion of the inspection,

and to a subsequent

telephone

discussion

between

Mr. P.

Francisco

and Mr. R. Feil

on September

11,

1981.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the

inspector.

Within the

scope of this inspection,

no items of noncompliance

were observed.

However during the inspection

we found that

a program weakness

exists relating

to Regulatory reporting of potential deficiencies

in accordance

with 10 CFR 50.55(e).

You are requested

to inform this office within thirty (30) days of

receipt of this letter of the results of actions you have taken or plan to

take to improve your management

control

program in the area of reportability

of 'potential deficiencies identified in the attached

report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the NRC's

Public Document

Room.

If this report contains

any information that you (or

your contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within ten (10)

days

from the date of this letter of your intention to file a request for

withholding; and (b) submit within 25 days

from the date of this letter

a

written application to this office to withhold such information.

Consistent

with section 2.790(b)(l),

any such application

must

be accompanied

by an

affidavit executed

by the owner of the

in~fopgion which identifies the document

RI:RPS

1C

@~3:RPS

1C

l(1 (l891

/mjd

I'Kister

Brunner

S

/22/81

9/@81

9/y~/81

OFFICIAL RECORD

COPY

b ai,p92

ei fQQ pp2e3 pgppppi'p

I

POR

AOOCK

PO~R

L"

1~

~(

~ ~,

D

III

~

gN

u~~

h

PA

v

Niagara

Mohawk Power Corporation

SEP 24 19S)

or part sought to be withheld,

and which contains

a full statement of the

reasons

on the basis which it is claimed that the information should

be withheld

from public disclosure.

This section further requires

the statement

to address

with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

specified periods

noted above,

the report will be placed in the Public Document

Room.

The telephone notification of your intent to request withholding, or

any request for an extension of the

10 day period which you believe necessary,

should

be

made to the Supervisor,

Files, Mail and Records,

USNRC Region I, at

(215) 337-5223.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

O~iginol S1gneOBf,o~

Eldon J. Brunner, Chief, Projects

Branch ¹1, Division of Resident

and Project Inspection

Enclosure:

Office of Inspection

and Enforcement Inspection

Report

Number 50-410/81-10

cc w/encl:

Eugene

B. Thomas, Jr.,

Esquire

NMPC QA

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

R. A. Feil, Reactor Inspector

Chief, Operational

Support Section

(w/o encls)

OFFICIAL RECORD

COPY