ML16341E669
| ML16341E669 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/03/1988 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341E670 | List: |
| References | |
| NUDOCS 8805270054 | |
| Download: ML16341E669 (4) | |
See also: IR 05000275/1988014
Text
'k
~ ~
<
~
4J
'I
~ ~
W,,) atl
~
',
<PI& <,"
i i ~
a
~ a
MAY 8
)gag
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company-
77 Beale Street,
Room 1451
San Francisco, California 94106
Attention:
Mr. J.
D. Shiffer, Uice President
Nuclear Power Generation
Gentlemen:
Subject:
April 26, 1988,
Management
Meeting
This refers to the management
meeting held with Mr. Maneatis, yourself and
members of your staff at the Diablo Canyon Site on April 26,
1988.
A number of
topics were discussed
in the meeting
and are
summarized
the enclosed report.
In sumary,
performance
in a number of problem areas
identified last year has
improved.
However, recent events
and inspector findings at Diablo Canyon
indicate additional attention is needed
to provide additional
assurance
that
your expectations
for performance
are understood
and implemented
by all plant
personnel.
Specific problem areas
include individuals proceeding with work in
the face of uncertainty;
performing work not specified by, or without,
a
procedure;
and foreign material exclusion practices.
In addition, discussion
focused
on two concerns
areas
which have
been
problems
at other Region
U facilities:
maintenance
backlog
and configuration
management.
As our discussion
indicated,
the maintenance
backlog does not
appear
to be well understood
by plant management.
Although improvements
have
been
made in tracking backlog, the scope of the backlog
and length of time
required to complete
a task did not appear to be well understood.
With regard
to configuration management,
pending
a more detailed
assessment, it appears
that you have initiated such
a program.
We are interested
in your assessment
and progress
in these
areas
and look forward to future discussions.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public'Document
Room.
Sincerely,
Orig~i..iz):lynch by
Defhis F~r'4ir sch, Director
Division of Reactor Safety and
projects
Enclosure:
Inspection
Report Nos. 50-275/88-14
and 50-323/88-13
8805270054
880503
ADOCK 05000275
9
~
'
'" ~ :
~ ~ 'i
i 0 "w << 'aA
4
~ '
/v
~
c,
~
~ ~
'
~ t
s *w r,+ It'll*'<t:,4,
cc w/enclosure:
S.
D. Skidmore,
R.
F. Locke,
J.
D. Townsend,
PG&E (Diablo Canyon)
D. A. Taggert,
PG&E (Diablo Canyon)
R. S. Weinberg,
PG&E (Diablo Canyon)
T. L. Grebel,
PG&E (Diablo Canyon) State of California
Sandra Silver (Report Only)
bcc w/enclosure:
Project Inspector
Resident Inspector
docket file
G.
Cook
B. Faulkenberry
J. Martin
D. Persinko,
State of California
bcc w/o enclosure:
J. Zollicoffer
M. Smith
REGION
V
MMendonca/dot
DKir ch
5/
8
5/I// /88
EST
COPY
REQUEST
PY
ES /
YES /
NO
S
TO
ES /