Forwards IE Insp Repts 50-275/79-22 & 50-323/79-12 on 791023-26 & Notice of Deviation
ML16341B297
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/20/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A818 List:
References
NUDOCS 8003040684
Download: ML16341B297 (4)


See also: IR 05000275/1979022

Text

~p,g RE0(

G

0

AnO

I

~h

f

Cy

+a*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

Docket Nos.

50-275

50-323

SOY 20

1979

Pacific Gas

and Electric Company

77 8eale Street

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane, 0r.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection at Diablo Canyon Onits

1 and

2

This refers to the inspection

conducted

by Messrs.

D. F. Kirsch, D. P.

Haist and

G. Hernandez of this office on October 23-26,

1979 of activities

authorized

by

NRC Construction

Permit Nos.

CPPR-39

and CPPR-69,

and to

the discussion of our findings held with Mr. R.

D. Etzler and other members

of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspec-

tion report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During this inspection it was found that one of your activities appeared

to deviate from one of your commitments

in the

FSAR.

This item and reference

to the specific coIImitment are listed in Appendix A to this letter.

Please

submit to this office, within 30 days of your receipt of this notice, your

written comments

concerning this item,

a description of any steps that

have

been or will be taken to correct the deviation,

and the date all

corrective actions

were or will be completed.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If

this report contains

any information that you believe to be proprietary,

it is necessary

that you submit

a written application to this office, within

(30) days of the date of this letter, requesting that such information be

withheld from public disclosure.

The application must include

a full state-

ment of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary information

k

Pacific Gas

and Electric Company

NOV gO

)ging

identified is contained in an enclosure

to the application,

since the appli-

cation without the enclosure

wi11 also

be placed in the Public Document

Room. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

G. S. Spencer,

Chief

Reactor Construction

and Engineering

Support

Branch

Enclosures:

A.

Notice of Deviation

'.

IE Inspection

Report

No. 50-275/79-22

No. 50-323/79-12

cc w/o enclosure

B:

M. A. Raymond,

FG&E

J.

D. Morthington,

PG&E

R. D. Ramsay,

PG&E (Avila Beach)

f

cc w/enclosures

A & 8:

R.

D. Etzler,

PG&E (Diablo Canyon)

J.

B. Hoch, Project Engineer,

PG8E

I