ML16341A461
| ML16341A461 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/05/1973 |
| From: | Goller K US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Searls F PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341A458 | List: |
| References | |
| NUDOCS 8501030383 | |
| Download: ML16341A461 (8) | |
Text
g(lCI gy 4'
++,
es
~a dt e
UN lTED STATES
'LOC, ATOMIC ENERGY COMMlSSION DR WASHINGTON, D.C.
20545 "yarns os-Docket Nos.
50-275 and 50-323 4CVWyrC'I 'gf>
JLppllcliit ~ll4 Pacific Gas and Electric Company ATTN:
Hr; Prederic'k T. Searls Uice President and General Counsel 77 Beale Street San Prancisco, California 94106 Gentlemen:
Your application for facility operating licenses for the Diablo Canyon Nuclear Plant, Units 1 and 2, was received on October 2, 1973.
Enclosed for your information is a copy of the related notice which has bee~norsgarded to the Office of the Pederal Register for public-cation on October 19, l973.
This is a combined notice of receipt of the application and 'not'rce og consideration of issuance op t'aci'la'ty o~>~e~~Ic~ggge and.wprp'o'rCuh'sty-,dor a.,hearing,
- A1so, a notice og o~portunity for public participation in the AEC licensing action and public hearing has been sent to the newspapers
~B As with the construction permit application, the operating license application is on file at the San Luis Obispo County Pree Library, 1354 Bishop Street, San Luis Obispo, California 93401.
Other relevant documents, as they become available, will be on file for public inspection.
It is requested that you have one of your repre-sentatives make periodic checks of the material available and assure that revised and supplemental information is properly incorporated into the application and the Pinal Safety Analysis Repqpg apd that
<<II'Fg4 8501030383 84i2ii PDR ADQCK 05000275 H
. 0 1
)
V l1 l
l
Padific Gas and Electric Company any amendments,
- reports, and letters which you have filed with us are available.
We will send documents you file with us to the local document room.
Sincerely, Karl R. Goller, Chief Pressurized Water Reactors Branch No.
3 Directorate of Licensing
Enclosures:
l.
Federal Register No'ce 2.
List of newspapers 3.
Display Ad cc:
Philip A. Crane, Jr.,
Esq.
Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106
a at/,
~ tt 1
'h 4
I I
rr
,I
,r,
'I 1
>I
![~/-)['='[!.[ii" 0'"g)I,"1 Iiill
'!'- 'Ii,l-'i'-
'c')fry)tt(r ltl '..'
I"I'i /i L', I!!;
Ir',,'I'.'-!!P'[l
'!!!=i a (-Nhi!
Ir r.> i I',
I f
f r
I I
f
"'[llI.)Q-,""'(~I".4l';:~~3(JJL[.P.'I, <(3g')l" 4(-,'('.'-')t, Ii'(1
'!!>Il>Pi+~II(~!~Id~
~t='+i~
Ii A~) iI["~, [i
!'i'Pl. ~-"xl!~![A(-""[',P('Il"Il'I,"
SIA6'XS."-dnf>'~i(i,-'i'~)P.[,, l.'
~ '
4 0
APPENDIX A CONTINUATION OF THE CHRONOLOGY OF THE RADIOLOGICAL SAFETY REVIEW Note:
Documents referenced in this chronology (and previous chronologies listed in the Safety Evaluation Report and Supplement Hos.
1-6) are available for public inspec-tion at the NRC Public Document
- Room, 1717 H Street, N.W., Washington, DC, 20555, and at the Local Public Document Room for the Diablo Canyon Nuclear Power Station located at the San Luis Obispo County Free Library, P.
0.
Box X, San Luis Obispo, California, 93406.
September 10, 1976 Supplement Ho.
5 to the Safety Evaluation Report.
February 2, 1977 Report from NRC staff consultant (Dr. Newmark) entitled, "Notes on Approximate Relations for Sensitivity of Design Spectra to Varia-tions in Damping Factor and Ground Acceleration."
June 25,1977 Preliminary working draft report on seismic risk assessment from staff consultants (Or.
Hewmark and Dr. Ang).
July 14, 1977 Supplement Ho.
6 to Safety Evaluation Report.
July 18, 1977 Letter to applicant providing staff comments on proposed seismic design criteria - tanks, piping and equipment.
July 22, 1977 Letter from applicant transmitting revised security plan and attachment (enclosure withheld from public disclosure).
July 26, 1977 Letter from applicant transmitting Annual Financial Report for 1976.
July 27, 1977 Submittal of Amendment 51 consisting of information on fire protection rereview.
August 2,
'l977 ACRS Subcommittee meeting to discuss nonseismic aspects of operatino license application.
August 12, 1977 ACRS Full Committee meeting to discuss nonseismic aspects of operating license application.
0
~re<
0