ML16293A542
| ML16293A542 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 10/05/2016 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16293A318 | List:
|
| References | |
| CNL-16-135 R-P1854 | |
| Download: ML16293A542 (3) | |
Text
TVA WALL THICKNESS PROFILE SHEET REPORT NO:
\\Z-P\\854-PROJECT: ____
W~B.u.JJ.1-____ _
WELD NO:
- l-tJ8S-W(20 I - Rll-l- 0 UNIT: ______
....;,~~-------
Record Thickness Measurements As Indicated, Including Weld Width, Edge*To-Edge At o*
Position o*
9 o* 190* 210*
III 1~
CROWN HEIGHT: -----6L..L.11/~J,S,'":A;.a_ ____ _
CRQWN WIDTH:-----...:.*-E:7..=5~-----
SYSTEM:
RV
-tr Weld Edge 5
Ca.es1de DIAMETER: _____
__,;i4u,,...0.__ ______ _
WELD LENGTH: ____
.L,/g,2-...'.:..;75-._ _____ _
~~.J--!--1--------------------
REVIEWED BY~Qt @MO~lf'4<a ANH:
~*
-~~~~~---
LEVEL: l(\\
DATt;*\\- 3l-\\!J EXA.MINER::_..!.-J(l:fd~~~~~--
LEVEL:. ____
DATE:
PAGE S° OF.
TV A. 19668 (NM*89)
TVA PROJECT:
WBN I
SYSTEM:
RV REPORT Nu.:
Office of Nuclear Power UNIT:
- l WELD N0
- 2-(}8S-wotJl-Rll-l-O K~ Pl854 t--L.Z(
WELD NUMBER Item 1 ltem2 Item 3 ltem4 Watts Bar Unit 2 TV A Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 2-085-W001-R11-1-0 Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic 1.25 Item 5 inches
~ltem6 r
J ltem7 Item 8 Item 9 Item 10 Item 11 Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 One sided examination due to Cap 0.2775 0
0.2875 0.2875 R-P1~54 4_1 directions 1_2._7_5linches Initials JA cu. In.
Date 11/1/2012 7