TVA WALL THICKNESS PROFILE SHEET REPORT NO:
PROJECT: ___
....;l}J~Bi<..l.N...L...-_____ _
UNIT: ______
J... _______ _
Record Thickness Measurements As Indicated, Including Weld Width, Edge*To-Edge At 0° Position o*
90" 180" 270" m x *
- 7{
rn 3.35.3.4+ 3..U 3.17 rn 10, 3.A~ 3.~~ 3.:/.Z
[!]
lJ.97 3.~ 3,1g 3,"
[!)
L1.'f.;i l3.14 3..A/ 3.05' CROWN HEIGHT: ___
...:...F.::Z:.::U~.S:;../1-iu._. ____ _
CRQWN WIDTH: ___
........__/,.....:I&>::;_ _____ _
WELDNO: ____
~W_P_-~1_3 __________ ~
SVSTEM: _______ p_z_R...;._ __ ~----~-
Flow...
- Weld Edge 5
S/167..L
-Side DIAMETER: -----..o:~:..:.r_O _______ _
WELD LENGTH: ____
4...!..~i*~7:....._ ______ _
s11 FE"TY Nozzle-
~--/.'t8 __
/e.. Std<.,
ANll:
DATE*
1-(1,-11 LEVEL:~
10-PAGE
{a OF l'"t:>
DATE:
TV A 19668 (NP-5'-89) 1-108-?99*44
vJBN;?.
PZR WP-t3 SAFeTY NOZZLE
,.,___ /. '18
]Ill
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TV A Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-13 ( 45 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.4 10.23 3.24 6.48 6.48 Measured Fields 2.7 46.7 K,\\:>l~~'i sq. in.
41directions sq. in.
46.7linches Initials JA Date 10/25/2010 cu. In.
cu. In.
cu. In.
cu. In.
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-13 ( 60 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume
- add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.4 10.3225 0.365 6.48 6.48 Measured Fields 2.7 I
~-? bcft.t sq. in.
. 4ldirections
- 46. 71 inches Initials JA Date 10/25/2010 cu. in.
cu. In.
cu. In.
cu. In.
WELD NUMBER Item 1 ltem2 Item 3 ltem4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-13
( 0 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration Measured Fields 4.4 I
8.64 46.7 8.64 8.64 46.7 8.64
\\\\.D\\a8L\\
"sq. in.
41directions sq. in.
- 46. 71 inches Initials JA Date 10/25/2010 cu. in.
cu. In.
cu. In.
cu. In.
cu. In.
L~D