Text
- WALL THICKNESS PROFILE SHEET REPORT NO:
PROJECT: ___
...LW B;.:..N....__ _____ _
WELD NO: ___
W~P_-..:..1..:...\\ ------
UNIT: _____
.....:~:;...;....-------
SYSTEM: __
____;p;,_z.;;.....;_t...:.~-------
Record Thickness Measurements As Indicated, Including Weld Width, Edgt*To*Edge At 0° Position o*
90° 180° 270° m *
- x- *
[!)
3.~( 3.tf< 3."' 3.&,g rn 3.1( ~+:; 3.IS' 3,()J..
[!]
2.'n 3.13 3.0~ 3.()7 Ul
,,(,7q ~.8~ i.8J ).-8J.
- Weld Edgt 5
51/e:Z'-
side Flow...
CROWN HEIGHT: ___
.....:;H-.Z.=:.;;,:£6~/I:...... ____ _
DIAMETER: -----....;~;..;a;.:.....:;...._4-;{J'_;;,,,,;,,;,~..;.'...;.'..::0~--
CRQWN WIDTH: _____
J_,..;,.4. ______ _
WELD LENGTH: ___
_...;::3,_q~, &>......_ ______
SPRI/ Y
!VOZZ l reacl1n LEVEL: ___ -"--..,,.------
REVIEWED e~G, ~<::f) we,,1;1 ANll:
~
u DATE
/-7};-/p LEVEL:
l lL DATE: l0-31 *(() L.:,:.:.:.::
1=========-I DATE:
PAGE OF l'P
'NA 19668 (NP-5'-89)
WBN i
{, 9 -------1 WP-11 Sf'RAY tVOZZ{~
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TV A Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-11
( 60 Deg )
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 10.638 8.56125 5.72 5.72 Measured Fields 39.7 39.7 39.7 4.... ldirections
- 39. 71 inches cu. In.
cu. In.
cu. In.
CU. In.
CU. In.
- 14 *. %
Initials JA Date 10/25/2010
WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-11
( 45 Deg)
Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.2 8.62 8.56125 5:72 5.72 Measured fields 2.6 39.7
~.Pt~&-3 sq. in.
4,directions sq. in.
- 39. 71 inches Initials JA Date 10/25/2010 cu. in.
cu. In.
cu. In.
cu. In.
Item 9 Item 10 Item 11 Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 7.8 Initials JA Date 10/25/2010 cu. In.
cu. In.