Report No. R-P1283, Wall Thickness Profile Sheet. (Sketch)
ML16293A503
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/05/2016
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16293A318 List: ... further results
References
CNL-16-135 R-P1283
Download: ML16293A503 (5)


Text

TVA

  • WALL THICKNESS PROFILE SHEET REPORT NO:

PROJECT: ___

...LW B;.:..N....__ _____ _

WELD NO: ___

W~P_-..:..1..:...\\ ------

UNIT: _____

.....:~:;...;....-------

SYSTEM: __

____;p;,_z.;;.....;_t...:.~-------

Record Thickness Measurements As Indicated, Including Weld Width, Edgt*To*Edge At 0° Position o*

90° 180° 270° m *

  • x- *

[!)

3.~( 3.tf< 3."' 3.&,g rn 3.1( ~+:; 3.IS' 3,()J..

[!]

2.'n 3.13 3.0~ 3.()7 Ul

,,(,7q ~.8~ i.8J ).-8J.

  • Weld Edgt 5

51/e:Z'-

side Flow...

CROWN HEIGHT: ___

.....:;H-.Z.=:.;;,:£6~/I:...... ____ _

DIAMETER: -----....;~;..;a;.:.....:;...._4-;{J'_;;,,,,;,,;,~..;.'...;.'..::0~--

CRQWN WIDTH: _____

J_,..;,.4. ______ _

WELD LENGTH: ___

_...;::3,_q~, &>......_ ______

SPRI/ Y

!VOZZ l reacl1n LEVEL: ___ -"--..,,.------

REVIEWED e~G, ~<::f) we,,1;1 ANll:

~

u DATE

/-7};-/p LEVEL:

l lL DATE: l0-31 *(() L.:,:.:.:.::

1=========-I DATE:

PAGE OF l'P

'NA 19668 (NP-5'-89)

WBN i

{, 9 -------1 WP-11 Sf'RAY tVOZZ{~

WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TV A Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-11

( 60 Deg )

Required examination Volume in sq. in.

(width x height)

Number of scan directions Total Scan volume in sq. in.

Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 10.638 8.56125 5.72 5.72 Measured Fields 39.7 39.7 39.7 4.... ldirections

39. 71 inches cu. In.

cu. In.

cu. In.

CU. In.

CU. In.

  • 14 *. %

Initials JA Date 10/25/2010

WELD NUMBER Item 1 Item 2 Item 3 ltem4 Item 5 ltem6 Item 7 Item 8 Item 9 Item 10 Item 11 Watts Bar Unit 2 TVA Procedure N-GP-31 Attachments 3 & 4 Worksheet Version 1.0 dated 07/01/09 WP-11

( 45 Deg)

Required examination Volume in sq. in.

(width x height)

Number of scan directions Total Scan volume in sq. in.

Total length of weld Total required exam volume in cubic inches Exam volume acheived (sq. in.) in direction 1 X length of weld achieved Exam volume acheived (sq. in.) in direction 2 X length of weld achieved Exam volume acheived (sq. in.) in direction 3 X length of weld achieved Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 4.2 8.62 8.56125 5:72 5.72 Measured fields 2.6 39.7

~.Pt~&-3 sq. in.

4,directions sq. in.

  • 39. 71 inches Initials JA Date 10/25/2010 cu. in.

cu. In.

cu. In.

cu. In.

Item 9 Item 10 Item 11 Exam volume acheived (sq. in.) in direction 4 X length of weld achieved Determined the acheived exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 Scan limitation due to Nozzle configuration 7.8 Initials JA Date 10/25/2010 cu. In.

cu. In.